ML20209F751
| ML20209F751 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 01/26/1987 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hintz D WISCONSIN PUBLIC SERVICE CORP. |
| Shared Package | |
| ML20209F755 | List: |
| References | |
| NUDOCS 8702050189 | |
| Download: ML20209F751 (2) | |
See also: IR 05000305/1986009
Text
!
I-
-
- I
.
b!110
'
,/
<
p
"
,;
JAN 2 01987
Docket No. 50-305
Wisconsin Public Service
Corporation
ATTN: Mr. D. C. Hintz
Vice President
Nuclear Power
Post Office Box 19002
Green Bay, WI 54307-9002
Gentlemen:
This refers to the routine safety inspection conducted by Mr. R. L. Nelson
of this office during the period of October 16 through December 15, 1986,
of activities at Kewaunee Nuclear Power Plant authorized by NRC Operating
License No. DPR-43 and to the discussion of our findings with
Mr. C. R. Steinhardt at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
While no violations were identified as a result of this inspection, the
Inspection Report highlights two instances where operators were not timely in
identifying significant changes in plant conditions. While no direct safety
consequences resulted, this apparent lack of attention to detail is of concern
to us and warrants further actions on your part. Consequently, please advise
NRC Region III of the actions you have taken or will take to prevent further
instances of this type. After reviewing your response we will meet with you
to dircuss our concerns further.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room,
gg20$Do$
500
g5
G-
,
~C50/ 'I'
t
..
.
Wisconsin Public Service
2
JAN 2 01987
Corporation
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
ORIGINAL SIGNED BY E. G. GREI:NMAN
Charles E. Norelius, Director
Division of Reactor Projects
Enclosure:
Inspection Report
No. 50-305/86009(DRP)
cc w/ enclosure:
C. R. Steinhardt, Plant
Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Virgil Kanable, Chief
,
Boiler Section
Mary Lou Munts, Chairperson
Wisconsin Public Service
Commission
Collette Blum-Meister (SLO),
WI Div. of Emergency Government
RIII
RIII
RIII
g
l
etYe
() GOLO&hMD
'
a ter/Jp
Nor