ML20198Q182

From kanterella
Revision as of 14:35, 20 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 0 to 1-OM.3-11, Cold Weather Preparation & Operation
ML20198Q182
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/03/1997
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20198Q164 List:
References
1-OM-3.11, NUDOCS 9711120132
Download: ML20198Q182 (4)


Text

_ _ _ -

1-OM-3.11. Rev. 0 Page 1 of 7 O

Millstone Unit One OPERATIONS MANUAL SECTION 3.11

" Cold Weather Preparation and Operation" Sponsor: E.E. Berry // /Y 97 Effective Date TABLE OF CONTENTS PAGE NUMBER 1.0 PURPOSE 2 2.0 INSTRUCTIONS 2 ATTACHMENT 1 STEAM HEATING UNITS 4 ATTACHMENT 2 HEAT TRACING / TANK STRIP HEATERS 5 ATTACHMENT 3 ELECTRIC HEATING UNITS 7 Approved By:

nN e (N' / h

'MP1 Operations Manager fok" Noo$k E N 45

,p P PDR

. . . 1 oM-3.11, Rw. 0

, Pag)2 of 7 1.0 PURPOSE

1. Prepare plant for cold weather. This includes assuring the steam and electric heating units are ready for operation and that heat tracing is in service.

2.0 INSTRUCTIONS A. Operations Manager, prior to August 1, ASSIGN this procedure to an OPS management representative or Unit Supervisor for completion by 30 September.

Management representative I B. VERIFY, with the Unit Coordinator, the following subsystems are scheduled for verification of availability prior to 30 September:

Steam Heating Units (Refer To Attachment 1) e Heat Tracing System and Strip Heaters (Refer To Attachment 2)

Electric Heat Units (Refer To Attachment 3)

, n '

d C. VERIFY HVS-6 Glycol Replacement PM (Serial # 9498) is scheduled to be performed prior to October 15*.

Date Scheduled .

D. Refer To OP-331, " Plant Heating and Condensate Recovery" and PERFORM the following:

1.) VERIFY Prerequisites are complete 2.) START the Boiler Fuel Forwarding System 3.) To verify operability, SHIFT Boiler Fue: Forwarding Pumps 4.) START the Condensate Return System 5.) START one of the boilers, as directed by the SM/US, and warm up the Steam Heating System.

O

s

  • 1 oM-311, Rsv. O Paga 3 of 7 NOTE Walkdown Team should include personnel from the following disciplines:

Operations, Maintenance and Technical Support l

E. When the Steam Heating System is at normal operatin0 temperature and pressure, PERFORM the following:

. WALKDOWN the Auxiliary Steam and Condensate Recovery System and identify system deficiencies

. VERIFY Steam flow to outside tanks

. VERIFY Steam Flow to Nitrogen Addition Tank F. Refer To OP-331, " Plant Heatirg and Condensate Recovery" and START / SECURE the remaining boilers as necessary to ensure each boiler operates normally.

G. VERIFY the following:

Heat Tracing Systems and Strip Heaters are aligned per Attachment 2.

. Electric Heating Units are aligned per Attachment 3.

H. Refer To Attachments 1,2 & 3 and ENERGlZE the listed equipment.

NOTE Depending on the heater being installed and its location, various permits may be required.

They may include flame permits for the Sullair compressor enclosure and Confined Space Entry Permits for entry into the ESW/ECCS Cross-Tie Valve Pit.

1. VERIFY the following portable heaters are installed and tested:

. Portable 480 Volt Heater in the Sullair compressor en' .osure Portable 480 Volt Heater in the ESW/ECCS Cross-tie Valve Pit J. Ensure system def ciencies TR'd.

. . 1-oM-311, Rev. 0 Page 4 of 7

p ATTACHMENT 1 V

NOTE: Ensure walkdown includes, but is not limited to the following:

STEAM HEATING UNITS l UNIT DESCRIPTION POWER Ckt.

I SUPPLY No.

HVU-1 TURBINE DECK UP-1M 6 HVU-2 HVU-3 TURBINE DECK UP-1M 16 HVU4 HVU-5 HVU-6 TURBINE DECK UP-1M 5 HVU-7 HVU-8 TURBlNE DECK UP-1M 18 HVU-9 HVU-10 TURBINE DECK UP-1M 6 HVU-10A HVU-11 MAINTENANCE SHOP UP-1E 21 HVU-12 HVU-15 HVU-16 REFUEL FLOOR UP-1N 24 HVU-17 HVU-18 HVU-19 FIRE PUMP HOUSE UNIT HEATER DP-6 8 HVU-20 COND. PP HOUSE UNIT HEATER DP-5 8 HVU 22 U-2 FIRE PUMP HOUSE U2 PANEL 652 OUTFALL HEATING UNITS UP-1S 1 OUTFALL HEATING UNITS UP-1S E I

O l

1 l

a

1 OM 3.11, R$v. 0 Page 5 of 7 l

ATTACHMENT 2

~

HEAT TRA,1NG Panel Switch Switch Positior. (5) Notes l LP-6 Ckt 11 l

(Fuel ON Cw Turbine Forwarding)

Bldg. LP-6 Ckt 10 (Inside GT ON Bldg.)

1-6 ON 7 OFF Condensate e-16 ON Transfer 17,18 OFF Pump 19 ON House 20-22 ON (South) 23,24 OFF 25 OFF 26,27 ON 28 OFF c 1-4 ON (j Condensate 5 OFF Transfer 6-13 ON Pump 14 -18 OFF House 19 ON (Nodh) 20-14 OFF 25-28 OFF Waste Surge Tank Power Pack ON Heat Trace s

j

. o

e e .

1-OM.311, R:v. 0

, Page 6 of 7 ATTACHMENT 2 O

v HEAT TRACING Panel Switch Switch Position (5) Notes 1,2 ON 3 OFF 4,5 ON 6 OFF 7 ON 8 OFF 9 ON Fire Pump 10 OFF House 11 ON 12 OFF 13 OFF 14-15 ON 16-20 OFF 21 ON 22 OFF 23,24 ON 25-28 ON Turbine

'N Bldg. DP-20, ON Railway Ckt.12 Access Sprinkler System Heat UP-1V. ON Trace Ckt. 3 & 4

__ TANK STRIP HEATERS (DP-6, Ckt.11)

(5) Notes North Fire Tank Strip Heater ON South Fire Tank Strip Heater ON Domestic Water Tank Strip Heater ON Demin Water Tank Strip Heater ON U

1-OM-3.11 Riv. 0

, Page 7 of 7 ATTACHMENT 3 ELECTRIC HEATING UNITS UNIT # DEdCRIPTION MCC Cub. SWITCH No. LOCATION HVEU-1 INTAKE STRUCTURE CD-5 2A LOCAL HVEU-2 INTAKE STRUCTURE CD 5 3E LOCAL HVEU INTAKE STRUCTURE CD-5 5A LOCAL HVEU-4 INTAKE STRUCTURE CD-5 5B LOCAL HVEU-5 SODIUM HYPOCHLORITE ROOM CD-5 7D LOCAL HVEU-6 STACK SAMPLING ROOM DP-13 11 LOCAL HVEU-10 CALCIUM CHLORIDE TANK & PUMP ROOM WSB A2 LOCAL HVEU-11 CALCIUM CHLORIDE TANK & PUMP ROOM WSB A2 LOCAL HVEU-12 RECOMBINER BUILDING C-7 4A LOCAL HVEU-13 RECOMBINER BUILDING C-7 4F LOCAL HVEU-14 XE/KR BUILDING C-8 4F LOCAL GTG-DP, HVEU-15 GAS TURBINE BATTERY ROOM Ckt. 6 HVEU-16 HVEU-17 GEN GAS TURBINE GT-1 C3 HVEU-18 HVEU-24 CHEMISTRY LAB D-2 1C LOCAL HVEU-25 MAINTENANCE SHOP WELDING AREA DP-25 3 LOCAL HVEU-26 MAINTENANCE SHOP WELDING AREA DP-25 5 LOCAL f A '-27 'B' 125VDC BATTERY ROOM D-1 4C LOCAL Ff ._. -2 8 STRAINER PIT HEATER (EAST) CD-5 3B LOCAL HVEU-29 STRAINER PIT HEATER (WEST) CD-5 3B LOCAL HVEU-30 DIESEL FIRE PUMP BLOCK HEATER DP-6 1 XE-KR RADIATION MONITOR BUILDING DP-8 1&3 LOCAL Each Unit with LOCAL listed requires the breaker and Local Control Switch be ON.