ML20205F994

From kanterella
Revision as of 18:09, 29 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards App to SALP Board 5 Rept 50-305/86-01 for Jul 1984 - Dec 1985.App Consists of Summarization of 860403 Meeting to Discuss Details of Rept
ML20205F994
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/08/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20205F998 List:
References
NUDOCS 8608190377
Download: ML20205F994 (2)


See also: IR 05000305/1986001

Text

,

.

lWh

,

AUG 0 81988

Docket No. 50-305

Wisconsin Public Service

Corporation

ATTN: Mr. D. C. Hintz

Manager

Nuclear Power

Post Office Box 19002

Green Bay, WI 54307-9002

Gentlemen:

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP) 5

Board Report for the Kewaunee Nuclear Plant and our meeting of April 3, 1986

which discussed in detail the contents of the report.

Based on the formal exchange of information between our respective staffs, and

in the absence of verbal identification of discrepancies within the report or

formal written comments from you requiring resolution, no changes to the SALP

Board Report are necessary.

Enclosed, as an Appendix to the SALP Board Report, is a summarization of the

meeting which includes names of those persons in attendance. Issuance of the

,

Appendix serves as the final step in the SALP assessment process.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter with the referenced

attachments, will be placed in the NRC's Public Document Room.

No reply to this letter is required, however, should you have questions on the

SALP Board Report or Appendix thereto please let us know and we will be pleased

to discuss them with you.

Sincerely,

Driginal 9,1 W 4

.t s= c,. Kaw ler

e6081}Q@y $IS$oSOS James G. Keppler

POR PDR Regional Administrator

Attachment:

1. Appendix to SALP 5 Board Report

No. 50-305/86001

i

See Attached Distribution /63 . ,

\E3 /

A R'lII Ad RIII Mm O II R

ornon Baye /qg Schweibinz Jack w Gu' deinand

7/31 86 gg f6 yf5 Eb 16 yd%

us o er

7/31/86 6-% fl7 // g i 86

h 1Eyo

__ _ __ - ___

__

,

.

D. C. Hintz -2-

Distribution

cc w/ attachment:

C. R. Steinhardt, Plant

Manager

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Commission

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV -

-

L. W. Zech, Chairman

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, IE

RIII PRR

RIII SGA

State Liaison Officer, State of

Wisconsin

INP0