i 1 $SMUD SACRAMENTO MUNICIPAL UTILITY DIS 1RICT C 6201 S Street. P.o. Boo ?.3830, Sacramento CA 95852 1830,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA i
AGM/NPP 89-062 Feburary 27, 1989 U. S. Nuclear Regulatory Commission Attn:
J. B. Martin, Regional Administrator j
Region V 1450 Maria Lane, Suite 210 Halnut Creek, CA 94596 i
Docket No. 50-312 l
Rancho Seco Nuclear Generating Station License No. DPR-54 l
SPECIAL REPORT NUMBER 89-03:
FAILURE TO HAINTAIN SPECIFIC ACTIVITY OF THE PRIMARY SYSTEM HITHIN ADMINISTRATIVE LIMITS
Dear Mr. Martin:
I The specific activity of the primary system exceeded the administrative limits specified in Rancho Seco Administrative Procedure RSAP-0222 and as committed to in our response to Generic Letter 85-02.
The Sacramento Municipal Utility District hereby submits Special Report No. 89-03 in accordance with Rancho Seco adminir.trative controls.
Members of your staff with questions requiring additional information or clarification may contact Mr. Jim Clark at (209) 333-2935, extension 4378.
l Sincerely, V
n Dan R. Keuter Assistant General Manager Nuclear Power Production Attachment cc w/atch:
A. D'Angelo, NRC, Rancho Seco Document Control Desk, Washington DC 8903030474 090227 N
PDR ADOCK 05000312 S
PNU
)(
l RANCHO SECo NUCLEAR GENERATING STATloN O 1444o Twin Cities Road, Herald, CA 95638-9799;(209) 333 2935
i l
SPECIAL REPORT NUMBER 89-03 Failure to Maintain Specific Activity of the Primary System Within Administrative Limits Date of OccurleAtt i
February 1 - 2, 1989 Plant Conditions at Time of Occurrence l
Hot to Cold Shutdown.
l l
Identification of Occurrence The specific activity of the primary system exceeded administrative l
limits as specified in Rancho Seco Administrative Procedure RSAP-0222, i
l Rancho Seco Chemistry Control Commitment.
The procedure requires the j
l submission of a Special Report if the specific activity of the primary coolant is either greater than 0.8 pCi/mi I-131 or 43/E pCi/ml.
Description of Occurrence l
For the period from approximately 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> on February 1 to 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> on February 2, while in a hot then cold shutdown condition, Reactor Coolant System sample data indicated that specific activity was above 0.8 pCi/ml I-131; the 43/E limit was not exceeded.
It is normal for t
iodine activity to increase for a short period of time after a power reduction.
The District had committed to the 0.8 pCi/ml I-131 limit via letter dated June 11, 1985, in response to Generic Letter 8S-02.
I Corrective Action Taken In accordance with RSAP-0222, on detection of the unusual condition, isotopic analysis continued until restoration of specific activity to within limits.
The analysis performed on February 2 at 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> j
indicated that specific activity was below 0.8 pCi/ml I-131.
Per RSAP-0222 the following information i: attached:
Primary coolant specific activity and time duration when the activity exceeded 0.8 pCi/ml I-131 (Attachment 1).
Reactor power history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded (Attachment 1).
Cleanup flow history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded (Attachment 2).
I
i SPECIAL REPORT NUMBER 89-03 Failure to Maintain Specific Activity of the Primary System Nithin Administrative Limits Corrective Action Taken (Continued)
History of degassing operations, if any, starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded.
(No data is l
attached for this item because degassing operations were not performed during the period I-131 specific activity exceeded the limit.)
Fuel burnup by core region (Attachment 3).
\\
SPECIAL REPORT 89-03 Failure to Maintain Specific Activity of the Primary System Hithin Administrative Limits POWER LEVEL PARAMETER DATE/ TIME
(% Full Power)
VALUE I-131 28-Jan-89 00:25 92.0 0.142 pC1/ml l
l 29-Jan-89 01:15 92.0 0.14 pCi/mi 30-Jan-89 00:05 92.0 0.147 pCi/ml 31-Jan-89 00:10 92.0 0.157 pCi/ml 01-Feb-89 00:05 40.0 0.218 pCi/ml 01-Feb-89 05:00 0.0 1.75 pCi/ml 01-Feb-89 08:30 0.0 1.72 pCi/ml
-)
01-Feb-89 11:00 0.0 1.69 pCi/ml 02-Feb-89 02:10 0.0 1.47 pCi/mi l
02-Feb-89 10:15 0.0 0.655 pCi/ml l
l l
l 1
l l
l
__---.-__-___.t__
SPECIAL REPORT 89-03 Failure to Maintain Specific Activity of the Primary System Hithin Administrative Limits PARAMETER DATE/ TIME VALUE LETOOWN 27-Jan-89 01:45 75 GPM FLOH 28-Jan-89 00:25 75 GPM 29-Jan-89 01:15 75 GPM 30-Jan-89 00:05 75 GPH 31-Jan-89 00:10 75 GPM 01-Feb-89 00:05 75 GPM
\\
02-Feb-89 02:10 55 GPM 03-Feb-89 01:50 55 GPM 04-Feb-89 01:10 55 T?M 04-Feb-89 01:10 55 GPM
SPECIAL REPORT 89-03 i
Failure to Maintain Specific Activity of.the Primary System Within Administrative Limits BURNUP BATCH #
- OF ASSEMBLIES (HHD/HTU) lE 1
21,983 SC 8
29,746 68 16 30,013 l
7 32 26,093 I
8A 24 19,584 8B' 40 19,132 9
56 8,104 CORE AVERAGE - 18,442 HHD/HTU i
_ _ _ _ _ _ _ -. _ _ _ _