ML20080N006
| ML20080N006 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 02/28/1995 |
| From: | Marchi M WISCONSIN PUBLIC SERVICE CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-95-27 NUDOCS 9503060118 | |
| Download: ML20080N006 (1) | |
Text
. in,
l WISCONSIN PUBLIC SEWICE CORPORATION
? '
,m c.ca riac, :his 00J 45 6 dt.OfiffCdeC February 28,1995 10CFR 73.55(c)(9)(i)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies / Gentlemen:
Docket 50-305
~ Operating License DPR-43 Kewaunee Nuclear Power Plant Protection Acainst Malevolent Use Of Vehicles In accordance with 10CFR 73.55(c)(9)(i) enclosed by attachment to this letter is a summary description of the Kewaunee Nuclear Power Plant's proposed vehicle control measures as required by 10CFR 73.55(c)(7) and the results of the vehicle bomb comparison as required by 10CFR 73.55(c)(8).
Sincerely, 666A g M.L. Marchi Manager - Nuclear Engineering DSN/drj Attach' 9503060118 950228 s
PDR ADOCK 05000305 -
P PDR p[
cc -
US NRC Region III (w/ attach.)
US NRC Senior Resident Inspector (w/o attach.)
Enclosure Contains SAFEGUARDS INFORMATION l
Upon Separation This Pace is Decontrolled Kewaunee Nuclear Power Plant e North 490, Hwy.42 e Kewaunee, WI 54216-9510 e (414) 388-2560
- -