Confirms 861209-10 Insp of Compliance W/Applicable Sections of 10CFR50,App R & Associated Fire Protection Features. Listed Documentation,Including Analyses Re Compliance W/App R or Generic Ltr 86-10 Should Be Available at Time of Insp
ML20214X276
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 12/03/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
References
GL-86-10, NUDOCS 8612110037
Download: ML20214X276 (3)


Text

.

a DEC 3 1986 Docket No. 50-305 Wisconsin Public Service Corporation ATTN: Mr. D. C. Hintz Manager Nuclear Power Post Office Box 19002 Green Bay, WI 54307-9002 Gentlemen:

SUBJECT:

INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R, APPLICABLE SECTIONS AND ASSOCIATED FIRE PROTECTION FEATURES - KEWAUNEE NUCLEAR POWER PLANT - DOCKET NO. 50-305 This letter is to confirm the dates of December 9-10, 1986, for an NRC visit to review your staff's approach to compliance of the Kewaunee Nuclear Power Plant with 10 CFR 50, Appendix R as requested by your letter of November 20, 1986.

This will be a team-type inspection composed of personnel from the NRC Region III office and our contractors (Brookhavei. aational Laboratory).

To assist the site team members during this site visit and the upcoming compliance inspection, we request that the following information be available for review at the site:

1. Piping and instrumentation (flow) diagrams for hot standby (shutdown) and cold shutdown systems, alternative or dedicated shutdown systems and the reactor coolant pump oil collection system.
2. Plant layout and equipment location drawings which identify the physical plant locations of hot standby (shutdown) and cold shutdown equipment.
3. Clearly marked-up electrical raceway drawings which identify the cable routing of power and control circuits for those plant systems necessary to achieve and maintain hot standby (shutdown). Drawings should also identify exactly where cable wrapping has been installed and the extent to which moble wrapping has been installed. Also, identify the equipment and cabling which is redundant or alternative to the cabling that has been wrapped.
4. Control electrical distribution diagrams, control schemes for shutdown components which are being controlled from the remote shutdown panel, and single line AC and DC power.

M G

kDO

' Wisconsin Public Service 2 DEC 3 1986 Corporation

5. Plant layout drawings which identify fire area delineation and fire protection equipment locations.
6. Marked-up plant layout drawings which identify the locations of emergency lighting units.
7. Associated circuit analysis including drawings of alternate shutdown panel, circuits and fuse coordination.
8. Plant Operating Procedures which describe nonnal hot and cold shutdown from inside the control room, emergency hot and cold shutdown from emergency control stations outside and independent of the control room, and shutdown operations which utilize alternative or dedicated shutdown capability and natural circulation.
9. Fire damage control and repair procedures for cold shutdown systems.
10. Safe Shutdown Anal Hazards AnalysisFHA). (ysisThe (SSA)

SSAor equivalent and FHA need documents and a current Fire to list safe shutdown equipment and cabling in each area.

Further, to assist in our site visit effort, please advise us in summary format at the time of this visit of any deviation (s)/ exemption (s) requested and granted or requested and pending related to the applicable sections of 10 CFR 50, Appendix R.

In addition to the information requested above, copies of any other analyses and/or evaluations which demonstrate compliance to the applicable sections of Appendix R, including any analysis written to satisfy Generic Letter 86-10, should be available on site for review during this site visit. Appropriate personnel, knowledgeable with respect to those plant systems required for safe shutdown and their capabilities, should be available at the site during this visit. Following the entrance meeting, we would appreciate a plant familiarization tour relative to areas containing safe shutdown equipment.

Your cooperation with us during this site visit will be appreciated. Should you have any questions concerning this letter, please contact J. M. Ulie at 312-790-5712.

Sincerely, J. J. Harrison, Chief Engineering Branch See Attached Distribution RIII I RIII W RII,/';

h lbi } xlWM R V14 UJ11e/jk D N e'Y"e i Ruffett H rison 12/03/86 12/b/86 12/3 /86 12/.5/86

e I i'

'i ,

.. Wisconsin Public Service 3 DEC 3 ass Corporation.

Distribution cc: C. R. Steinhardt, Plant i Manager DCS/RSB(RIDS) .

Licensing Fee Management Branch -

K. Sullivan, BNL T. Fresco, BNL Resident Inspector, RIII John J. Duffy, Chief Boiler Section

, Mary Lou Munts, ~ Chairperson Wisconsin Public Service Commission Collette Blum-Meister (SLO),