Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEAR3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20211D6491999-08-25025 August 1999 Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20247G6131998-05-13013 May 1998 Part 21 Rept Re Defect Contained in Automatic Switch Co, Solenoid Valves,Purchased Under Purchase Order (Po) 970161. Caused by Presence of Brass Strands.Replaced Defective Valves ML20217A1531998-04-16016 April 1998 Closure to Interim Part 21 Rept Submitted to NRC on 970929. New Date Established for Completion of Level I & 2 Setpoint Project Committed to in .Final Approval of Setpoint Calculations Will Be Completed by 980531 ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H7911997-09-30030 September 1997 Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected ML17309A6211997-09-29029 September 1997 Part 21 Rept Re Final Disposition of Masterflow 713 & Embeco 636 Grout Nonconformance Reported by Master Builders,Inc. Licensee Continuing to Monitor shelf-life of Masterflow 713 & Embeco 636 Grouts Produced at Rancho Cucamonga ML20217D4141997-09-29029 September 1997 Interim Part 21 Rept Re Errors Noted During Preparation of ITS Surveillance Test Procedures Using GE Calculated Setpoints.Setpoint Calculations Will Be Reviewed,Corrected & Approved to Establish Significance of Errors ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML20140G4481997-05-0101 May 1997 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby Diesel Generator Sys.Recommends That Springs Be Inspected on Periodic Basis,Such as During Refueling Outages ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20134B2301997-01-24024 January 1997 Final Part 21 Rept Re Potential Safety Concern on Matl Used for Fabrication of Permanent Canal Seal Plate.Correpondence W/Fabricator & Matl Supplier Documents Tig Automated Welding Process Used to Fabricate Angle Pieces ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause ML20101N8441996-04-0505 April 1996 Interim Part 21 Rept Re Potential Safety Concern on Matl for Fabrication of Permanent Canal Seal Plate.Licensee Will Provide Final Rept to NRC in Approx Six Months Upon Completion of Evaluation of Welds 3F0295-15, Part 21 Rept Re GE Supplied Constant Voltage Transformers (Cvt).Vendot Supplied FPC W/Instructions on Mod of Cvts Located in Installed VBIT-1D,to Return Output Voltage to Required Values & FPC Modified Cvts1995-02-27027 February 1995 Part 21 Rept Re GE Supplied Constant Voltage Transformers (Cvt).Vendot Supplied FPC W/Instructions on Mod of Cvts Located in Installed VBIT-1D,to Return Output Voltage to Required Values & FPC Modified Cvts ML20080G3271995-01-30030 January 1995 Part 21 Rept Re Furnished Commercial grade/non-safety Related Studs,Nuts & Washers for Use on safety-related Crystal River 5th Yr post-tension Surveillance Program ML20078F5841995-01-27027 January 1995 Part 21 Rept Re Vendor Using Incorrect Acceptance Criteria on Qualification Test Rept & Acceptance Criteria Used Not Not Met by Cvts.Vendor Continues to Seek Resolution of Matter ML20076M8321994-10-28028 October 1994 Submits Followup to 940516 Part 21 Rept Informing of Investigation to Determine Data Supplied in mid-80 Used by Nuclear Utilities to Set Torque Switches in MOV ML18038A8971994-09-0707 September 1994 Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures ML20072A7691994-08-0808 August 1994 Interim Part 21 Rept 2 Re Weak Link Analysis for Movs.No Evidence to Support Fact of Erroneous Data Discovered. Investigation Continuing ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML20059F2631994-01-0707 January 1994 Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical ML20058K3841993-12-0909 December 1993 Part 21 Rept Re Potential Defect in Component of Dsrv & Dsr Enterprise Standby DG Sys,Regarding Potential Problem W/ Subcover Assembled Atop Power Head ML20044G5311993-05-26026 May 1993 Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 ML18096B2421993-02-0101 February 1993 Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl ML20127H2301993-01-15015 January 1993 Part 21 Rept Re Potential Defeat in Component of Dsrv & Dsr Enterprise Standby DG Sys.Starting Air Distributor Housing Assemblies Installed as Replacement Parts at Listed Sites ML20126B0421992-12-17017 December 1992 Final Part 21 Rept Re Potential Problem W/Steel Cylinder Heads.Initially Reported on 921125.Caused by Inadequate Cast Wall Thickness at 3/4-inch-10 Bolt Hole.Stud at Location Indicated on Encl Sketch Should Be Removed ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20118B2191992-09-23023 September 1992 Suppl to Part 21 Rept Re Potential Deviation in Some Bailey Controls Co 88 Series Modules,Transmitted Via .One Module Found Incapable of Reaching 100% Output at Max Rated Load.Recommends That Circuit Board Assemblies Be Inspected ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20101M8921992-06-30030 June 1992 Initial Part 21 Rept Re non-segregated Phase Electrical Bus Duct Mfg in 1972.Initially Reported on 920427.Detailed Calculations Being Done by FPC to Evaluate Momentary Fault Current Against Supplied Ratings of All Bus Sections ML20094J4681992-03-0202 March 1992 Part 21 Rept Re Amot Valve (Amot Part 1476B0212A3).Valve Originally Supplied as Part Number 2-05V-153-004 in Overspeed Shutdown Assembly KSV-72-7.Production of Valve Discontinued & Advises That Alternate Assemble Available ML20094F5211992-02-18018 February 1992 Part 21 Rept Re Defect in Amot Control Corp Safety Trip Valves for Use in Edgs.Defective Overspeed Trip Valve Removed from DG 1.Replacement & Existing Amot Overspeed Trip Valve on DG 2 Inspected & Determined Not to Contain Defect ML20079L4911991-10-29029 October 1991 Part 21 & Deficiency Rept 158 Re Potential Defect in Component of DSRV-16-4 Standby Diesel Generator Sys. Drawing Rev to Increase Gear Tooth Hardness Completed. Recommended Corrective Actions for Sites Listed ML20028H3531990-12-13013 December 1990 Part 21 Rept Re Cable Assemblies Failing to Meet IEEE-383 Section 3 Flammability Tests.Results of Tests Conducted on 901206 Encl.Corrective Actions Include Applying Flame Retardant Covering to Cable or Cable Replacement ML17262A2621990-11-30030 November 1990 Part 21 Rept Re Chilled Water Sys.Initially Reported on 901030.Evaluation of Perry Plant Will Be Sent by 901230 ML17348B5061990-10-0909 October 1990 Part 21 Rept Re Zener Diode VR2 on Power Supply Board 9 1682 00 106 Possibly Being Installed Backwards ML20012C1051990-03-0707 March 1990 Part 21 Rept Re Several Failures of Fairbanks Morse Engine Div Piston Pins/Bushings on Upper Pistons.Caused by Incorrect Surface Pattern on Piston Pins.Piston Pins Under Listed Purchase Orders to Be Removed & Replaced ML20012A9011990-02-27027 February 1990 Suppls 900213 10CFR21 Rept Re Chilled Water Sys Operation. Evaluation of Crystal River Determined That Postulated High Energy Line Break in Intermediate Bldg May Be Subj to Steam Loads Higher than Normal Loads,Causing Rising Water Temp ML20005G4391990-01-10010 January 1990 Provides Addl Info on Part 21 Rept Re Defect in Six Instrument Cracks.Licensee Will Not Assume Liability for Defects After Expiration of Warranty ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML19324C1131989-11-0202 November 1989 Part 21 Rept Re Defects in Instrument Racks for Use in Hatch,Inc Supplied Emergency Diesel Generator Starting Air & Lube Oil Sys.Verification of All Tube Fittings in Instrument Rack Completed & All Discrepant Fittings Corrected ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20245B6651989-06-15015 June 1989 Part 21 Rept 150 Re Potential Defect in Component of Dsr Standby Diesel Generator.Cause of Failure Determined to Be Combination of Insufficient Lubrication to Bushings.Listed Course of Action Recommended at Next Scheduled Engine Maint ML20205F3211988-10-10010 October 1988 Part 21 Rept Re Potential Deviation from Tech Spec Concerning Ry Indicators Due to Operating Temp Effect on Analog Meter Movement.Initially Reported on 881006.Customers Verbally Notified on 881006-07 ML20207P0151988-10-0404 October 1988 Part 21 Rept Re Fuel Nozzle Tips in Standby Diesel Generator KSV-20-T W/Cracks Permitting Diesel Fuel to Be Sprayed Into Cylinders.Heavy Vapors Observed Emitting from Breathers on Some Cylinder Heads 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G0191999-10-15015 October 1999 Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) ML20217G7461999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20212E9031999-09-30030 September 1999 FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With ML20212K9781999-09-30030 September 1999 Safety Evaluation Accepting USI A-46 Implementation Program ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20211L1321999-08-31031 August 1999 EAL Basis Document ML20212C1501999-08-31031 August 1999 Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20212C5001999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station ML20211D6491999-08-25025 August 1999 Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy ML20211B7291999-08-16016 August 1999 Rev 2 to Cycle 11 Colr ML20211H7921999-08-13013 August 1999 Safety Evaluation Supporting Amend 126 to License DPR-54 ML20210P1111999-08-0505 August 1999 SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 ML20209F5601999-07-31031 July 1999 EAL Basis Document, for Jul 1999 ML20210R0381999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Cooper Nuclear Station ML20210J2921999-07-29029 July 1999 Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance ML20209H8281999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20211A9981999-07-12012 July 1999 Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20209E1061999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Cns.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20196B3851999-06-17017 June 1999 Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also Encl ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20195K2851999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With ML20195C6271999-05-28028 May 1999 Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates ML20196L2031999-05-19019 May 1999 Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs ML20206P0481999-05-12012 May 1999 Safety Evaluation Concluding That NPP Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at CNS & Adequately Addressed Actions Requested in GL 96-05 ML20195D1901999-05-0606 May 1999 Annual Rept ML20206J0811999-05-0404 May 1999 Rev 14 to CNS QA Program for Operation ML20206P9751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With ML20205Q0891999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Cooper Nuclear Station.With ML20204D9661999-03-31031 March 1999 Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept ML20204G8951999-03-15015 March 1999 CNS Inservice Insp Summary Rept Fall 1998 Refueling Outage (RFO-18) ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204B3701999-03-11011 March 1999 SER Accepting Third 10-year Interval Inservice Insp Plan Requests for Relief for RI-17,Rev 1 and RI-25,Rev 0.Request for Relief RI-13,Rev 2 Involving Snubber Testing & Is Being Evaluated in Separate Report 3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease1999-03-10010 March 1999 Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With 1999-09-30
[Table view] |
Text
ACCELERATED DIIBUTION DEMONST TION SYSTEM r.
~9 ~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9011210058 DOC.DATE: 90/10/09 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light, Co. 05000389 50-298 Cooper Nuclear Station, Nebraska Public Power Distric 05000298 50-312 Rancho Seco Nuclear Generating Station, Sacramento Mu 05000312 AUTH. NAME AUTHOR AFFILIATION I SCHNELLENSATTL Basler Electric RECIP.NAME RECIPIENT AFFILIATION ROSSI,C.E. Division of Operational Events Assessment (Post 870411)
SUBJECT:
Part 21 rept re zener diode VR2 on power supply board 9 1682 00 106 possibly installed backwards.
DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR TITLE: Part 21 Rept (50 DKT)
/ ENCL 0 SIZE:
NOTES 05000312 D
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 PD4-1 LA PDNP LA PD2-2 PD PD4-1 PD PDNP PD EDISON,G NORRIS,J 0 CONNORE P REYNOLDS,S INTERNAL: AEOD/DSP/TPAB NRR D OGCB11 NRR/DRIS/RVIB9D 01 RES/DSIR/EIB GNl RGN2 RGN3 RGN4 RGN5 EXTERNAL: INPO RECORD CTR NRC PDR R NSIC SILVER,E NOTES:
D D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL
r Basler Electric Highland, Illinois 8OX 269, ROUTE 143 ~ HIGHLAND, IL 62249 USA. PHONE: 618I654-2341 ~ TWXI 510- 1003841 ~ FAX: 618/654 2351 October 9, 1990 Mr. Charles E. Rossi, Director Division of Operational Events Assessment U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Rossi,
On October 5, 1990, Basler Electric Company reported a possible problem to Mr. Chauncey Gould of your organization. We indicated there is a possibility that zener diode VR2 on power supply board 9 1682 00 106 may have been installed backwards. This power supply is used in Basler Electric Protective Relays. With VR2 installed backwards, resistor R I I and transistor Q2 will be thermally overstressed. This may eventually cause the power supply to quit operat-ing which would inhibit the Protective Relay from performing its design function.
'these power supplies are contained in Basler Electric Protective Relays listed below and were sold to the following companies:
~Com anv Q'"'"" 'Protective Relay Florida Power Corp. 3 '90tt339tt0 BEI-32 ELIE EIC AONIN Florida Power Corp. I F90630380 BE I -32 Ett E EIC AON I N Nebraska Public Power 3 277105 BEI-32 BLIE AIC AONON Sacramento Municipal Utility 8 GR88663 BEI-25 MIE A6C N5NIN MKW Power Systems I 63957 ~ BE 1-59 A3E CIC AONIN On October 5, 1990, Earl E. Welch of Florida Power Corp., Gary Sinclair of Nebraska Public Power and Gloria Carpenter of Sacramento Municipal Utility were notified of the possible problem. On October 8, 1990, Gene Schoeck of MKW Power Systems was notified of the possible problem.
Basler Electric will add to Acceptance Test Procedure 9 1682 00 930, per Engineering Change Authorization 11717, the following test, "measure the voltage across R22, it should be less than 0.5 Vdc". This will ensure that start-up circuit components Ql, Q2, R22, Rl I, 2 VR2 have performed their function and therefore will not be thermally overstressed. This action will be completed on October 12, 1990.
90ii210058 90i009 PDR 'DOCK 05000250 S PDC Manulacturers o1: Magnetic and Etectronlc Components ~ Power Products and Systems zy(V
'1 mP I I Air. Charles E. Rossi r'October 9, 1990
~
page 2 To our knowledge this condition has not caused a Protective Relay malfunction in either a commercial or nuclear application. We recommend a visual inspection of VR2 polarity, a visual inspection for discoloring of Rl and Q2 and/or voltage measurement 1
of R22 to ensure normal operation.
If any additional information is requir'ed, please contact me.
Sincerely, BASLER ELECTRIC COMPANY c /v'~ ~<Hwirz g~c fg ~,;,-, gE.A 31m Schwellensattl Quality Engineering 3S/jks cc: Ed Leird, Basler Electric