ML20207N065

From kanterella
Revision as of 07:02, 12 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-354/86-57 on 861201-04 & Notice of Violation
ML20207N065
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/09/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
Shared Package
ML20207N067 List:
References
NUDOCS 8701130425
Download: ML20207N065 (2)


See also: IR 05000354/1986057

Text

o

.

JAN 0S E37

Docket No. 50-354 License No. NPF-57

Public Service Electric and Gas Company

Hope Creek Generating Station

ATTN: C. A. McNeill, Jr.

. Vice Presid.ent, Nuclear

P.O. Box 236

Hancocks Bridge, New Jersey 08038

Gentlemen:

Subject: Inspection No. 50-354/86-57

This refers to the special safety inspection conducted by Mr. J. J. Kottan of

this office on December 1-4, 1986 of activities authorized by NRC License

No. NPF-57 and to the discussions of our findings held by Mr. Kottan with

Mr. R. Salvesan and others of your staff at the Hope Creek Generating station,

at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I In-

spection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of. Violation, enclosed herewith as Appendix A. This violation has been

categorized by severity level in accordance with the " General Statement of

Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C

(Enforcement Policy). This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Although Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement of

explanation, we note that this violation was corrected prior to the completion

of our inspection, and therefore, no response with respect to this matter is

required.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

.

8701130425 870109

PDR ADOCK 05000354 \g \

G PDR

. ._ _

_

'

x

.

Public Service Electric 2

and Gas Company

Your cooperation with us in this matter is appreciated.

Sincerely,

Originni signeW

L

Thomas T. Martin, Director

O Division of Radiation Safety

and Safeguards

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Inspection Report No. 50_354/86-57

cc: w/encls.

R. S. Salve,sen, General Manager, Hope Creek Operations

A. E. Giardino, Manager, Station Quality Assurance

W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic -

Electric Company

L. A. Reiter, General Manager - Licensing and Reliability

Rebecca A. Green, Bureau of Radiation Protection

Public Document Room (PDR)

Local Public Document Room (LPDR)

4 Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

Robert J. Bores, DRSS

.

j

'

RI:DRS RI S RI S R- S

i r Pa k N 1m Bellamy Mar in

12/ /GS

JJ/h/86

h/ /86 1- 86

j/f g 7 12/ b/81)IR HC

0FFICIAL RECORD COPY 6-57 - 0002.0.0

12/31/86

b

-