IR 05000482/1998005

From kanterella
Revision as of 16:19, 12 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of 990326 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-482/98-05 & of Need for Larger Scope of Review for Planned C/As for Violation 50-482/98-05,which Requires Extending Completion Time
ML20205K445
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/03/1999
From: Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
References
50-482-98-05, 50-482-98-5, EA-98-356, NUDOCS 9904130211
Download: ML20205K445 (4)


Text

.

A

'2

/ UNITED STATES 8 NUCLEAR REGULATORY COMMISSION

- *

i REGloN IV

%,

% v5

./ 611 RYAN PLAZA DRIVE, SUITE 400 ARUNGTON, TEXAS 760114064 April 3,1999 EA 98-356 Otto L Maynard, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Busiington, Kansas 66839 SUBJECT: NRC INSPECTION REPORT 50-482/98-05

Dear Mr. Maynard:

Thank you for your letter of March 26,1999, that provided an update on the status of your committed corrective actions to address our concerns identified during the Maintenance Rule baseline team inspection, which was conducted last year at Wolf Creek. You also informed us that you identified the necessity for a larger scope of review for the planned corrective actions br Violation 50-482/0805-05 and this requires extending the completion time to June 30,1999. This extension appears reasonable to us. We appreciate your efforts to j keep us informed and Eire pleased by the apparent ongoing improvement to your Maintenance i

' Rule program. Again, we will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincerely, M

Dr. Dale A. Powers, Chief Engineering and Maintenanco Branch l l

Civision of Reactor Safety 1 Docket No.: 50-482 i License No.: NPF-42 j

i 9904130211 990403 PDR ADOCK 05000482 1 G PDR l l

i

. .

.s .

L ,

Wolf Creek Nuclear Operating Corporation ' .-2-

-- cc:

Chief Operating Officer Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, Kansas 66839

- Jay Silberg, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, D.C. 20037

' Supervisor Licensing Wolf Creek Nuclear Operating Corp.

. P.O. Box 411

~

Budington, Kansas 66839

'

' Chief Engineer Utilities Division Kansas Corporation Commission

-'

500 SW Arrowhead Rd.

Topeka, Kansas 66604-4027 Office of the Govemor.

State of Kansas x Topeka, Kansas 66612 Attorney General Judicial Center 301 S.W.10th 1 2nd Floor I Topeka; Kansas 66612-1597 I

- County Clerk .

.

Coffey County Courthouse Budington, Kansas 66839-1798 l

Vick L' Cooper, Chief Radiation Control Program Kansas Department of Health and Environment -

Bureau of Air and Radiation Forbes Field Building 283 l

[ Topeka, Kansas 66620;

.-

f i

s

-

. ;e ,

'

i -

Wolf Creek Nuclear Operating Corporation -3 '

- Mr. Frank Moussa

. Division of Emergency Preparedness

- 2800 SW Topeka Blvd-Topeka, Kansas .66611-1287

,

>

l i

'

I '

-

.

j

n. .,

. . .

1 ,

Wolf Creek' Nuclear Operating Corporation -4- '!

bec to DCD (IE01)

l

~ bec distrib. by RIV: -

,

l l. ' Regional Administrator Resident inspector

DRP Director SRI (Callaway, RIV)

'l DRS Director Bianch Chief (DRP/B)

DRS-PSB Project Engineer (DRP/B)

MIS System Branch Chief (DRP/TSS)

- RIV File f9-(,-0064 1.

.

!

!- {

i I

t l

t

\

i l

DOCUMENT NAME: R:\_WC\WC805AK2. JEW  !

To recohre copy of doce mes . Indicate in box: "C" = Cope wnhout enclosures *E" = Copywth enclosures "N" = No copy RIV:EMB C:DRS/EMB ' G- ,

'

JEWhittemore:Imb* DAPowers off 04/02/99 04/5/99"

  • Previously concurred OFFICIAL RECORD COPY j. .QOO ~

4 j