77 ;,, 3 --
" y t
n^.
i
)SMUD m.p l,
SACRAMENTO MUNICIPAL UTILITY DISTRICT D 6201 S Street, P.o. Boxi15830, Sacramento CA 95852-1830.(916) 452 3211 L
AN ELECTRIC SYSTEM'$ERVING THE HEART OF CALIFORNIA d@
AGM/NPP 89-263
,G M i 31 m
May 30, 1989 U. S. Nuclear Regulatory Commission Attn:
J. B. Martin, Regional Administrator Region V 1450 Maria Lane, Suite 210 Halnut Creek, CA 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 SPECIAL REPORT NUMBER 89-13: FAILURE TO MAINTAIN SPECIFIC ACTIVITY OF THE PRIMARY SYSTEM HITHIN ADMINISTRATIVE LIMITS
Dear Mr. Martin:
The specific activity of the primary system exceeded the administrative limits specified in Rancho Seco Administrative Procedure RSAP-0222 and as committed to in our response to Generic Letter 85-02.
The Sacramento Municipal Utility District hereby submits Special Report No. 89-13 in accordance with Rancho Seco administrative controls.
Members of your staff with questions requiring additional information or clarification may contact Mr. Jim Clark at (209) 333-2935, extension 4378.
Sincerely,
- c. db Dan R. Keuter Assistant General Manager Nuclear Plant Manager Attachment cc w/atch:
A. D'Angelo, NRC, Rancho Seco Document Control Desk, Washington DC 8906060016 890530
[
ADOCK 0500 2
{DR RANCHO SECO NUCLEAR GENERATING STATION D 1444o Twin Cities Road, Herald, CA 95638-9799;(209) 333-2935
_-__________w
H
[,
L.
SPECIAL REPORT NUMBER 89-13 Failure to Maintain Specific Activity of the L
Primary System Nithin Administrative Limits i:
Date of Occurrence March 28-29, 1989
' Plant' Conditions at Time of Occurrence
.The plant was at hot shutdown following a' trip on high pressure at 1515.
hours on-March 28.
Identification of Occurrence The specific activity of the primary system exceeded administrative limits as specified in Rancho Seco Administrative Procedure RSAP-0222, Rancho Seco Chemistry Control Commitment. The procedure requires the submission of a Special Report if the specific activity of.the primary coolant. is either greater than 0.8 pCi/ml I-131 or ~43/E pCi/ml.
Description of Occurrence For the period from approximately 1635 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.221175e-4 months <br /> on March 28 to 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br /> on March 29, while in a hot shutdown condition,' Reactor Coolant System sample data indicated thal specific activity was above -
0.8 pCi/ml I-131;'the 43/E limit was not exceeded.
It is normal for iodine activity to increase for a short period of time after a power reduction. The District had committed to the 0.8 pCi/mi 1-131 limit via letter dated June.11, 1985, in response to Generic Letter 85-02.
Corrective Action Taken In accordance with RSAP-0222, on detection of the unusual condition, isotopic analysis continued until restoration of specific activity to within limits..The analysis performed on March 29 at 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br /> indicated that specific activity was below 0.8 pCi/ml I-131.
Per RSAP-0222 the following information is attached:
Primary coolant specific activity and time duration when the activity exceeded 0.8 pCi/ml I-131 (Attachment 1).
Reactor power history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded (Attachment 1).
Cleanup flow history stuting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded (Attachment 2).
i
___.-__-_________._________m.
4 -
SPECIAL REPORT NUMBER 89-13 Failure to Maintain Specific Activity of the Primary System Within Administrative Limits l
-Corrective Action Taken,(Continued)-
History of degassing operations, if any, starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first' sample in which the limit was exceeded.
(No data is attached for this item because degassing operations were not performed during the period I-131' specific activity exceeded the limit.)-
- Fuel burnup~by' core region (Attachment 3).
l SPECIAL REPORT 89-13 Failure to Maintain Specific Activity of the Primary System Hithin Administrative Limits POWER LEVEL PARAMETER DATE/ TIME
(% Full Power)
VALUE I-131 26-Mar-89 21:15 93.0 0.162 pCi/ml 27-Mar-89 20:15 92.9 0.163 pCi/ml 28-Mar-89 15:45 0.0 0.307 pCi/ml 28-Mar-89 16:35 0.0 1.58 pCi/ml 28-Mar-89 18:20 0.0 1.70 pCi/mi 28-Mar-89 21:20 0.0 1.33 pCi/mi 29-Mar-89 00:15 0.0 1.36 pCi/ml 29-Mar-89 04:25 0.0 1.04 pCi/ml 29-Mar-89 08:25 0.0 0.786 pCi/ml 29-Mar-89 12:45 0.0 0.442 pCi/ml
V' 4
SPECIAL REPORT 89.
c Failure to Maintain Specific Activity of the Primary System Hithin Administrative Limits t
b,
- PARAMETER'
-DATE/ TIME VALUE LETDOWN 26-Mar-89' 21:15 67 GPM.
FLOW 27-Mar-89 20:15 67 GPM 29-Mar-89 00:15 55.GPM 29-Mar-89 04:25 73 GPM 29-Mar-89 08:25 70 GPM L__.
Z_______._.___
- o SPECIAL' REPORT 89-13 A*.'t.chment 3 i
L
~..
Failure to Maintain Specific Activity of the.
Primary System Nithin Administrative Limits t,
o I
1 BURNUP BATCH #
- OF ASSEMBLIES (MHD/MTU) 1E 1
22,212 l
SC 8
30,115 6B 16 30,355 7
32 26,444 i
8A 24 19,824 8B 40 19,388 9A' 16 7,445 l
9B 16 8,925 l
9C 16 9,020 l
l 9D 8
8,931 4
CORE AVERAGE = 18,773 MHD/MTU l