Forwards Insp Rept 50-305/96-12 on 961118-27 & Notice of Violation
ML20133E703
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/06/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Marchi M
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20133E706 List:
References
NUDOCS 9701130124
Download: ML20133E703 (2)


See also: IR 05000305/1996012

Text

- . _

t

,

o

January 6, 1997

l

l

l

Mr. M. L. Marchi

Manager, Nuclear Business Group

Wisconsin Public Service Corporation

Post Office Box 19002 l

Green Bay, WI 54307-9002

1

'

SUBJECT: PHYSICAL SECURITY INSPECTION REPORT NO. 50-305/96012(DRS)

Dear Mr. Marchi:

l

This refers to the NRC inspection conducted by Mr. J. L. Belanger of this office on

November 115 through November 27,1996, at your Kewaunee Nuclear Power Plant. At

the conclusion of the inspection, the results were discussed with members of your staff. l

The inspection's purpose was to assess implementation of your access authorization l

program and land vehicle barrier system to determine if they met regulatory requirements

'

and commitments to the NRC. Within these areas, the inspection consisted of a selective l

examination of procedures and representative records, observations, and interviews with

personnel.

For the areas reviewed during this inspection, your implementation of the access l

authorization program and vehicle barrier controls were characterized by strong technical l

support and good teamwork for resolving access authorization technicalissues and

installing a vehicle barrier system. We are concerned, however, about a violation that you I

failed to amend your physical security plan to commit to the implementation and use of i

the vehicle barrier system. l

This violation is cited in the enclosed Notice of Violation, and the circumstances

surrounding the violation are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and the enclosure will be placed in the NRC Public Document Room.

1

l

9701130124 970106

PDR ADOCK 05000305

l 0 PDR

._ -_. -- - . _ - = - _ _ _ _ _ - - - _ - _ - . - . ~ - _ - - -. - .-

l

'

.

.

M. L. Marchi -2- January 6, 1997

l

We will gladly discuss any questions you have concerning this inspection. Your

cooperation with us is appreciated.

l Sincerely,

,

Original Signed by Melvyn Leach (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket No. 50-305

Enclosures: 1. Notice of Violation

2. Inspection Report

No. 50-305/96012(DRS)

l

cc w/encis: C. R. Steinhardt, Senior

,

Vice President - Nuclear Power

'

C. A. Schrock, Manager, Kewaunee Plant

Vir0 i l Kanable, Chief, Boiler Section

Cheryl L. Parrino, Chairman,

Wisconsin Public Service Commission l

State Liaison Officer l

Distribution:

Docket File w/encis DRS w/encls A. B. Beach, Rlll w/encls

PUBLICM w/encls Rlll PRR w/encls Enf. Coordinator, Rlll w/encls l

OC/LFDCB w/encls SRI, Kewaunee w/encls CAA1 w/encls (E-mail)

DRP w/encls LPM, NRR w/encls W. L. Axelson, Rlll w/encls

\

g\

DOCUMENT NAME: G:\DRS\KEW96012.DRS

To ,eceive e copy of this document. Indicate in the ham: 'C" e Copy without attachment / enclosure *[* = Copy with attachment / enclosure

  • N" = No copy

OFFICE Rlli l@ p l, , , [Q Rl!I _

j) Rlli lv

J'C$

~~

NAME JBelanger 9f MJordarQQf. BClayton/GGrantNag ,

DATE 12//S/96 12kyOf 96 12tpj/96 'T 1M //gf7

l OFFICIAL RECOND COPY