ML20211H792 | 13 August 1999 | Safety Evaluation Supporting Amend 126 to License DPR-54 | |
ML20195D190 | 6 May 1999 | Annual Rept | Temporary Modification Decommissioning Funding Plan Process Control Program Spent Fuel Pool Instrumentation Biofouling |
ML20195H857 | 31 December 1998 | 1998 Annual Rept for Smud. with | |
ML20155D480 | 27 October 1998 | Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode | Boric Acid High Radiation Area Grab sample Hydrostatic Emergency Lighting Design basis earthquake Process Control Program Earthquake Control of Heavy Loads Chernobyl Fuel cladding Scaffolding |
ML20248C430 | 6 May 1998 | Annual Rept, Covering Period 970507-980506 | Temporary Modification Decommissioning Funding Plan Scaffolding |
ML20249A783 | 31 December 1997 | 1997 Smud Annual Rept | |
ML20198G827 | 22 August 1997 | Safety Evaluation Supporting Amend 125 to License DPR-54 | High Radiation Area Annual Radioactive Effluent Release Report |
ML20217D327 | 30 July 1997 | Update of 1995 Decommissioning Evaluation for Rancho Seco Nuclear Generating Station | Scaffolding |
ML20140A637 | 6 May 1997 | Annual Rept, Covering Period 960507-970506 | Decommissioning Funding Plan |
ML20140G448 | 1 May 1997 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages | |
ML20137W815 | 20 March 1997 | Amend 1 to Post Shutdown Decommissioning Activities Rept | Earthquake Fire Protection Program |
ML20141J271 | 31 December 1996 | Smud 1996 Annual Rept | |
ML20138L123 | 13 November 1996 | Smud Rancho Seco Incremental Decommissioning Action Plan, Rev 0,961113 | Coatings Process Control Program |
ML20129E715 | 14 October 1996 | Defueled SAR for Rancho Seco | Ultimate heat sink Grab sample Fire Barrier Anticipated operational occurrence Decommissioning Funding Plan Annual Radioactive Effluent Release Report Design basis earthquake Process Control Program Earthquake Fire Protection Program |
ML20059H682 | 17 January 1994 | Revised Rancho Seco Quality Manual | |
ML20058K384 | 9 December 1993 | Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head | |
ML20056E517 | 31 August 1993 | Technical Review Rept, Tardy Licensee Actions | |
ML20059K198 | 6 May 1993 | Annual Rept, Covering Period from 920501- 930506,consisting of Shutdown Statistics,Narrative Summary of Shutdown Experience & Tabulations of Facility Changes, Tests & Experiments,Per 10CFR50.59(b) | |
ML20128C964 | 2 February 1993 | Informs Commission of Status of Open Issues & Progress of Specified Facilities Toward Decommissioning | Exemption Request Fire Protection Program |
ML20127H230 | 15 January 1993 | Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites | |
ML20126B042 | 17 December 1992 | Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed | Loctite |
ML20125C716 | 7 December 1992 | Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl | Stroke time Anchor Darling |
ML20127P586 | 23 November 1992 | Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl | |
ML20126E677 | 3 August 1992 | Rev 7 to Rancho Seco Quality Manual | Coatings Nondestructive Examination |
NL-90-451, Monthly Operating Rept for Oct 1990 for Rancho Seco Nuclear Generating Station | 31 October 1990 | Monthly Operating Rept for Oct 1990 for Rancho Seco Nuclear Generating Station | |
ML17348B506 | 9 October 1990 | Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards | |
ML20059G962 | 10 September 1990 | Safety Evaluation Supporting Amend 115 to License DPR-54 | |
NL-90-443, Monthly Operating Rept for Aug 1990 for Rancho Seco | 31 August 1990 | Monthly Operating Rept for Aug 1990 for Rancho Seco | |
ML20217A571 | 28 August 1990 | Final Engineering Rept,Assessment of Spent Fuel Pool Liner Leakage | Boric Acid High winds Loop seal Grab sample Hydrostatic Coatings Nondestructive Examination Design basis earthquake Earthquake |
NL-90-439, Monthly Operating Rept for Jul 1990 for Rancho Seco Nuclear Generating Station | 31 July 1990 | Monthly Operating Rept for Jul 1990 for Rancho Seco Nuclear Generating Station | |
ML20055F859 | 16 July 1990 | Special Rept 90-11:on 900613,06,25,18,21 & 28,fire Barriers Breached More than 7 Days & Not Made Operable in 14 Days. Corrective Actions:Operability of Fire Detectors Verified on One Side of Breached Barriers | Fire Barrier |
NL-90-423, Monthly Operating Rept for June 1990 for Rancho Seco Nuclear Generating Station | 30 June 1990 | Monthly Operating Rept for June 1990 for Rancho Seco Nuclear Generating Station | |
ML20055C629 | 21 May 1990 | Special Rept 90-08:on 900419,fire Pump Batteries Inoperable When Surveillance Procedure SP.206 Not Performed by Due Date.Caused by Test Frequency Incorrectly Changed from Weekly to Monthly.Surveillance Schedule Revised | |
ML20055C630 | 21 May 1990 | Special Rept 90-09:on 900424,25,30,31 & 0502,fire Barriers Inoperable for More than 7 Days,Per Tech Spec 3.14.6.2 Requirement.Hourly Fire Watches Established & Penetrations & Doors Returned to Operable Status | Fire Barrier |
ML20058B652 | 4 May 1990 | Rev 0 to ERPT-M0216, Property Loss Study for Rancho Seco Nuclear Generating Station in Long Term Defueled Mode | |
ML20248E012 | 13 September 1989 | Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating | |
NL-89-634, Monthly Operating Rept for Aug 1989 for Rancho Seco Nuclear Generating Station | 31 August 1989 | Monthly Operating Rept for Aug 1989 for Rancho Seco Nuclear Generating Station | |
NL-89-598, Monthly Operating Rept for Jul 1989 for Rancho Seco Nuclear Generating Station | 31 July 1989 | Monthly Operating Rept for Jul 1989 for Rancho Seco Nuclear Generating Station | |
ML20247B361 | 17 July 1989 | Safety Evaluation Supporting Amend 112 to License DPR-54 | Fuel cladding |
NL-89-556, Monthly Operating Rept for June 1989 for Rancho Seco Nuclear Station | 30 June 1989 | Monthly Operating Rept for June 1989 for Rancho Seco Nuclear Station | |
ML20245E116 | 20 June 1989 | Safety Evaluation Supporting Amend 111 to License DPR-54 | Safe Shutdown Exemption Request |
ML20245B665 | 15 June 1989 | Part 21 Rept 150 Re Potential Defect in Component of Dsr Standby Diesel Generator.Cause of Failure Determined to Be Combination of Insufficient Lubrication to Bushings.Listed Course of Action Recommended at Next Scheduled Engine Maint | |
ML20245A199 | 9 June 1989 | Safety Evaluation Supporting Amend 110 to License DPR-54 | |
ML20248B936 | 5 June 1989 | Safety Evaluation Supporting Amend 107 to License DPR-54 | Fire Barrier |
ML20248B632 | 5 June 1989 | Safety Evaluation Supporting Amend 108 to License DPR-54 | |
ML20248B962 | 5 June 1989 | Safety Evaluation Supporting Amend 109 to License DPR-54 | |
NL-89-517, Monthly Operating Rept for May 1989 for Rancho Seco Nuclear Generating Station | 31 May 1989 | Monthly Operating Rept for May 1989 for Rancho Seco Nuclear Generating Station | Temporary Modification |
ML20247P176 | 30 May 1989 | Safety Evaluation Accepting Generic Ltr 83-28,Item 4.5.2 Re on-line Testing of Reactor Trip Sys | |
ML20247N749 | 30 May 1989 | Special Rept 89-13:on 890328-29,specific Activity of Primary Sys Exceeded Limits in Administrative Procedure & Chemistry Control Commitment.Possibly Caused by Power Reduction.Isotopic Analysis Continued | |
ML20247K726 | 23 May 1989 | Safety Evaluation Supporting Amend 105 to License DPR-54 |