ENERGY SERVICES GROUP E22f.T4 June 15. 1989 Director, Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Ccamicsion Washington, D.C.
20555 l
Report #150 i
Dear Sir:
f In accordance with the requirements of Title 10, Chapter 10, Code of Federal Regulations, Part 21, Cooper Industries, Enterprise i
^
Engine Servicee hereby notifies the Commiceion of a potential defect in a component of a DSB Standby Diesel Generator.
There could exist a problem with the accessory drive assembly.
Cooper Industries has supplied this component with the potential problem to the following nuclear sitec:
Utility Site Serial Eq.
Model i
Long Island Lighting Shoreham 74010-12 DSR-48 Gulf Statee Utilities River Bend 74039-40 DSR-48 S.M.U.D.
Rancho Seco 81015/16 DSR-48 j
i At Gulf States Utilities, River Bend Station, the two (2)
I bushings in the accessory drive assembly were found to be seized t3 the shaft and rotating in the housing.
This condition was obeerved by Cooper Industries personnel in the course of performing outage maintenance on the standby diesel generators.
The root cause of failure has been determined to be a combination of insufficient lubrication to the bushinge with a stackup of j
machined tolerances all toward one end on the assembly l
componente.
Lubrication of the bushingc is via a 1/4 inch tube from the oil distribution manifold in the gearcace.
Eight (8) other lubricating tubes also originate in thic manifold including one for the gear mesh in thic assembly.
Lubrication for the gear mech is through a 1/32 inch orifice spray jet; an oversize orifice here may cause a reduction of oil flow to the buchings.
The combination of tight tolerances and reduced oil flow could cause overheating of the bushinge and ultimately bushing failure.
ENitHPRISE' ENGINE SERVICES 85th Avenue and Fnterpose Way P O Box 2161 Oakland. CA 94621-0061
'l (415) 577 74TI NAX*
COOPER. BESSEMER
- E NTERPR:SE' ENTRONIC* CONTROLS NORDBERG4 PENN* SUPERI R*
8906260002 890615 PDR ADOCK 05000312 S
}
Page 2 June 15, 1989 U.S.
Nuclear Regulatory Commission While the assembly was found to still be operational at the time.
i of discovery (the bushings were rotating in the housing), a l
catastrophic failure of the accessory drive assembly could result in fragmented pieces falling into the gear train affecting engine availability.
The accessory drive assembly is designed and manufactured b/
Cooper Industries, Enterprise Engine Services, located in Oakland, California.
Affected assembly part numbers include 1A-3541 and 1A-6877.
Cooper Industries recommends the following cource of action at the next scheduled engine maintenance.
i 1) a visual inspection (including barring the engine over) l to detect spinning bushings, j
l l
2) an inspection of the orifice spray jet to be sure it is l
not oversized, and J
3) continued surveillance according to the DR/QR suggeeted l
maintenance schedule.
Since action is required by others, we cannot estimate when corrective action will be complete.
A copy of this letter will be forwarded to all of the affected sites refelenced in paragraph 2 of this letter as indicated by the carbon copy list.
Our evaluation of this matter was concluded on June 13, 1989.
Ver
-ruly Yours, b';A Bruce
.NGuntrum Manag JQuality Assurance BCG/mu ENERGY SERVICES GROUP
.w.;
L
l p
l Il il Page 3 lt June 15, 1989 1
U.S.
Nuclear Regulatory Coramision cc: Long Island Lighting Company Shoreham Nuclear Power Station i
North Country Road I
Wading River, New York 11791
)
Attention: Mrg. Nuclear Operations Support Department
!li Gulf States Utilities Company l
P.O.
Box 220 l
St.
Francisville, LA 70775 1
Attention: Director, Nuclear Licensing Sacramento Municipal Utility District I!
14440 Twin Cities Road l
Herald, CA 95638 l,
1 Attention: Mr. D.R.
Ferguson i
Nuclear Engineering Dept., M.S.
208-6 Ii i
Judy R. Beal l
l Purchasing Department, M.S.
50 c
li i
l l1 l
l l
l 8
ENERGY SERVICES GROUP wu