Ack Receipt of Util Re Physical Security Plan at Plant.Addl Info & Revs Required & Supporting Comments Encl. Response to Comments Requested within 30 Days from Receipt of Ltr
ML20237J124
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/21/1987
From: Quay T
Office of Nuclear Reactor Regulation
To: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
References
GL-87-08, GL-87-8, NUDOCS 8708260018
Download: ML20237J124 (3)


Text

,

...c,-

Docket No. 50-305 Mr. D.C. Hintz Manager-Nuclear Power Wisconsin Public Servico Corp.

P.O. Box 19002 Green Bay, Wisconsin 54307-9002 M E1N

Dear Mr. Hinti:

This is to acknowledge receipt of the Wisconsin Public Service Corporation letter dated December 17, 1986, which transmitted a proposed amendment to the Kewaunee Nuclear Power Plant Physical Security Plan in response to the Miscellaneous Amendments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information'and revisions to the plan are required prior to our approval. The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is requested that you provide your response to these comments within'30; days from receipt of this letter.

The reporting and/or record keeping. requirements' contained in this letter-affect fewer than ten respondents; therefore, OMB clearance,is not required under P.L.96-511.

l Should you have any questions concerning the enclosed comments, please contact the reviewer, Barry Manili, at (301) 492-7077.

l Sincerely, A

7 l D Theodore J. Quay, Project Manager Project Directorate III-3 Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments RSGB rf Sec rf BManili CBuracker (2) cc w/ enclosure: Region III PKreutzer See next page TQuay , Docket'F.ile750s305A Case-File NRC^PDR RErickson w/o enc 1 Local'PDR LBush w/o enc 1

! 0FC :RSGB :RSGB :RSGB :PD III-3 :PD III-3  :

...... a- ............,.:g.......Q....:.RSGB

....................... p ..............

NAME :Bb il :CBuracked :LBush :RE son :P p ukzer :TQuay DATE$8/W87 $8////87 $8/ /87 $8/ 87 $8gt)/87 $8/u/87 $

OFFICIAL RECORD COPY 8708260010 e70821 PDR ADOCK 05000305 p PDR l

1

I Mr. D. C. Hintz Wisconsin Public Service Corporation Kewaunee Nuclear Power Plant 1 cc:

David Baker, Esquire Foley and Lardner -

)

P. O. Box 2193 Orlando, Florida 32082 )

l Stanley Lacrosse, Chairman Town of Carlton s Route 1 l Kewaunee, Wisconsin 54216 j Mr. Harold Reckelberg, Chaiman Kewaunee County Board l j

Kewaunee County Courthouse Kewaunee, Wisconsin 54216 l

8 Chairman l Public Service Comission of Wisconsin i Hill Farms State Office Building l Madison, Wisconsin 53702 j Attorney General l) 114 East, State Capitol Madison, Wisconsin 53702 i

~

U.S. Nuclear Regulatory Comission I Resident Inspectors Office  !

Route #1, Box 999 l Kewaunee, Wisconsin 54216 l l

Regional Administrator - Region III l U.S. Nuclear Regulatory Comission )

799 Roosevelt Road i Glen Ellyn, Illinois 60137 Mr. Robert S. Cullen Chief Engineer Wisconsin Public Service Comission P.O. Box 7854 ,

l Madison, Wisconsin 53707 l i

l

)

)

l 4

l Docket No. 50-305 COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANE0US AMENDMENTS AND SEARCH REQUIREMENTS)

KEWAviEE NUCLFAR POWER PLANT -

Provide a commitment that the suspr.nsion of safeguards measures must be

, reported in accordance with the provisions of 10 CFR 73.71. Reference I

10 CFR 73.55(a). ,

State that vital area access controls will not be dropped for life threatening situations not involving public health and safety. Reference 10 CFR 50.54(x) l and (y) and Generic Letter 87-08 (Q&A #3).

Provide a commitment that the search requirements will be implemented within 60 days after Commission approval of the proposed revisions. Reference 10 CFR l

73.55(d)(1).

( Provide a commitmant that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force. Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).

Expand the commitment on page 5-5 to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations. Indicate how this prompt access l will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means). Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Revise the commitment on page 9-3 to periodically (annually) review physical security and contingency plans and procedures to evaluate their potential impact on plant and personnel safety. Referene 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65.

Provide a commitment that the CAS will be designated as a vital area in accordance with 10 CFR 73.55(e)(1) as amended. Reference 52 FR 12364.

Indicate what components of the secondary power supply system will be protected as vital. Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.

Reference 10 CFR 73.70(d).