Notifies That Emergency Plan Completely Reformatted as Manual & Reset to Rev 0,effective on 871101.Emergency Plan Formerly Designated as Administrative Procedure AP.500. Summary of Changes Encl
ML20236X756
Person / Time
Site: Rancho Seco
Issue date: 11/25/1987
From: Coward G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
AGM-TA-87-239, NUDOCS 8712100240
Download: ML20236X756 (3)


Text

- - - -- - - - -

OSMUD "'E' SACRAMENTO MUNICIPAL UTIUTY DISTRICT D P. O. Box 15830, Sacramen!o CA36hif$"38830, (916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA R81 DEC -I A 10: 5Lt November 25, 1987 AGM-d'A 87-239 U.S. Nuclear Regulatory (bmmission ATIN: J.B. Martin, Regional Administrator Region V Office of Inspection and Enforcement 14450 Maria lane, Suite 210 Walnut Creek, CA 94596 CHANGES MADE TO RANOD SEUD D4ERGENCY PIAN

Dear Mr. Martin:

In accordance with 10 CFR 50.54(q), this letter notifies you of changes made to the Rancho Seco Emergency Plan. These changes became effective on November 1, 1987. A summary of these changes is included as Attachment 1 to this letter.

The Rancho Seco Emergency Plan has been completely reformatted as a manual and reset to Revision 0. The Emergency Plan was formerly designated as Administrative Procedure AP.500.

Due to the complete reformatting being done on the Emertjency Plan, and the differences in sections ard section revisions in the old AP.500, a Revision 0 for the new Rancho Seco Emergency Plan was considered the best approach.

Please contact me if you have any questions. Members of your staff with questions requiring additional information or clarification may contact Ibn Martin, Manager Environmental Protection Department at (916) 452-3211, extension 4824.

Sincerely,

, b l George A. Cowartl Assistant General Manager, IAlclear Technical and Administrative Services Attachment 9712100240 871125 PDR ADOCK 05000312

/ Il p- PDR RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 95638 9799;(209) 333 2935

  • 4

(

1 ATfAG EE27T 1 The following simerizes the major changes to the Rancho Seco  !

Emergency Plan which became effective on November 1, 1987.

'Ihe Emernency Plan:

Section Charnes 1.0 All acronyms and definitions that were defined by Radiation Protection arxl Technical Specifications were eliminated.

2.0 Inconsistencies between the Emergency Plan and the counties' plans were eliminated. The information on other related plans was consolidated in this section.

3.0 The Emergency Action Levels were made consistent with NUREG 0654 requirements.

4.0 'Ihis is a new section added to conbine all the support services l available which were variously located throughout the previous issue of the plan, j 5.0 'Ihe Emergency l

Response

organization ;I was streamlined and clearer reporting chains established. The plant f ;

organization was revised

]

and clarified. Specific NRC audit findings were corrected.

l l

I

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ J

. l.

Attachment 1, page 2 6.0 Criteria of NUREG C654, -

10CFR50.476 10CFR50.73 ,

and 10CFR50 Appendix E I added ard inconsistencies deleted.

7.0 All drawings were updated along with the lists of Communication equipment.

'Ihe Emenyency Response Facilities description was revised and corrected to actual conditions.

8.0 Training was properly assigned to Emergency Preparedness Training.

Requirements identified in various parts of the plan were consolidated.

9.0 No major changes.

10.0 All references were verified and unused references deleted.

Appendix A New Procedure numbers added and list of implementation program added.

Appendix B List of equipment was removed ard only physical location of cabinets provided.

Apperdix C 'Ihe cross-reference flun the Table of Contents was corrected and added.

Appendix D "Intters of Agreements" were revised to reflect actual expiration dates.

Appendix E No changes were made-material placed in Document Control and I

removed from the plan.