Provides Info Requested by NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Piping in Condensate, Feedwater,Emergency Condensate,Emergency Feedwater,Main Steam,Extraction Steam & Cold & Hot Reheat Sys ResearchedML20238E341 |
Person / Time |
---|
Site: |
Fort Saint Vrain |
---|
Issue date: |
09/09/1987 |
---|
From: |
Robert Williams PUBLIC SERVICE CO. OF COLORADO |
---|
To: |
Martin R NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
---|
Shared Package |
---|
ML20238E343 |
List: |
---|
References |
---|
IEB-87-001, IEB-87-1, P-87310, NUDOCS 8709140285 |
Download: ML20238E341 (8) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update ML20128G0481996-09-30030 September 1996 Submits Rev to Psco Definitions of Contents of Documentation Packages Re Fsv Final Survey Project ML20129C0421996-09-20020 September 1996 Forwards Quarterly Submittal of 10CFR50.59 Rept of Changes, Tests & Experiments for Facility Decommissioning,Covering Period of 960601-0831 ML20133D7601996-09-16016 September 1996 Forwards Confirmatory Survey Plan for Fsv Nuclear Station Decommissioning Project,First Final Survey Rept Submittal- Vols 1-5.NRC Comments Incorporated.Spending Plan Attached ML20117P0711996-09-13013 September 1996 Describes Util Plans to Remove Bldg 28 from Plant Facility ML20129A4431996-09-11011 September 1996 Describes Util Plans for Demonstrating That Liquid Effluent Pathway & Surrounding Open Land Areas Satisfy 10 Mrem/Yr Criteria Provided in Plant Final Survey Plan ML20117K5291996-09-0404 September 1996 Provides Notification That Util Will Be Revising Financial Assurance Mechanism That Will Be Used to Cover Remaining Costs of Decommissioning Plant ML20117C7281996-08-22022 August 1996 Discusses Impact of Final Decommissioning Rule & Requests NRC Concurrence That Requirements to Submit & Obtain Approval of License Termination Plan Have Been Satisfied ML20116P3431996-08-16016 August 1996 Describes Actions to Remove Structures & Equipment Items from Fort St Vrain Facility for NRC Info.Requests That NRC Advise Util of Wishes to Perform Confirmatory Survey of Any Parts of New Fuel Storage Building Before 960903 ML20133D7551996-08-14014 August 1996 Provides Environ Survey & Site Assessment Program'S (Essap) Comments Re Review of Fsv Nuclear Station Decommissioning Project Final Survey Rept ML20116M0771996-08-14014 August 1996 Provides Suppl Response to Re Insp Rept 50-267/96-01 in Jan 1996 Re NRC Concerns About Fsv Final Survey Program.Specifically,Bias in Instrumentation Response Overestimating Amount of Contamination Present ML20116M1841996-08-13013 August 1996 Forwards Util Responses to NRC Comments in Re Use of in-situ Gamma Spectroscopy to Measure Exposure Rates During Plant Final Survey.Approval to Use in-situ Gamma Spectroscopic instrument,Microspec-2,requested ML20116K0061996-08-0909 August 1996 Submits Fort St Vrain Nuclear Station Decommissioning Project Final Survey Rept ML20116M1241996-08-0808 August 1996 Responds to NRC Bulletin 96-004, Chemical,Galvanic,Or Other Reactions in Spent Fuel Storage & Transportation. Informs That Modular Vault Dry Storage Sys Is Not Susceptible to Problems Addressed in Bulletin ML20116F3611996-08-0202 August 1996 Submits Revised Documentation for Fort St Vrain Final Survey Program ML20116F8141996-08-0202 August 1996 Informs of Util Intent to Modify Fort St Vrain Control Room,Which Will Make Certain Final Survey Locations Unavailable for Further Review.Final Survey Efforts Are Complete ML20116A4511996-07-19019 July 1996 Requests NRC Approval of Proposed Method to Fsv Final Survey Plan to Determine Exposure Rates in Prestressed Concrete Reactor Vessel 1999-03-26
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059H9471990-09-14014 September 1990 Forwards Rev to Proposed Physical Security Plan,Per .Encl Withheld (Ref 10CFR73.21) ML20064A6841990-09-14014 September 1990 Notifies That Ms Frazier License OP-5608-1 Terminated Effective 900906,per 10CFR50.74 ML20059K2091990-09-14014 September 1990 Requests That Dj Trumblee Reactor Operator License Be Terminated,Effective 900912 ML20059L5831990-09-14014 September 1990 Forwards Application for Amend to License DPR-34,changing Tech Spec Design Features Section to Remove CRD & Orifice Assemblies from Core Regions Defueled in Support of Plant Closure Activities ML20059D3231990-08-15015 August 1990 Forwards fitness-for-duty Performance Data Rept for Plant ML20058N5661990-08-0808 August 1990 Requests Exemption from 10CFR50.54(w)(1) Requirements for Min Property Insurance Coverage ML20058L8031990-08-0303 August 1990 Forwards GA-C18103, Fort St Vrain Cycle 3 Core Performance, Per Request for Addl Info Re Proposed Amend to Tech Spec Which Would Allow Util to Complete Defueling of Facility ML20058M1931990-07-31031 July 1990 Advises of Termination of Kj Einig Reactor Operator License, Effective 900727 ML20056A1791990-07-30030 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-267/90-07.Corrective Actions:Electrical & Mechanical Craft Personnel Assigned to Planning & Scheduling Organization ML20055H8091990-07-23023 July 1990 Forwards Addl Info in Support of 900622 SAR for Isfsi. Proprietary SAR Withheld (Ref 10CFR2.790) ML20056A1711990-07-20020 July 1990 Discusses Decommissioning Funding for Plant.Util Revised Decommissioning Financial Plan,Based on Safstor,Currently in Effect & Funds Will Be Accumulated Per Plan Provisions ML20055H6571990-07-20020 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Model 1153 or 1154 Transmitters Presently in Use at Plant ML20058P6891990-07-20020 July 1990 Forwards Security Plan for Proposed ISFSI for NRC Review,Per 900622 & 0412 Ltrs.Plan Withheld (Ref 10CFR73.21) ML20055G8601990-07-20020 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-267/90-07.Corrective Actions:Site Mgt Recognized Applicability of 10CFR50.72(b)(2)(vi) Re Previous Day Notification & Immediately Notified NRC ML20055H2811990-07-20020 July 1990 Forwards Rev 4 to Updated Fire Protection Plan ML20055G7061990-07-20020 July 1990 Forwards Application for Amend to License DPR-34,revising Tech Spec 6.1 to Remove Equipment to Support Plant Closure ML20059D1361990-07-13013 July 1990 Applies for Exemption from Payment of Annual Fees for FY90, Per 10CFR171 ML20055E0401990-07-0303 July 1990 Forwards Issue 3 to FPOR-18, Fire Protection Operability Requirements, as Result of Rev 3 to Facility Fire Protection Plan ML20055E0331990-07-0202 July 1990 Informs of Plans to Remove B Helium Circulator from Plant Prestressed Concrete Reactor Vessel in Mannner Similar to Previous Circulator Maint Outages.Requests Timely Ack of NRC Concurrence W/Undertaking ML20055E9171990-06-29029 June 1990 Resubmits Semiannual Radioactive Effluent Release Rept Jul-Dec 1989, as Result of Omitted Tables ML20044A8281990-06-29029 June 1990 Notifies of Termination of Wj Ashmore,License SOP-43244 & Requests That Reactor Operator License Be Terminated Effective 900620,per 10CFR50.74 ML20055D3931990-06-29029 June 1990 Forwards Response to Generic Ltr 90-04,requesting Info on Status of Generic Safety Issues.W/O Encl ML20055D1591990-06-22022 June 1990 Forwards Proposed Change to Updated Fsar,App B Re Use of Controls Other than Change Notice Sys to Implement Mods Such as Cutting & Capping of Piping,In Order to Obtain Positive Equipment Isolation ML20043J0581990-06-15015 June 1990 Forwards Proposed Issue 5 to Fort St Vrain Nuclear Generating Station Defueling Emergency Response Plan, Deleting Offsite Emergency Response Capabilities,Per Util 890816 Defueling SAR & NUREG-0654 ML20043D3291990-05-25025 May 1990 Forwards Response to NRC 900330 Ltr Re Violations Noted in Insp Rept 50-267/90-04.Encl Withheld (Ref 10CFR73.21) ML20055D2051990-05-25025 May 1990 Responds to Violations Noted in Insp Rept 50-267/90-06. Corrective Actions:Extensive Training on Radiological Emergency Response Plan Implementing Procedures Will Be Provided to Operating Crews Beginning in May 1990 ML20043C8981990-05-25025 May 1990 Responds to NRC 900427 Ltr Re Violations Noted in Insp Rept 50-267/90-05.Corrective Actions:Mgt Will Continue to Stress Requirement for Procedural Compliance on Ongoing Basis ML20043B3691990-05-22022 May 1990 Describes Util Current Plans for Removal of Certain Plant Equipment Items.Components to Be Removed Have No Required Nor Useful Function During Planned or Postulated Remaining Defueling or Shutdown Conditions ML20043A9491990-05-11011 May 1990 Forwards Issue 59 to AOP-K-1, Environ Disturbances - Earthquake. ML20042F9771990-05-0404 May 1990 Forwards Assessment of Possible Sources of Water in Plant Core,Means of Detecting Water in Pcrv & Effects of Water Ingress on Reactivity,For Info ML20042F9011990-05-0101 May 1990 Forwards Conceptual Plan & Cost Estimates for Early Dismantlement of Fort St Vrain Pcrv, Per NRC 900315 Request ML20042E8911990-04-27027 April 1990 Requests 30-day Extension to 900529 to Submit Response to Violations Noted in Insp Rept 50-267/90-04 ML20042F3111990-04-26026 April 1990 Forwards Application to Amend License DPR-34,providing Tech Spec Changes Needed to Complete Defueling ML20012D4711990-03-19019 March 1990 Requests Approval of Encl Exemption Request Allowing Util to Accumulate Decommissioning Funds Beyond Termination of Operations ML20012B7541990-03-0707 March 1990 Informs of Electronic Transfer of Fees on 900307 for Invoice IO547 ML20011F4691990-02-22022 February 1990 Responds to NRC 900116 Ltr Re Violations Noted in Insp Rept 50-267/89-23.Violation Re Fire Doors 13 & 9 Between 480-volt Ac Switchgear Room & Bldg 10 Propped Open on 891129 Disputed.Improved Communications Underway ML20006E7821990-02-15015 February 1990 Forwards Responses to 891004 Questions Re Decommissioning Financial Plan ML20011E8941990-02-0707 February 1990 Responds to 890719 NRC Bulletin 89-002 Re safety-related Anchor/Darling Model S350W Swing Check Valves.Licensee Reviewed Plant Data Base & Design Documents & Concludes That No Anchor/Darling Model S350W Valves Installed at Plant ML20011E7861990-02-0707 February 1990 Forwards Overview of Evaluation on Compliance W/Environ Qualification Regulation (10CFR50.49) During Defueling of Facility.During Defueling,Pcrv Will Be Maintained at Nearly Atmospheric Pressures & Rapid Depressurization Not Possible ML20011E5031990-02-0606 February 1990 Notifies of Termination of Ma Rhoton Employment W/Util, Effective 900206 ML20006D6621990-02-0606 February 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Currently Established Preventive Maint & Tech Spec Surveillance Activities on HXs Remaining in Svc Will Continue ML20006B2091990-01-26026 January 1990 Forwards Fire Operability Requirements 3 & 14,Issues 3 & 4, Respectively,To Fire Protection Program Plan,Section FP.6.1. Changes Cover Halon Sys & Basis & Records Ctr Halon Sys ML20006B7791990-01-25025 January 1990 Forwards Application for Amend to License DPR-34,changing Section 7.1 of Tech Specs.Specifically,Senior Vice President,Nuclear Operations Revised to Vice President, Nuclear Operations & Nuclear Training Manager Revised ML20006A5001990-01-19019 January 1990 Notifies of Util Intent to Bore 10 Concrete Core Drills Into Prestressed Concrete Reactor Vessel Barrel Section at Various Elevations Found Necessary for Decommissioning Planning.Drillings Wil Begin on 900205.Assessment Encl ML20006A5041990-01-19019 January 1990 Responds to NRC 891218 Ltr Re Weaknesses Noted in Insp Rept 50-267/89-22.Corrective Actions:During Power Operations Three Licensed Reactor Operators Will Be Present in Control & Short in Emergency Public Address Sys Repaired ML20005G5001990-01-12012 January 1990 Forwards Approved Proposed Change to NPDES Permit to Use Halocide Product for Microbiological Control in Smaller Cooling Tower ML19354D8581990-01-0505 January 1990 Forwards Safety Assessment of Proposed Changes to Fire Protection Program Plan,Per P Erickson Request.Changes Cover Acceptance Criteria for Shutdown Cooling Following Fire & New Fire Protection Cooldown Trains 1 & 2 ML20005F5531990-01-0303 January 1990 Certifies That Util Has Implemented fitness-for-duty Program Meeting 10CFR26 Requirements ML20005D8921989-12-21021 December 1989 Forwards Proposed Change to Plant NPDES Permit ML19354D7441989-12-0808 December 1989 Requests Relief from Requirements of Generic Ltr 89-10 Re motor-operated Valves Since Plant Permanently Shut Down Since 890818 & Defueling Initiated on 891127 1990-09-14
[Table view] |
Text
_ - _ - - - - - - - _ -- -
O
- =. =--
I O rubiic service- bin $r7cEac201-os40 i September 9, 1987 OckpNottAMS, JR.
Fort St. Vrain wucttAn OPERATIONS Unit No. 1 P-87310 Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Attention: Robert D. Martin Regional Administrator - Region IV Docket No. 50-267
SUBJECT:
Response To NRC Bulletin 87-01
REFERENCES:
See Enclosure 1
Dear Mr. Martin:
Public Service Company of Colorado (PSC) herein provides the information requested by NRC Bulletin 87-01, " Thinning of Pipe Walls In Nuclear Power Plants", for Fort St. Vrain (FSV). Confirmatory Action 6 of SECY 85-370, dated November 22, 1985, (Reference 1) required PSC to perform inservice inspections on several critical areas of high energy piping in the Main Steam, Cold Reheat, Hot Reheat, and Feedwater systems. PSC completed those inspections and reported the results in P-86105, dated March 3, 1986 (Reference 4).
In addition, the following information is provided for each of the five items in NRC Bulletin 87-01. For the purposes of this response, piping in the Condensate, Feedwater, Emergency Condensate, Emergency Feedwater, Main Steam, Extraction Steam, Cold and Hot Reheat systems was researched.
Detailed Responses Item 1:
Identify the codes or standards to which the piping was designed and fabricated.
DO 7
'O !
_ _ _ - - .. i
P-87310 September 9,.1987 1 .
Response
ANSI B31.1-1967 is the construction code. Piping materials are per the following:
Feedwater - ASTM A106, Grades B and C, with specific requirements of A530 for some applications. Fittings are A234, Gr. WPB, Gr. WPC, or A216 (2" and smaller: A105 or A181, Cl.70) , Gr. WCB, WCC.
Condensate - ASTM A106, Grade 8. Fittings are A234, Gr. WPB. (2"and smaller: ASTM A105 or A181, C1.70)
Emergency Feedwater - ASTM A106, A105 and A530, as applicable. Also, see Response 4C. Fittings are A234, Gr. WPB or WPC, or R16, Gr. WCB or WCC. (2" and smaller:
A105 ora 181,C1.70)
Emergency Condensate - ASTM A106, Gr. B or A105. Fittings are A234, Gr. WPB. (2" and smaller: A105 or A181, C1.60 orc 1.70)
Main Steam - ASTM A335, Gr. P22 or A530. Fittings are A217, Gr. WC9, or A234, Gr. WP22. (1" and smaller: A182, Gr. F22).
Extraction Steam - ASTM A155, Gr. KC70. Fittings are A234, WPC. (2" and smaller: A105 or A181, C1.70)
Cold Reheat - ASTM A106, Gr. B and A515, Grade 60. Fittings are A216, Gr. WCB or A234, Gr. WPB (2" and smaller: A105' or A181, C1.70)
Hot Reheat - ASTM A155, Gr. 2 1/4 Cr, Cl 1, and A335 Gr. P22.
Fittings are A217, Gr. WC9, or A234, Gr. WP22. (2"and smaller: A182, Gr. F22)
Item 2:
Describe the scope and extent of your programs for ensuring that pipe wall thicknesses are not reduced below the minimum allowable thickness. Include in the description the criteria that you have established for:
- a. selecting points at which to make thickness measurements
- b. determining how frequently to make thickness measurements
- c. selecting the methods used to make thi:kness measurements
- d. making replacement / repair decisions
Response
PSC presently has on-going programs in place for the inspection of piping in the Condensate and Extraction Steam systems. Before the Surry Unit 2 event. PSC had initiated inspections to check for possible occurrences of erosion -
induced wall thinning in the Extraction Steam and Turbine Vents and Drains systems. This is
a l 1
P-87310 September 9,'1987-reported in Engineering . Evaluation' EE-ISI-0001, Revision C i (Attachment 1) and addresses points a-d of Item 2. After the Surry Unit 2 event, PSC performed inspections in the Condensate system to identify potential occurrences of erosion - corrosion induced wall thinning.. This is reported in Engineering Evaluation EE-ISI-002, Revision A (Attachment 2) and addresses points a-d of Item 2. NRC ;
Inspection Report 87-05, dated March 16, 1987, indicated that this program (in draft form) showed " evidence of considerable thought and effort". (Reference 11) l Item 3:
For liquid-phase systems, state specifically whether the following factors have been considered in establishing your criteria for selecting points at which to monitor piping thickness (Item 2a):
- a. piping material (e.g., chromium content)
- b. piping configuration (e.g., fittings less than 10 pipe diameters apart)
- c. pH of water in the system (e.g., pH less than 10) ;
- d. system temperature (e.g., between 190 and 500 degrees Fahrenheit) i
- e. fluid bulk velocity (e.g., greater than 10 ft/s)
- f. oxygen content in the system (e.g., oxygen content less than 50 ppb)
Response
EE-ISI-002, Revision A, (Attachment 2), addresses each point in Item 3 except point C, which was not a factor in selecting points due to the uniform pH level within the area of inspections. '
Item 4:
Chronologically list and summarize the results of all inspections that have been performed, which were specifically conducted for the purpose of identifying pipe wall thinning, whether or not pipe wall thinning was discovered, and any other inspections where pipe wall thinning was discovered even though that was not the purpose of that inspection.
- a. Briefly describe the inspection program and indicate whether it was specifically intended to measure wall thickness or whether wall thickness measurements were an incidental determination.
- b. Describe what piping was examined and how (e.g., describe the inspection instrument (s), test method, reference thickness, locations examined, means for locating measurement point (s) in subsequent inspections,
- c. Report thickness measurement results and note those that were identified as unacceptable and why.
P-87310 September 9, 1987
- d. Describe actions already taken or planned for piping that has been found to have a nonconforming wall thickness. If you have performed a failure analysis, include the results of that nalysis. Indicate whether the actions involve repair or replacement, including any change of materials.
Response
PSC contacted Mr. Conrad McCracken, designated NRR Technical Contact, for clarification of "and any other inspections where pipe wall thinning was discovered even though that was not the purpose of that inspection". Since Fort St. Vrain is a relatively old plant, it would be extremely difficult to assure that all information relative to pipe wall thinning was found and reported to the NRC, via this Bulletin response, for the secondary systems. Mr. McCracken indicated that manpower-intensive research was not required and that much information could be gathered "from memory", in order for NRC to '
l understand how widespread the erosion-corrosion problem actually is.
Therefore, PSC has investigated, to the extent possible, the Change l Notice (CN) system, Nonconformance (NCR) program, Station Service Request (SSR) system, Reportable Occurrence (RO) and Licensee Event Report (LER) systems from 1980 to the present, for 2" and larger piping. Although FSV has experienced various wall thinning in smaller lines, that data has not been presented here.
Additionally, PSC has conducted interviews with experienced personnel in the PSC Production, Engineering, Licensing, and QA departments who are/were involved in plant repair efforts. This was done in response to NRC questions (NRC letter, dated December 26, 1985, G-85504, Reference 2) relative to Confirmatory Action 6 of SECY 85-370 (Reference 1) and the results are contained in PSC letter to NRC, P-86004, dated January 3, 1986, Table 6-1, (Reference 3), and excerpts are represented here as Attachment 3.
The detailed response to Item 4 is arranged in three parts: (A) planned inspections, (B) historical occurrences, and a separate
, section (C) for particular problems associated with Emergency l
I Feedwater to the helium circulators.
A) Planned Inspections March 3, 1986 - PSC provided NRC with the. results of inspections performed pursuant to
...Confi rmatory Action 6 of SECY 85-370 dieference 1) in PSC letter P-86105, dated March 3, 1986. This is Reference 4 and addresses details requested by Item 4, points a-d. '
October 2, 1986 - PSC initiated Engineering Evaluation EE-ISI-0001, Revision C (approved October 2, 1986) for inspection of piping in the Extraction l Steam and Turbine Vents / Drains systems for
P-87310 September 9,~1987' possible occurrences of erosion - induced wall thinning. ~ This was-in response to INP0 SOER 82-11. EE-ISI-0001.is presented here as Attachment 1 and provides._ details requested by Item 4, points a-d. "
August 7, 1987 - PSC initiated- EE-ISI-002, Revision A, (Attachment 2, approved August 7, 1967) for inspection of the Condensate system piping in response to the Surry Unit 2 event. Specific details _ requested by Item 4, points a-d, are l presented in Attachment 2.
1 B) Historical Occurrences In addition to the information presented in PSC letter P-86004 (Reference 3), with excerpts as Attachment 3, the following information is provided. To'the best of PSC's knowledge and belief, given the limitations of the documentation research capabilities' for secondary systems, the historical occurrences of pipe wall thinning were found to be:
November 30, 1983 - Problems with the bypass flash tank leakoff line to the dearator. (2") were identified on Plant Trouble. Reports (PTR)83-11-0525and 83-11-0526. Subsequently, Station Service.
Requests (SSR) 8450196500 and '450202100 8
replaced lines 2"L32163-021, 2"L32164-D21, and 2"L32140-09 (between V-32314 and M-3219), t on drawing PI-53. Further details are not available at this time.
C) Emergency Feedwater To The Helium Circulators- .
FSV has experienced pipe wall thinning in_1" piping downstream of pressure control valves in the Emergency Feedwater system which are designed to bleed cff any leakuge from the main valves'to the turbine i
water drain tank under the no-flow conditions which normally exist.
This has been reported via Reportable Occurrences (RO) 80-23, 80-32,
' 80-58,82-034, and 83-015 (References 6-10). The final report of R0 80-58, dated October 3, 1984, indicated that Change Notice (CN).1687 changed the valve bodies of PV-21243-1 and PV-21244-1, and a portion of the downstream piping, from carbon steel to stainless steel to be more erosion - resistant. No other corrective action: are planned.
I I
l
P-87310 September 9, 1987 Item 5:
Describe any plans either for revising the present or for developing new or additional programs for monitoring pipe wall thickness.
Response
PSC letter to NRC, P-87018, dated February 13, 1987 (Reference 5),
status of the FSV Inservice was submitted Inspection describing (the overallISIT) Program and the FSV ISIT Program Plan and Testing PSC has committed to submit a draft Program Plan to NRC by April 4, 1988. In that submittal, PSC will include whatever revised, additional, or new pipe wall thinning inspection programs as have i been determined to be prudent.
If there are any questions regarding the information provided in this letter and attachments, please call Mr. M. H. Holmes at (303) 480- '
6960.
Very truly yours, i
R. O. Williams, Jr.
Vice President Nuclear Operations R0W/WMD:dvd Attachments Enclosure cc: Mr. R. Farrell Senior Resident Inspector Fort St. Vrain
_ - _ _ _ . w
__. = . _ _ _
P-87310 September 90 1987 Enclosure 1 References for P-87310
- 1. SECY 85-370, dated November 22, 1985. (G-85488)
- 2. NRC letter, Berkow to Walker, dated December 26, 1985. (G-85504)
- 3. PSC letter, Warembourg to Berkow, dated January 3,1986. (P-86004)
- 4. PSC letter, Warembourg to Berkow, dated March 3, 1986. (P-96105)
- 5. PSC letter, Brey to Berkow, dated February 13,198/. (P-87018)
- 6. Reportable Occurrence 80-23, dated June 6, 1980.
- 7. Reportable Occurrence 80-32, dated July 15, 1980.
- 8. Reportable Occurrence 80-58 (final), dated October 3, 1984
- 9. Reportable Occurrence 82-034, dated September 13, 1982
- 10. Reportable Occurrence 83-015, dated April 8,1983.
- 11. NRC Inspection Report 50-267/87-05, dated March 16, 1987. (G-87081) l l
}
.. - J l
-l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION i
In the Matter Public Service Company of Colorado ) Docket No. 50-267 Fort St. Vrain Unit No. 1 ).
1 AFFIDAVIT R. O. Williams, Jr., being first duly sworn, deposes.and says:
That he is Vice President, Nuclear Operations, of Public Service Company of Colorado, the Licensee herein, that he' has, read the foregoing information and knows the contents thereof, and that the statements and matters set forth therein are true and. correct to the best of his knowledge, information and belief.
s j 4
/ /.46-R. O. Williams, Jr. I Vice President Nuclear Operatier*
STATE OF (Win &+) )
)
COUNTY OF $ men / )
Subscribed and sworn to before me, a Notary Public on this V@' day of (hn/fm /w/ , 1987.