ML20207J287

From kanterella
Jump to navigation Jump to search
Ack Receipt of 860612 Rev 6 to Emergency Plan.Rev Consistent w/10CFR50.54(q) Requirements & Acceptable.Replacement Page for Page 1-3,Section 1.2 Does Not Include Page or Rev Number
ML20207J287
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/17/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
References
NUDOCS 8607280208
Download: ML20207J287 (2)


Text

'

3 JUL 17 G86 Docket No. 50-305 Wisconsin Public Service Corporation ATTN: Mr. D. C. Hintz Manager Nuclear Power Post Office Box 19002 Green Bay, WI 54307-9002 Gentlemen:

This is to acknowledge receipt of your letter dated June 12, 1986, which transmitted Revisinn 6 to the Kewaunee Nuclear Power Plant Emergency Plan.

We have completed our review of Revision 6 to the Emergency Plan and have detennined that it is consistent with the requirements of 10 CFR 50.54(q) and does not decrease the effectiveness of the plan. However, it is noted that the replacement page provided for Page 1-3, Section 1.2, does not include either a page number or revision number.

Be advised that 10 CFR 50.54(q) also requires prior NRC approval of any rhanges to your plan which may decrease the effectiveness of the plan. However, if your safety review assures that there is no decrease in emergency preparedness effectiveness, then changes to the plan may be made and implemented without prior NRC approval. In all cases, you must furnish copies of each change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Energency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any question regarding this letter, please contact Mr. T. Allen of my staff at (312) 790-5582.

Sincerely, 8607280200 060717 WdnaT sW W U. W-w PDR ADOCK 05000305 F PDR W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch i

l See Attached Distribution n l l

RI I RIII RIII f R II r,h Jackiw a er / O Alle /m3 n p

Wisconsin Public Service 2 JUL 17 g Corporation Distribution cc: C. R. Steinhardt, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch l Resident Inspector, RIII ,

John J. Duffy, Chief Boiler Section Ness Flores, Chairperson Wisconsin Public Service Comission W. Weaver, FEMA D. Matthews, EPB, 0IE

,