ML20058A129
From kanterella
Jump to navigation
Jump to search
ML20058A129 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 11/16/1993 |
From: | Callan L Office of Nuclear Reactor Regulation |
To: | Schrock C WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
References | |
NUDOCS 9311300119 | |
Download: ML20058A129 (2) | |
Similar Documents at Kewaunee | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20211D7501999-08-23023 August 1999
[Table view]Some use of "" in your query was not closed by a matching "".Responds to NRC Re Violations Noted in OI Rept 3-98-043 & EA 99-183.Corrective Actions:Oversight of Training Program & Contractor Policies That Implement Parts of Security Program Have Been Increased by Addl Position ML20205M9421999-04-13013 April 1999 Forwards Emergency Response Data System Implementation Documents.Data Point Library Updates for Kewaunee (271), San Onofre (272) & Clinton (273) Encl.Also Encl Plant Attribute Library Update for Grand Gulf (274).Without Encls ML17230A3661999-03-18018 March 1999 Forwards Listed Nelia Insurance Policy Endorsements for Kewaunee Nuclear Power Plant,Per Requirements of 10CFR140.15 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20154F1481998-10-0202 October 1998 Forwards Insp Rept 50-305/98-15 on 980831-0904.No Violations Noted.Insp Exam of Activities Conducted Under License Re Physical Security & to Compliance with Commission Rules & Regulations & with Conditions of License ML20237E0881998-08-24024 August 1998 Clarifies Info Provided Re Containment Ventilation Sys & Use of Mixing Factor of 0.5,in Response to NRC Request Made During Telcon ML20237A2301998-08-0707 August 1998 Forwards Original & Three Copies of Rev 11 to Knpp Security Manual.Screening Criteria Form for Each Change W/Description & Criteria of Review Has Been Included as Attachment A. Reissued Security Manual Included in Attachment B.W/O Encls ML20236R9051998-07-21021 July 1998 Informs That Document Entitled, WCAP-14677,Rev 1 F* & Elevated F* Tube Alternate Repair Criteria for Tubes W/Degradation within Tubesheet Region of Kewaunee Sgs, Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20249B7471998-06-23023 June 1998 Forwards RAI Re 980601 Proposed Amend to Revise F* & Ef* Criteria for SG Tubes in Kewaunee Tss.Proposed Amend Would Revise Existing F* & Ef* Distances in TS 4.2.b to Reflect Changes to Primary to Secondary Differential Pressure ML20249A8751998-06-16016 June 1998 Forwards Request for Addl Info Re Proposed Amend to Redefine Parent Tube Pressure Boundary for Westinghouse Mechanical Hybrid Expansion Joint SG Tube Sleeves,Submitted by Util ML20248M2521998-06-0909 June 1998 Forwards Assessment of Kewannee Cycle 22 Alternate Repair Criteria 90 Day Rept,For Info ML20217F3401998-04-23023 April 1998 Forwards Annual Environ Monitoring Rept Jan-Dec 1997, Per TS 6.9.b.1.Results of 1997 Land Use Census,Iaw Plant ODCM, Section 3/4.7.1,included in Rept ML20216B3281998-04-0707 April 1998 Discusses Amend 132 to License DPR-43.Requested Revised Analysis Reflecting Higher Source Term Encl.Results of Analysis Conclude That Potential Thyroid Doses to Public Continue to Be Less than Guideline Values of 10CFR100 ML20217J2131998-04-0202 April 1998 Forwards Copy of Each Revised Forms 398,personal Qualifications Statement & 396,certification of Medical Exam by Facility Licensee.Due to Error on Instructions for Form 398,addendum for Completing Form Are Provided ML20217H4031998-03-27027 March 1998 Informs That NRC Staff Has Initiated Variety of Activities Re Mgt of Licensing Basis Info as Result of Problems Encountered at Millstone & Maine Yankee Facilities ML20217G1461998-03-25025 March 1998 Responds to NRC Re Violations Noted in Insp Rept 50-305/98-03 on 980128-0203.Corrective Actions:Controlling & Properly Securing SGI ML20203C8481997-12-10010 December 1997 Forwards Emergency Response Data Sys Implementation Documents for Plants.W/O Encl ML20212H0121997-11-0404 November 1997 Forwards Insp Rept 50-305/97-14 on 970915-19.No Violations Noted.Rept Identifies Areas Examined within Security Program ML20217P3511997-08-26026 August 1997 Ack Receipt of & Check for $50,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insp ML20217J9641997-08-11011 August 1997 Responds to NRC Re Violations Noted in Insp Rept 50-305/97-02 on 970106-31.Corrective Actions:Will Revise IST Procedures to Use More Accurate Instrumentation Satisfying Requirements & to Include Acceptance Criteria ML20140E8861997-06-0707 June 1997 Forwards Amend 133 to License DPR-43 & Safety Evaluation. Amend Establishes New Design Basic Flow Rate for AFW Pumps Consistent W/Assumptions Used in Reanalysis of Limiting Design Basis Event for AFW Sys ML20140F2171997-04-30030 April 1997 Final Response to FOIA Requests for Documents.Records in App B Encl & Will Be Available in PDR IA-97-130, Final Response to FOIA Requests for Documents.Records in App B Encl & Will Be Available in PDR1997-04-30030 April 1997 Final Response to FOIA Requests for Documents.Records in App B Encl & Will Be Available in PDR ML20140F2211997-04-0404 April 1997 FOIA Request for Documents Re Recently Issued TIA for Plant Concerning Safety Question on Auxiliary Feedwater Sys ML20137A2111997-03-14014 March 1997 Transmits Info Pertaining to NRC Staff Review of Weld Defects in CE Designed SG Tube Sleeves ML20134Q0981997-02-21021 February 1997 Ninth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App P.App Q Documents Partially Withheld (Ref FOIA Exemption 6).Documents Also Available in PDR ML20134Q1251997-02-20020 February 1997 Forwards Original & Three Copies of Rev 10 to Knpp Security Manual.Manual Is Being Changed to Incorporate Use of Vehicle Barrier Sys,Per 10CFR73.55 & 73.1(a).Encl Withheld ML20133E7031997-01-0606 January 1997 Forwards Insp Rept 50-305/96-12 on 961118-27 & Notice of Violation ML20133G2291997-01-0606 January 1997 Ltr Contract:Task Order 115, Kewaunee Safety Sys Operational Performance Insp, Under Contract NRC-03-93-026 ML20129K1131996-11-0505 November 1996 Forwards Copy of Master Bwr/Pwr Gfes Exam W/Answer Key for Info.W/O Encl ML20129J2641996-10-29029 October 1996 Ack Receipt of 960613 & 1024 10CFR50.54(a) Submittals Re Changes to Quality Assurance Program Description.Based on Review,Nrc Concludes That Revision Continues to Meet Requirements of 10CFR50,App B & Acceptable ML18065B0081996-10-14014 October 1996 Informs That Overheads Will Be Presented by Licensee at 961016 Meeting at NRC Headquarters in White Flint.Encl Withheld ML20117P6861996-09-20020 September 1996 Forwards Rev 9 to Security Manual.Encl Withheld ML20117L7171996-09-0505 September 1996 Forwards Proposed Tech Specs Re Amend for Use of Westinghouse Laser Welded Steam Generator Tube Sleeves,Per Discussion W/Nrc ML20100M7451996-02-29029 February 1996 Provides Revised Description of Proposed Vehicle Control Measures.Encl Withheld ML20217H4281996-01-24024 January 1996 Discusses Review of Nuclear Energy Inst Guidance Document, Guideline for Managing NRC Commitments, Rev 2,dtd 951219 ML20094H8491995-11-0606 November 1995 Forwards Rev 8 to Security Manual.Rev Withheld ML20091P4951995-08-28028 August 1995 Forwards Clarification of Rev 7 to Security Manual.Encl Withheld ML20094D9291995-08-10010 August 1995 Forwards Scenario Package for 951011 Emergency Exercise at Plant,Per from Cj Paperiello ML20087K2451995-08-0202 August 1995 Forwards Revised Description of Proposed Vehicle Control Measures.Primary Change in Design Is Use of Jersey Barriers in Lieu of Combination Cable & Rock Design.Encl Withheld ML20084L1091995-05-30030 May 1995 Forwards Rev 7 of Kewaunee NPP Security Manual.Encl Withheld ML20080N0061995-02-28028 February 1995 Forwards Summary Description of Plant Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld ML20078R3291994-12-19019 December 1994 Discusses Results & Conclusions of Osre Conducted During 940815-18.Weakness Noted as Being Unique & Only Possible During Specific Time Periods ML20072J3401994-08-22022 August 1994 Responds to NRC Re Violations Noted in Insp Rept 50-305/94-09 on 940516-0704.Corrective Actions:Memo,Stating That Turbine Driven AFW Pump Should Be Declared Inoperable Whenever AFW-10A or 10B Closed or Inoperable,Issued ML20070P5811994-03-29029 March 1994 Requests Meeting W/Nrc & Appropriate Members of NRC Dept Re Disposal of high-level Radwaste from NPP ML20059E9511994-01-0707 January 1994 Requests Addl Info Re Graded Approach for GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance ML20058E6581993-12-0101 December 1993 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 940209.Informs That Facility Must Submit Ltr Identifying Individuals Who Will Take Exam ML20058A1291993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld ML20059D2761993-10-26026 October 1993 Forwards Copy of Master Bwr/Pwr Gfes Exam W/Answer Key.W/O Encl 1999-08-23 Category:OUTGOING CORRESPONDENCE Some use of "" in your query was not closed by a matching "". [Table view]Some use of "" in your query was not closed by a matching "". |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20058A129&oldid=3628242"