Text
- . _
t
,
o
January 6, 1997
l
l
l
Mr. M. L. Marchi
Manager, Nuclear Business Group
Wisconsin Public Service Corporation
Post Office Box 19002
Green Bay, WI 54307-9002
'
SUBJECT:
PHYSICAL SECURITY INSPECTION REPORT NO. 50-305/96012(DRS)
Dear Mr. Marchi:
This refers to the NRC inspection conducted by Mr. J. L. Belanger of this office on
November 115 through November 27,1996, at your Kewaunee Nuclear Power Plant. At
the conclusion of the inspection, the results were discussed with members of your staff.
The inspection's purpose was to assess implementation of your access authorization
program and land vehicle barrier system to determine if they met regulatory requirements
'
and commitments to the NRC. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and interviews with
personnel.
For the areas reviewed during this inspection, your implementation of the access
authorization program and vehicle barrier controls were characterized by strong technical
support and good teamwork for resolving access authorization technicalissues and
installing a vehicle barrier system. We are concerned, however, about a violation that you
failed to amend your physical security plan to commit to the implementation and use of
the vehicle barrier system.
This violation is cited in the enclosed Notice of Violation, and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and the enclosure will be placed in the NRC Public Document Room.
1
l
9701130124 970106
ADOCK 05000305
l
0
._
-_.
--
-
. _ - = - _
_ _
_ _ - - -
_ - _ - . -
~ -
_ - - -. -
.-
.
l
'
.
.
M. L. Marchi
-2-
January 6, 1997
l
We will gladly discuss any questions you have concerning this inspection. Your
cooperation with us is appreciated.
l
Sincerely,
,
Original Signed by Melvyn Leach (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
Docket No. 50-305
Enclosures:
2. Inspection Report
No. 50-305/96012(DRS)
l
cc w/encis:
C. R. Steinhardt, Senior
,
Vice President - Nuclear Power
'
C. A. Schrock, Manager, Kewaunee Plant
Vir0 l Kanable, Chief, Boiler Section
i
Cheryl L. Parrino, Chairman,
Wisconsin Public Service Commission
State Liaison Officer
Distribution:
Docket File w/encis
DRS w/encls
A. B. Beach, Rlll w/encls
PUBLICM w/encls
Rlll PRR w/encls
Enf. Coordinator, Rlll w/encls
OC/LFDCB w/encls
SRI, Kewaunee w/encls
CAA1 w/encls (E-mail)
DRP w/encls
LPM, NRR w/encls
W. L. Axelson, Rlll w/encls
\\
g\\
DOCUMENT NAME: G:\\DRS\\KEW96012.DRS
To ,eceive e copy of this document. Indicate in the ham: 'C" e Copy without attachment / enclosure
- [* = Copy with attachment / enclosure
- N" = No copy
OFFICE
Rlli
l@
p l, , ,
[Q Rl!I
j)
Rlli
lv
_
NAME
JBelanger 9f
J'C$
~~
MJordarQQf.
BClayton/GGrantNag ,
DATE
12//S/96
12kyO 96
12tpj/96
'T
1M //gf7
f
l
OFFICIAL RECOND COPY
l3000'7
--- .-_
_
.. -,
-
- ,
- -
- -
-
-