ML20149D517

From kanterella
Revision as of 04:00, 27 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ro:On 880117,motor Driven Fire Pump Declared Inoperable.Pump Repaired & Returned to Operable Status on 880118.Telcon Notification Made on 880118 Per Tech Spec 3.14.2.3.b.1
ML20149D517
Person / Time
Site: Rancho Seco
Issue date: 01/18/1988
From: Firlit J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
AGM-NPP-88-047, AGM-NPP-88-47, NUDOCS 8802090525
Download: ML20149D517 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

= ,

$"SMUD y SACRAMENTO MUNICIPAL UTluTY DISTRICT C 6201 S Street, P.O. Box 15830, Sacramento CA 95352 183 , YpJgS2-3211 AN ELECTRIC SYSTEM SERVING THE HEAR LIFORNIA

'JAN i 81988 " 30 dd7 AGM/NPP 88-047 4 og2,-

U. S. Nuclear Regulatory Commission Attn: J. B. Martin, Regional Administrator Region V, Office of Inspection and Enforcement 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 FIRE PUMPS INOPERABILITY

Dear Mr. Martin:

This letter is submitted in accordance with the requirements of Technical Specifications 3.14.2.3.b.2.

On January 17, 1988, 1158 hours0.0134 days <br />0.322 hours <br />0.00191 weeks <br />4.40619e-4 months <br />, the motor driven fire pump, the only OPERABLE fire pump at the time, was declared INOPERABLE.

The pump was repaired and returned to OPERABLE status on January 18, 1988, at 1005 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.824025e-4 months <br />. Telephone notification as required by Technical Specification 3.14.2.3.b.1 was made at 1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> on January 18, 1988.

Please contact me if you have any questins. Members of your staff with questions requiring additional information or clarification may contact Steve Crunk extension 4913 or Dave Swank extension 4920.

Sincertsly, r

Joseph F.

/

Firlit .

Assistant General Manager .

Nuclear Power Production l 8802090525 880118 pN PDR ADOCK 05000312 0 S PDR l RANCHO SECO hUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 95638 9799;(209) 333 2935