Category:INSPECTION REPORT
MONTHYEARIR 05000416/19990121999-09-29029 September 1999 Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20206U3981999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980101998-08-26026 August 1998 Insp Rept 50-416/98-10 on 980803-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000416/19980081998-07-14014 July 1998 Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980071998-06-0202 June 1998 Insp Rept 50-416/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Packages & Vehicles, Assessment Aids & Mgt Support IR 05000416/19980051998-05-28028 May 1998 Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980061998-05-19019 May 1998 Insp Rept 50-416/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Radiation Protection Activities in Support of 1998 Refueling Outage IR 05000416/19980041998-05-0505 May 1998 Insp Rept 50-416/98-04 on 980414-16.No Violations Noted. Major Areas Inspected:Maint & Plant Support ML20217F7631998-04-16016 April 1998 Insp Rept 50-416/98-301 on 980330-0403.No Violations Noted. Major Areas Inspected:Competency of Reactor Operator & Eight Senior Applicants for Issuance of OLs at Grand Gulf Nuclear Station IR 05000416/19980021998-04-15015 April 1998 Insp Rept 50-416/98-02 on 980222-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980011998-03-0404 March 1998 Insp Rept 50-416/98-01 on 980111-0221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000416/19970221997-12-15015 December 1997 Insp Rept 50-416/97-22 on 971130-980110.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering ML20203D5581997-12-0505 December 1997 Insp Rept 50-416/97-21 on 971019-1129.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970181997-11-25025 November 1997 Insp Rept 50-416/97-18 on 970804-22.Violations Noted.Major Areas Inspected:Operations & Maint.Nrc IP 40500 Used to Evaluate Licensee Effectiveness in Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations IR 05000416/19970201997-10-31031 October 1997 Insp Rept 50-416/97-20 on 970907-1018.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support Re Emergency Post Accident Sampling Sys Drill IR 05000416/19970161997-10-23023 October 1997 Insp Rept 50-416/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Licensed Operator Requalification Program Following Guidelines in IP 71001 IR 05000416/19970151997-10-0909 October 1997 Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000416/19970071997-10-0101 October 1997 Informs That Insp Rept 50-416/97-07 Has Been Cancelled & There Will Be No Insp Issued for This Rept Number IR 05000416/19970191997-09-12012 September 1997 Insp Rept 50-416/97-19 on 970803-0906.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970171997-09-0505 September 1997 Insp Rept 50-416/97-17 on 970804-08.No Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000416/19970121997-08-19019 August 1997 Insp Rept 50-416/97-12 on 970622-0802.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970131997-08-0606 August 1997 Partially Withheld Insp Rept 50-416/97-13 on 970714-18 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Review of Records,Repts,Testing,Maint & Assessment Aids IR 05000416/19970141997-08-0505 August 1997 Insp Rept 50-416/97-14 on 970714-17.Violations Noted. Major Areas Inspected:Plant Support & Program to Maintain Occupational Exposures ALARA & Training & Qualifications of Members of Radiation Protection Organization IR 05000416/19970091997-07-16016 July 1997 Insp Rept 50-416/97-09 on 970623-27.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits ML20148R4471997-07-0202 July 1997 Insp Rept 50-416/97-10 on 970602-05.No Violations Noted. Major Areas Inspected:Plant Support Including Liquid & Gaseous Radwaste Effluent Mgt Program,Radiological Environ Program & Meteorological Monitoring Program IR 05000416/19970111997-06-25025 June 1997 Partially Withheld Insp Rept 50-416/97-11 on 970602-06 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Records,Repts, Testing & Maint,Vital Area Barriers & Security Audit ML20148E2441997-05-29029 May 1997 Insp Rept 50-416/97-05 on 970310-27.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering Procedures ML20148D4501997-05-27027 May 1997 Insp Rept 50-416/97-06 on 970323-0510.Violations Noted.Major Areas Inspected:Licensee Operations,Including Emergency Procedure,Maint,Engineering & Plant Support ML20140E6411997-04-24024 April 1997 Insp Rept 50-416/97-03 on 970209-0322.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support Activities IR 05000416/19960211997-02-25025 February 1997 Insp Rept 50-416/96-21 on 961221-970208.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support 1999-09-29
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000416/19990121999-09-29029 September 1999 Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20206U3981999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980101998-08-26026 August 1998 Insp Rept 50-416/98-10 on 980803-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000416/19980081998-07-14014 July 1998 Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980071998-06-0202 June 1998 Insp Rept 50-416/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Packages & Vehicles, Assessment Aids & Mgt Support IR 05000416/19980051998-05-28028 May 1998 Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980061998-05-19019 May 1998 Insp Rept 50-416/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Radiation Protection Activities in Support of 1998 Refueling Outage IR 05000416/19980041998-05-0505 May 1998 Insp Rept 50-416/98-04 on 980414-16.No Violations Noted. Major Areas Inspected:Maint & Plant Support ML20217F7631998-04-16016 April 1998 Insp Rept 50-416/98-301 on 980330-0403.No Violations Noted. Major Areas Inspected:Competency of Reactor Operator & Eight Senior Applicants for Issuance of OLs at Grand Gulf Nuclear Station IR 05000416/19980021998-04-15015 April 1998 Insp Rept 50-416/98-02 on 980222-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980011998-03-0404 March 1998 Insp Rept 50-416/98-01 on 980111-0221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000416/19970221997-12-15015 December 1997 Insp Rept 50-416/97-22 on 971130-980110.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering ML20203D5581997-12-0505 December 1997 Insp Rept 50-416/97-21 on 971019-1129.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970181997-11-25025 November 1997 Insp Rept 50-416/97-18 on 970804-22.Violations Noted.Major Areas Inspected:Operations & Maint.Nrc IP 40500 Used to Evaluate Licensee Effectiveness in Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations IR 05000416/19970201997-10-31031 October 1997 Insp Rept 50-416/97-20 on 970907-1018.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support Re Emergency Post Accident Sampling Sys Drill IR 05000416/19970161997-10-23023 October 1997 Insp Rept 50-416/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Licensed Operator Requalification Program Following Guidelines in IP 71001 IR 05000416/19970151997-10-0909 October 1997 Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000416/19970071997-10-0101 October 1997 Informs That Insp Rept 50-416/97-07 Has Been Cancelled & There Will Be No Insp Issued for This Rept Number IR 05000416/19970191997-09-12012 September 1997 Insp Rept 50-416/97-19 on 970803-0906.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970171997-09-0505 September 1997 Insp Rept 50-416/97-17 on 970804-08.No Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000416/19970121997-08-19019 August 1997 Insp Rept 50-416/97-12 on 970622-0802.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970131997-08-0606 August 1997 Partially Withheld Insp Rept 50-416/97-13 on 970714-18 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Review of Records,Repts,Testing,Maint & Assessment Aids IR 05000416/19970141997-08-0505 August 1997 Insp Rept 50-416/97-14 on 970714-17.Violations Noted. Major Areas Inspected:Plant Support & Program to Maintain Occupational Exposures ALARA & Training & Qualifications of Members of Radiation Protection Organization IR 05000416/19970091997-07-16016 July 1997 Insp Rept 50-416/97-09 on 970623-27.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits ML20148R4471997-07-0202 July 1997 Insp Rept 50-416/97-10 on 970602-05.No Violations Noted. Major Areas Inspected:Plant Support Including Liquid & Gaseous Radwaste Effluent Mgt Program,Radiological Environ Program & Meteorological Monitoring Program IR 05000416/19970111997-06-25025 June 1997 Partially Withheld Insp Rept 50-416/97-11 on 970602-06 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Records,Repts, Testing & Maint,Vital Area Barriers & Security Audit ML20148E2441997-05-29029 May 1997 Insp Rept 50-416/97-05 on 970310-27.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering Procedures ML20148D4501997-05-27027 May 1997 Insp Rept 50-416/97-06 on 970323-0510.Violations Noted.Major Areas Inspected:Licensee Operations,Including Emergency Procedure,Maint,Engineering & Plant Support ML20140E6411997-04-24024 April 1997 Insp Rept 50-416/97-03 on 970209-0322.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support Activities IR 05000416/19960211997-02-25025 February 1997 Insp Rept 50-416/96-21 on 961221-970208.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support 1999-09-29
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000416/19990121999-09-29029 September 1999 Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20206U3981999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980101998-08-26026 August 1998 Insp Rept 50-416/98-10 on 980803-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000416/19980081998-07-14014 July 1998 Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980071998-06-0202 June 1998 Insp Rept 50-416/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Packages & Vehicles, Assessment Aids & Mgt Support IR 05000416/19980051998-05-28028 May 1998 Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980061998-05-19019 May 1998 Insp Rept 50-416/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Radiation Protection Activities in Support of 1998 Refueling Outage IR 05000416/19980041998-05-0505 May 1998 Insp Rept 50-416/98-04 on 980414-16.No Violations Noted. Major Areas Inspected:Maint & Plant Support ML20217F7631998-04-16016 April 1998 Insp Rept 50-416/98-301 on 980330-0403.No Violations Noted. Major Areas Inspected:Competency of Reactor Operator & Eight Senior Applicants for Issuance of OLs at Grand Gulf Nuclear Station IR 05000416/19980021998-04-15015 April 1998 Insp Rept 50-416/98-02 on 980222-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980011998-03-0404 March 1998 Insp Rept 50-416/98-01 on 980111-0221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000416/19970221997-12-15015 December 1997 Insp Rept 50-416/97-22 on 971130-980110.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering ML20203D5581997-12-0505 December 1997 Insp Rept 50-416/97-21 on 971019-1129.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970181997-11-25025 November 1997 Insp Rept 50-416/97-18 on 970804-22.Violations Noted.Major Areas Inspected:Operations & Maint.Nrc IP 40500 Used to Evaluate Licensee Effectiveness in Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations IR 05000416/19970201997-10-31031 October 1997 Insp Rept 50-416/97-20 on 970907-1018.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support Re Emergency Post Accident Sampling Sys Drill IR 05000416/19970161997-10-23023 October 1997 Insp Rept 50-416/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Licensed Operator Requalification Program Following Guidelines in IP 71001 IR 05000416/19970151997-10-0909 October 1997 Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000416/19970071997-10-0101 October 1997 Informs That Insp Rept 50-416/97-07 Has Been Cancelled & There Will Be No Insp Issued for This Rept Number IR 05000416/19970191997-09-12012 September 1997 Insp Rept 50-416/97-19 on 970803-0906.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970171997-09-0505 September 1997 Insp Rept 50-416/97-17 on 970804-08.No Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000416/19970121997-08-19019 August 1997 Insp Rept 50-416/97-12 on 970622-0802.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970131997-08-0606 August 1997 Partially Withheld Insp Rept 50-416/97-13 on 970714-18 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Review of Records,Repts,Testing,Maint & Assessment Aids IR 05000416/19970141997-08-0505 August 1997 Insp Rept 50-416/97-14 on 970714-17.Violations Noted. Major Areas Inspected:Plant Support & Program to Maintain Occupational Exposures ALARA & Training & Qualifications of Members of Radiation Protection Organization IR 05000416/19970091997-07-16016 July 1997 Insp Rept 50-416/97-09 on 970623-27.No Violations Noted. Major Areas Inspected:Emergency Plan & Implementing Procedures,Emergency Facilities & Equipment,Organization & Mgt Control,Training & Audits ML20148R4471997-07-0202 July 1997 Insp Rept 50-416/97-10 on 970602-05.No Violations Noted. Major Areas Inspected:Plant Support Including Liquid & Gaseous Radwaste Effluent Mgt Program,Radiological Environ Program & Meteorological Monitoring Program IR 05000416/19970111997-06-25025 June 1997 Partially Withheld Insp Rept 50-416/97-11 on 970602-06 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Licensee Physical Security Program,Including Records,Repts, Testing & Maint,Vital Area Barriers & Security Audit ML20148E2441997-05-29029 May 1997 Insp Rept 50-416/97-05 on 970310-27.Violations Noted.Major Areas Inspected:Licensee Operations & Engineering Procedures ML20148D4501997-05-27027 May 1997 Insp Rept 50-416/97-06 on 970323-0510.Violations Noted.Major Areas Inspected:Licensee Operations,Including Emergency Procedure,Maint,Engineering & Plant Support ML20140E6411997-04-24024 April 1997 Insp Rept 50-416/97-03 on 970209-0322.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support Activities IR 05000416/19960211997-02-25025 February 1997 Insp Rept 50-416/96-21 on 961221-970208.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support 1999-09-29
[Table view] Category:UTILITY
MONTHYEARIR 05000416/19900201990-10-30030 October 1990 Insp Rept 50-416/90-20 on 900915-1019.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Esf Sys Walkdown,Preparation for Refueling & Refueling Activity IR 05000416/19900181990-10-12012 October 1990 Insp Rept 50-416/90-18 on 900917-21.No Violations or Deviations Noted.Major Areas Inspected:Pump & Valve Inservice Testing & Followup of Previous Insp Findings IR 05000416/19900161990-10-10010 October 1990 Insp Rept 50-416/90-16 on 900827-31.No Violations or Deviations Noted IR 05000416/19900151990-09-0404 September 1990 Insp Rept 50-416/90-15 on 900721-0817.Violation Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Action on Previous Insp Findings & ROs IR 05000416/19900131990-08-16016 August 1990 Insp Rept 50-416/90-13 on 900709-13.Violation Noted But Not Cited.Major Areas Inspected:Radiation Protection Program in Areas of Internal & External Exposure Controls,Alara,Control of Radioactive Matls & Outage Planning IR 05000416/19890201989-09-26026 September 1989 Insp Rept 50-416/89-20 on 890828-0901.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Effluents,Plant Chemistry,Environ Monitoring & Followup on Two Employee Concerns IR 05000416/19890191989-09-11011 September 1989 Insp Rept 50-416/89-19 on 890715-0825.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Instrument Air Sys Walkdown, Action on Previous Insp Findings & ROs IR 05000416/19890181989-08-0101 August 1989 Insp Rept 50-416/89-18 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Licensee Action on Previous Insp Findings IR 05000416/19890171989-07-28028 July 1989 Insp Rept 50-416/89-17 on 890617-0714.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Esf Sys Walkdown,Action on Previous Insp Findings & Reportable Occurrences ML20246B2801989-06-27027 June 1989 Insp Rept 50-416/89-16 on 890520-0616.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Esf Sys Walkdown, 10CFR21 Procedures & Action on Previous Insp Findings IR 05000416/19890151989-06-20020 June 1989 Insp Rept 50-416/89-15 on 890530-0602.No Violations Noted. Major Areas Inspected:Onsite Followup of Facilities Recirculation Sys Pump Shaft Crack IR 05000416/19890131989-06-0505 June 1989 Insp Rept 50-416/89-13 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected:Pump & Valve Inservice Testing,Ie Bulletin Followup & Followup on Previous Insp Findings ML20245F5471989-06-0505 June 1989 Insp Rept 50-416/89-14 on 890415-0519.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Esf Sys Walkdown,Test Piping Support & Restraint Sys & Startup from Refueling ML20244E0571989-05-24024 May 1989 Insp Rept 50-416/89-08 on 890327-31 & 0419-21.Major Areas Inspected:Radiological Controls During Present Refueling Outage & follow-up on Employee Safety Concerns & Allegations IR 05000416/19890091989-05-16016 May 1989 Partially Withheld Insp Rept 50-416/89-09 on 890417-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security Audit Program,Records & Repts,Testing & Maint,Locks & Keys IR 05000416/19890121989-04-28028 April 1989 Insp Rept 50-416/89-12 on 890318-0414.Violation Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Installation,Testing of Mods,Outage Organization & Reportable Occurrences ML20246H7501989-04-26026 April 1989 Insp Rept 50-416/89-10 on 890327-31.No Violations or Deviations Noted.Major Areas Inspected:Piping Sys Procedures & Calculations IR 05000416/19890111989-04-26026 April 1989 Insp Rept 50-416/89-11 on 890410-14.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Procedures,Nrc Bulletin 87-001,Generic Ltr 88-01,Info Notices 88-003 & 89-001 & Feedwater Valves IR 05000416/19890071989-04-10010 April 1989 Insp Rept 50-416/89-07 on 890218-0317.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Observation,Esf Sys Walkdown & Other Areas ML20247E7441989-03-16016 March 1989 Insp Rept 50-416/89-04 on 890114-0217.Violation Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Procedures & Records & Preparation for Refueling IR 05000416/19890061989-03-13013 March 1989 Insp Rept 50-416/89-06 on 890221-24.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection for Unit Refueling Outage Scheduled for 890318 IR 05000416/19890051989-03-0808 March 1989 Partially Withheld Insp Repts 50-416/89-05 & 50-417/89-05 on 890131-0201 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Protected Area Barriers ML20235U3761989-02-27027 February 1989 Corrected Page 4 to Insp Rept 50-416/88-27 IR 05000416/19890011989-02-13013 February 1989 Insp Rept 50-416/89-01 on 890109-13.No Violations or Deviations Noted.Major Areas Inspected:Design Control,Design Changes & Mods ML20235K4611989-02-10010 February 1989 Insp Rept 50-416/89-03 on 890110-12.Violations Noted.Major Areas Inspected:Alert & Notification Sys,Training of Offsite Support Agency Personnel Assigned to Sys Monitoring & Operation & Review of Emergency Preparedness Procedures IR 05000416/19890021989-02-0808 February 1989 Insp Rept 50-416/89-02 on 890124-27.No Violations or Deviations Noted.Major Areas Inspected:Assessment of Compliance W/Nrc Bulletin 88-007, Power Oscillations in Bwrs IR 05000416/19880231988-11-0404 November 1988 Insp Rept 50-416/88-23 on 880924-1020.No Violations or Deviations Noted.Major Areas Inspected:Operation Safety Verification Radiological Protection & Physical Security Verification,Maint Observation & ESF Sys Walkdown IR 05000416/19880201988-11-0202 November 1988 Insp Rept 50-416/88-20 on 881003-06.No Violations or Deviations Noted.Major Areas Inspected:Annual Radiological Emergency Response Exercise IR 05000416/19880191988-10-0505 October 1988 Insp Rept 50-416/88-19 on 880820-0923.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Observation,Ros,Operating Reactor Events & Followup & Unresolved Items IR 05000416/19880161988-08-29029 August 1988 Partially Withheld Insp Rept 50-416/88-16 on 880725-29.No Violations Noted.Major Areas Inspected:Security Plan & Implementation Procedure,Security Program Audit,Records & Repts,Testing & Maint & Access control-personnel IR 05000416/19880171988-08-26026 August 1988 Insp Rept 50-416/88-17 on 880716-0819.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Maint & Surveillance Observations,Operational Safety Verification & ESF Sys IR 05000416/19880181988-08-25025 August 1988 Insp Rept 50-416/88-18 on 880808-12.No Violations or Deviations Noted.Major Areas Inspected:Areas of Fire Protection/Prevention.Strengths in Implementation of Fire Protection Program Listed IR 05000416/19880151988-08-10010 August 1988 Insp Rept 50-416/88-15 on 880718-22.No Violations or Deviations Noted.Major Areas Inspected:Previously Identified Findings in Area of Environ Qualification of Electrical Equipment Important to Safety IR 05000416/19880131988-07-28028 July 1988 Insp Rept 50-416/88-13 on 880606-10.No Violations Noted. Major Areas Inspected:Local Leak Rate Testing & Verification of Containment Integrity IR 05000416/19880141988-07-22022 July 1988 Insp Rept 50-416/88-14 on 880625-0715.No Violations or Deviations Identified.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observation & Surveillance Observation ML20151L8681988-07-13013 July 1988 Insp Rept 50-416/88-10 on 880523-27.No Violations or Deviations Noted.Major Areas Inspected:Licensee Response to Generic Ltr 83-28,including post-trip Review,Equipment Classification & Vendor Interface IR 05000416/19880121988-07-0505 July 1988 Insp Repts 50-416/88-12 & 50-417/88-01 on 880521-0624.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Enforcement Matters,Operational Safety Verification & Surveillance & Maint Observation IR 05000416/19880071988-05-0303 May 1988 Insp Rept 50-416/88-07 on 880319-0415.Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Esf Sys Walkdown,Ro, Operating Reactor Events & Inspector Followup IR 05000416/19880041988-04-21021 April 1988 Insp Rept 50-416/88-04 on 880307-11.No Violations or Deviations Noted.Major Areas Inspected:Operations,Design Control & Licensee Action on Previously Identified Insp Findings ML20151E7251988-04-0707 April 1988 Insp Rept 50-416/88-05 on 880307-11.No Violations Noted. Major Areas Inspected:Offgas Sys Hydrogen Control & Offsite Dose Assessments During Charcoal Bed Bypass ML20148P7091988-04-0101 April 1988 Revised Pages 2,9,14 & 17 to Insp Rept 50-416/87-32 ML20151C1301988-04-0101 April 1988 Insp Rept 50-416/88-03 on 880220-0318.Violations Noted. Major Areas Inspected:Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observation, Surveillance Observation,Ros & Operating Reactor Events ML20150E5591988-03-24024 March 1988 Insp Rept 50-416/87-32 on 871214-18.Violations Noted.Major Areas Inspected:Environ Qualification of Electrical Equipment,Implementation of 10CFR50.49 Requirements & Electrical Equipment within Scope of 10CFR50.49 IR 05000416/19880011988-03-0202 March 1988 Insp Rept 50-416/88-01 on 880116-0219.Violations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observation, Surveillance Observation & Unresolved Items & Mgt Meeting ML20150C0761988-02-22022 February 1988 Insp Repts 50-416/87-40 & 50-417/87-04 on 871219-880115. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Esf Sys Walkdown,Design Changes & Mod & Containment Integrity IR 05000416/19870351988-01-19019 January 1988 Insp Rept 50-416/87-35 on 871114-1218.Violation Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Operating Reactor Events & Fastener Testing for Bulletin 87-002 IR 05000416/19870371988-01-13013 January 1988 Insp Rept 50-416/87-37 on 871207-11.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention & Followup on Previously Identified Insp Items IR 05000416/19870391988-01-0606 January 1988 Insp Rept 50-416/87-39 on 871214-17.Violation Noted. Major Areas Inspected:Standby Svc Water & Circulating Water Sys Chemical Cleaning & Plant Chemistry Control ML20234F5621987-12-22022 December 1987 Partially Withheld Insp Rept 50-416/87-38 on 871130-1201 (Ref 10CFR2.790(d) & 73.21).Violations Noted.Major Areas Inspected:Circumstances of Licensee Reported Security Event Re Delayed Response to Vital Area Intrusion Alarm IR 05000416/19870331987-12-16016 December 1987 Insp Rept 50-416/87-33 on 871116-20.No Violations or Deviations Noted.Major Areas Inspected:Occupational Exposures During Extended Outages,Organization & Mgt Controls of Health Physics Staff & Solid Radwaste 1990-09-04
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000416/19990121999-09-29029 September 1999 Insp Rept 50-416/99-12 on 990725-0904.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990111999-09-28028 September 1999 Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Management Program,Radioactive Matl Transportation Program,Facilities & Equipment,Staff Knowledge & Performance & Staff Training IR 05000416/19990141999-09-27027 September 1999 Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program & Status of Effluent Radiation Monitors & Counting Room Instruments IR 05000416/19990151999-09-13013 September 1999 Partially Withheld Insp Rept 50-416/99-15 on 990816-20. Noncited Violation Noted.Major Areas Inspected:Licensee Physical Security Program,Personnel Access Control,Access Authorization & Protected Area Detection Aids IR 05000416/19990101999-08-24024 August 1999 Insp Rept 50-416/99-10 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000416/19990091999-08-0909 August 1999 Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990031999-07-30030 July 1999 Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified.Major Areas Inspected:Corrective Action Program Implementation IR 05000416/19990071999-07-23023 July 1999 Insp Rept 50-416/99-07 on 990622-25.Violations Noted.Major Areas Inspected:Announced Insp of Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures Performed IR 05000416/19990081999-07-15015 July 1999 Insp Rept 50-416/99-08 on 990502-0612.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990051999-06-27027 June 1999 Insp Rept 50-416/99-05 on 990321-0501.Violations Identified, Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19990061999-05-21021 May 1999 Insp Rept 50-416/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20206U3981999-05-18018 May 1999 Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Non-cited Violations Noted.Major Areas Inspected:Engineering IR 05000416/19990041999-04-23023 April 1999 Insp Rept 50-416/99-04 on 990131-0320.Violations Noted. Major Areas Inspected:Operation,Maintenance,Engineering & Plant Support ML20207E0881999-02-26026 February 1999 Notice of Violation from Insp on 990201-05.Violation Noted: on 990201,NRC Inspectors Identified That Area with Dose Rates Greater than 1000 M/H Not Provided with Locked or Continously Guarded Doors to Prevent Unauthorized Entry IR 05000416/19990011999-02-26026 February 1999 Insp Rept 50-416/99-01 on 990201-05.Violations Noted. Major Areas Inspected:Plant Support.Violation of TS 5.7.2 Identified for Failure to Control Locked High Radiation Area Around Spent Fuel Pool Cooling & Cleanup HX IR 05000416/19980151999-01-20020 January 1999 Insp Rept 50-416/98-15 on 981101-1212.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Suuport PNO-IV-99-005, on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed1999-01-13013 January 1999 PNO-IV-99-005:on 990113,Grand Gulf Operators Commenced Unit Shutdown,From 100 Percent Power,Due to One or More Apparently Degraded Current Transformers Located in Safety Related Div I,4.16 Kv Switchgear.State of Ms Informed IR 05000416/19980161998-12-24024 December 1998 Insp Rept 50-416/98-16 on 981207-11.Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program Was Conducted ML20198L7711998-12-24024 December 1998 Notice of Violation from Insp on 981207-11.Violation Noted: on 950630,licensee Made Change to Emergency Plan Without Commission Approval ML20196F1271998-12-0101 December 1998 Insp Rept 50-416/98-13 on 980920-1031.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196F1141998-12-0101 December 1998 Notice of Violation from Insp on 980920-1031.Violation Noted:From 980521 Through 981015,conditions Adverse to Quality Identified in Condition Rept 1998-0014 Not Promptly Corrected IR 05000416/19980141998-11-27027 November 1998 Insp Rept 50-416/98-14 on 981026-30.No Violations Noted. Major Areas Inspected:Exposure Controls,Controls of Radioactive Matls & Contamination,Surveying & Monitoring & Quality Assurance Oversight of Radiation Protection Program IR 05000416/19980111998-10-14014 October 1998 Insp Rept 50-416/98-11 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980121998-09-15015 September 1998 Insp Rept 50-416/98-12 on 980817-20.No Violations Noted. Major Areas Inspected:Training,Qualifications,Quality Assurance Oversight,Facilities & Equipment & Annual Reports IR 05000416/19980031998-09-0909 September 1998 Insp Rept 50-416/98-03 Cancelled IR 05000416/19980091998-08-31031 August 1998 Insp Rept 50-416/98-09 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980101998-08-26026 August 1998 Insp Rept 50-416/98-10 on 980803-07.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000416/19980081998-07-14014 July 1998 Insp Rept 50-416/98-08 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980071998-06-0202 June 1998 Insp Rept 50-416/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Packages & Vehicles, Assessment Aids & Mgt Support ML20248E7501998-05-28028 May 1998 Notice of Violation from Insp on 980405-0516.Violation Noted:On 980421,inspectors Found Back Doors on Diesel Generator Control Cabinet 1H22-p400 in Div 1 Standby Diesel Generator Room Standing Wide Open & Unattended IR 05000416/19980051998-05-28028 May 1998 Insp Rept 50-416/98-05 on 980405-0516.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000416/19980061998-05-19019 May 1998 Insp Rept 50-416/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Radiation Protection Activities in Support of 1998 Refueling Outage IR 05000416/19980041998-05-0505 May 1998 Insp Rept 50-416/98-04 on 980414-16.No Violations Noted. Major Areas Inspected:Maint & Plant Support ML20217F7631998-04-16016 April 1998 Insp Rept 50-416/98-301 on 980330-0403.No Violations Noted. Major Areas Inspected:Competency of Reactor Operator & Eight Senior Applicants for Issuance of OLs at Grand Gulf Nuclear Station IR 05000416/19980021998-04-15015 April 1998 Insp Rept 50-416/98-02 on 980222-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19980011998-03-0404 March 1998 Insp Rept 50-416/98-01 on 980111-0221.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000416/19970221997-12-15015 December 1997 Insp Rept 50-416/97-22 on 971130-980110.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering ML20203D5581997-12-0505 December 1997 Insp Rept 50-416/97-21 on 971019-1129.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 07100019/20110291997-12-0505 December 1997 Notice of Violation from Insp on 971019-1129.Violations Noted:Scaffold 08-779 Was Assembled to Contain Insulation on Small Gauge Pipe Just Down Stream of Containment Atmosphere Sample Inlet Valve 1P33F572A ML20199L9411997-11-25025 November 1997 Notice of Violation from Insp on 970804-22.Violation Noted: on or About Period of 970117-29,approved FP Program as Described in UFSAR Was Not Fully Implemented.Emergency Light 1T92S222A Was Not Capable of Performing Function IR 05000416/19970181997-11-25025 November 1997 Insp Rept 50-416/97-18 on 970804-22.Violations Noted.Major Areas Inspected:Operations & Maint.Nrc IP 40500 Used to Evaluate Licensee Effectiveness in Identifying,Resolving & Preventing Issues That Degrade Quality of Plant Operations IR 05000416/19970201997-10-31031 October 1997 Insp Rept 50-416/97-20 on 970907-1018.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support Re Emergency Post Accident Sampling Sys Drill ML20198Q0291997-10-31031 October 1997 Notice of Violation from Insp on 970907-1018.Violation Noted:As of 971011,security Patrols Had Not Reported Dark Areas in Temporary Covered Maint Work Area in Protected Area IR 05000416/19970161997-10-23023 October 1997 Insp Rept 50-416/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Review of Licensed Operator Requalification Program Following Guidelines in IP 71001 IR 05000416/19970151997-10-0909 October 1997 Insp Rept 50-416/97-15 on 970916-19.Three Weaknesses Noted During Exercise.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000416/19970991997-10-0909 October 1997 SALP Rept 50-416/97-99 for 960225-970906 IR 05000416/19970071997-10-0101 October 1997 Informs That Insp Rept 50-416/97-07 Has Been Cancelled & There Will Be No Insp Issued for This Rept Number ML20216J2081997-09-12012 September 1997 Notice of Violation from Insp on 970803-0906.Violation Noted:As of 970811,duplex Filter Selection Levers for HPCS & Div 1 Standby DGs Were in Both Position Such That Two Strainers/Filters Were Selected IR 05000416/19970191997-09-12012 September 1997 Insp Rept 50-416/97-19 on 970803-0906.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000416/19970171997-09-0505 September 1997 Insp Rept 50-416/97-17 on 970804-08.No Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs 1999-09-29
[Table view] |
Text
{{#Wiki_filter:.
'
.
' ,/# " "'*'
y
*
/.j P/
m
'f UNITED STATES NUCLEAR REGULATORY COMMISSION REGION ll 4, 101 MARIETTA ST., .....,o ATLANTA GEORGIA 30323
,
APR 0 71988 Report No.: 50-416/88-05 Licensee: System Energy Resources, In Jackson, MS 39205 Docket No.: 50-416 License No.: HPF-29
-
. .
Facility Name: Grand Gulf Inspection Conducted: March 7-11, 1988 Inspectors:
R. R. Marston N
Date Signed Accompanying P,ers nnel: C. A. Hughey Approved by: bid
. Kahle, Section Chief e//f/8 Date 6igned ision of Radiation Safety and Safeguards SUMMARY Scope: This special, announced inspection was conducted in the areas of offgas '
system hydrogen control and offsite dose assessments during charcoal bed bypasse Results: No violations or deviations were identified.
t i
a hDR AB8Fofo882T6 DCD o
.
*
.
,
.
REPORT DETAILS Persons Contacted Licensee Employees R. Brinkman, Radiological Engineer
*J. Cross, Site Director
*C. Elisaesser, Operations Coordinator
*R. Hutchinson, General Manager J. Lassetter, HP/ Chemistry Specialist
*A. McCurdy, Manager, Plant Operations
*J. Parrish, Chem / Rad Superintendent G. Smith, Plant Chemist
*J. Summers, Compliance Coordinator Other licensee employees contacted included engineers, technicians, cperators, and office personne Other Organizations L. Nesbitt, General Electric Company Nuclear Ragulatory Commission
*R. Dutcher, Senior Resident inspector
*J. Mathis, Resident Inspector
* Attended exit interview Exit Interview The inspection scope and findings were summarized on March 11, 1988, with those persons indicated in Paragraph 1. The inspector described the areas
- 4.nspected and discussed in detail the inspection findings listed below.
,
'
No dissenting conments were received from the license The licensee did not identify as proprietary any of the material provided to or reviewed by the inspector during this inspection.
l Licensee Action on Previous Enforcement Matters This subject was not addressed in the inspection.
. Introduction On February 27, 1988, while changing from the "B" to the "A" steam jet air ejector (SJAE), operations personnel noticed a sudden loss of offgas Flow and spiking of the hydrogen (H,) inline analyzers located in the offgas syste This was caused by a sudden burn of excess 2H within the offgas
l
?
_ _ _ _ _ - _ _ - _ _ _ _ - - _ _ _ - _ _ - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _
_ _ _ _ _ _ _ _ . _ _ _ _
.. . ..
.
-
.
l system. Although this burn apparently caused only minor equipment damage, l there was a potential for major equipment damage and personnel injury, exposure, and contaminatio The following paragraphs include a description of the event, the causes and corrective actions related to the burn and the dose assessment l relating to the increase in gaseous radioactivity discharged from the plan . General System Description Design Objectives The offgas system at Grand Gulf was designed to meet the following regulatory objectives:
-
The ALARA objectives of 10 CFR 50, Appendix 1
- The dose restrictions of 10 CFR 20, Appendix B
- General Design Criteria No. 60 (Control of Releases of Radioactive Materials to the Environment) and No. 64 (Monitoring of Radioactive Releases) of 10 CFR 50, Appendix A The primary design objectives of the system were:
- To recombine hydrogen and oxygen gases produced in the reactor by the radiolytic decomposition of water and therefore reduce explosion hazard To provide sufficient hold-up time for radioactive activation products and fission products to decay prior to releas To minimize the release of the particulate daughter products of noble gase To provide for the controlled release of radioactive gases to the environment during nonnal and off-normal operating condition System Description The inspector reviewed system description:. from the FSAR and current plant drawings, held discussions with licensee representatives, and performed a walkdown of the system with a cognizant licensee representativ (1) There were two redundant offgas processing system trains, each one capable of processing the entire offgas flow from the plant (A and B trains). Each train was composed of systems to process noncondensable gases and to control the release of radioactive
_ _ _ _ - _ . _ _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ -
_ _ _ _ _ _ _ _ _
.,
-
.
effluents to the env'ronment. The condenser air removal system ,
and the offgas system perform these functions. Neither train )
contains rotating part (2) Condenser Air Removal System The condenser air removal system consists of a first stage steam jet air ejector (SJAE), an intercondenser and a second stage SJAE. Main steam flows to the air ejectors to:
- Pump noncondensable gases from the main condenser
- Provide the motive force for the offgas system
- Dilute the offgas stream to less than 4% hydrogen concentration, and
- Remove noncondensables from the offgas flo An intercondenser is located between the first and second stage SJAE The intercondenser is cooled by plant service water (PSW) and functions to remove moisture from the offgas flo The significant gaseous wastes removed from the main turbine condenser by the SJAEs consist of the following:
- Radiolytic hydrogen and oxygen
- Condenser air inleakage
- Nitrogen-13, Nitrogen-16, and Oxygen-19
- Krypton, Xenon, and Iodine isotopes These gases are produced in the core region and travel to the main condenser along with the main stea (3) Offgas System The offgas system begins at the outlet of the second stage SJAE and ends at a connection to the radwaste ventilation syste The following is a brief sequential discussion of the major system components and their operating function (a) The offgas reheater (heat exchanger) superheats the gases and steam from the second stage SJAE to about 300*F before l entering the recombiner. This increases the recombiner catalyst efficiency by eliminating moisture. Main steam is used as a heat sourc (b) The catalytic recombiner recombines the hydrogen and oxygen produced by radiolytic decomposition by passing the process flow over trays of a platinum alloy catalys The water vapor temperature at the exit of the recombiner is normally in excess of 600'F. Gas flow rate prior to the recombiner is in excess of 100 standard cubic feet per minute (SCFM)
and is 20 SCFM as it exits the recombiner. This latter
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
______-
.
-
.
flow rate remains constant through the rest of the offgas syste (c) The superheated water vapor and inleakage air mixture from the recombiner flows through the offgas condenser where the bulk of the water vapor is cooled (160 F), condensed and remove This condenser (heat exchanger) is cooled by Turbine Plant Cooling Water (TPCW) flow through the tube sid (d) The process flow enters a water separator where entrained water droplets are removed as the flow passes through a stainless steel wire mesh de-entraining elemen (e) Two redundant inline hydrogen analyzers continuously monitor the H7 concentrations in the offgas process flow prior to entering the hold-up line. If a preset value on the monitors is exceeded, a main control room annunciator is actuated. An inline pretreatment radiation monitor also monitors the radioactivity of the process flow prior to entering the hold-up line. A more detailed discussion of these monitors is included in Paragraph (f) A hold-up line, consisting of a straight run of piping 500 feet long and 6 inches I.D. provides a delay of approximately seven and one-half minutes to allow for the decay of short-lived radionuclide (g) The cooler condenser (heat exchanger) cools the process flow by means of a glycol refrigeration system to as low as possible without freezing (35 F). This removes moisture from the process flow.
l (h) Another moisture separator removes any moisture droplets in the process ficw that are not removed in the cooler condense (i) A high efficiency particulate air prefilter element (aluminum separator and glass fiber filter elements)
removes particulate daughter products of fission product gases from the process flo (j) Any additional moisture is removed by passing the process flow through one of four desiccant dryer beds. The dryer beds are regenerated on a regular basis using an electric heater / dryer chiller system. The dewpoint of the process flow after the desiccant cryers is normally about -80 (k) Two redundant dewpoint analyzers continuously monitor the process flow relative humidit Excess moisture in the
_ _ _ _ _ - _ _ _ _ _ _ _
.
.-
-
.
process flow reduces the adsorption efficiency of noble gases on the charcoal bed (1) . The gas coolers further cool the process flow prior to entering the charcoal adsorber beds by means of a glycol refrigeration system. This cooling helps increase charcoal adsorption efficienc (m) Eight charcoal adsorber vessels, each containing about three tons of charcoal, adsorb radioactive fission product gases (xenon and krypton) thereby allowing significant delay and allowing for their deca Any particulate daughter products, aloag with radioactive isotopes c~
iodine, are retained in the charcoal beds. The gas coolers and adsorber beds are enclosed in a refrigerated vault kept at 0 A bypass line is constructed around the gas coolers and adsorber beds and is used during startu (n) Two redundant post-treatment radiation monitors continuously monitor radiation levels within the process stream. These monitors provide for automatic termination of offgas releases in case of high radiation levels in the process strea A more detailed discussion of these monitors is included in Paragraph (o) The process flow is then filtered through high efficiency particulate air (HEPA) after-filters to remove any remaining particulate daughter products and carbon dus (p) The final effluent from the offgas system is incorporated into the radwaste ventilation system which is monitored for radioactivity prior to release to the environment. A more detailed discussion of the radiation monitors is included in Paragraph (q) Several water-filled loop seals are located along each train to prevent gas escape from the process flow through various system drain c. Radiologicai Monitoring Systems The following systems were evaluated:
(1) Offgas Pretreatment Radiation Monitoring System This system monitors radioactivity in the condenser offgas at the inlet to the hold-up piping after it has passed through the offgas condenser and moisture separator. A continuous sample is extracted from the offgas pipe via a sample lin It is then i
t
- - - , _ _ - -..-.,,,-,., , ,-n..~.-, - , , - - - - . ~ . -
.
-
,
-
.
l
passed through a sample chamber and sample panel before being returned to the suction side of the steam jet air ejector (SJAE). The sample panel can be purged with room air to check detector response to background radiation. The sample panel measures and indicates sample line flow. A Geiger-Muller (GM)
tube is positioned adjacent to the vertical sample chamber and monitoring is provideg locally and to the control room. The monitor range is 1-10 mR/hr on a six decade log scale. The principal gases detected are Kr-85, Kr-87, Kr-88, Xe-133m, and Xe-13 Three trip circuits provide alarm functions onl Readings are displayed on a r9diation monitor and actuate the
- following control room annunciators
- Offgas high-high, offgas high, and offgas downscale. High or low sample line flow measured at the sample panel actuates a control room offgas
sample high-low flow annunciator. The radiation level output of
'
the monitor can be directly correlated to the concentration of the noble gases by using the semiautomatic vial sample panel to obtain a grab sample. The sample is analyzed in the plant counting room with the multichannel analyzer (MCA) and the results correlated with the monitor readin (2) Carbon Bed Vault Monitor The carbon vault is monitored for gross gamma radiation levels with a single channe16 GM tube monitor. The monitor reads out over a range of 1-10 mR/hr over a six decade logarithmic scal The principal nuclides detected are Xe-135, Xe-135m, Kr-87, and Kr-8 The channel includes a sensor and converter, an indicator and trip unit, and a locally mounted auxiliary ut.i The indicator and trip unit is located in the control room. The channel provides for both loeg1 and remote readout of gama radiation over a range of 1-10 mR/hr. The indicator and trip unit has one adjustable upscale trip for alarm and one downscale tri The trip circuits may be verified by means of test signals or through use of portable gamma source A licensee representative stated that the decector was located near the room ventilation exhaust duc (3) Offgas Post-treatment Radiation Monitor This system monitors radioactivity in the offgas piping downstream of the offgas charcoal adsorbers and upstream of the offgas system discharge valve. A continuous sample is passed through the offgas post-treatment sample panel for monitoring and sampling and returned to the effgas system pipin The sample panel has a pair of filters (one for particulate collection and one for halogen collection) in parallel (with respect to the flow) with two identical gross radiation detection assemblies (for determination of noble gases). Each gross radiation detection assembly consists of a shielded chamber, a set of GM tubes and a check sourc Two radiation
.
-
.
-
.
monitors in the control room displag the measured gross radiation level over a range of 10-10 over five decades on a logarithmic scal The principal nuclides detected are Kr-85 and Xe-13 The sample panel shielded chambers can be purged with room air to check detector response to background radiation. The sample panel measures and indictes sample line flow. A check source for each detection assemoly operated from the control room can be used to check operability of the gross radiation chambe Each radiation monitor has three trip circuits: two-upscale (high-high-high, and high) and one downscale (low). Each trip is visually displayed on the radiation monito These three trips actuate corresponding control room annunciators: offgas post-treatment high-high-high radiation offgas post-treatment high radiation, and offgas post-treatment downscale. A trip circuit on the recorder actuates an offgas post-treatment high-high radiation annunciato High or low sample flow actuates a control room annunciato A trip auxiliary unit in the control room takes the high-high-high and downscale trip setpoint and initiates closure of the offgas system discharge and drain valves if its logic is satisfied. A vial sampler panel similar to the pretreatment sampler panel is provided for grab sample collection to allow isotopic analysis and gross monitor calibratio (d) Offgas and Radwaste Building Ventilation Radioactivity Monitoring System The system monitors for gaseous radioactivity in the offgas and Radwaste Building discharge, including radwaste storage tank vents for gross radiation level, and collects halogen and particulate samples. The gross radiation detection assembly consists of a shielded chamber, a beta sensitive GM tube, and a check source. A radiation monitor in the control room analyzes and visually dgsplays the measured gross radiation level over a range of 10-10 cpm. The sample panel shielded chamber can be purged with room air to check detector response to background radiation. The sample panel measures and indicates sample line flow. /, check source operated from the control room can be used to check operability of the gross radiation channe The radiation (high-high and monitor high) andhas onethree trip (circuits; downscale low). two upscale
.
-
.
-
.
6. Event Description On Friday, February 26, 1988, at approximately 1630 hours, preparations were begun by operations personnel for changeover from "B" SJAE to "A" SJA A 20 SCFM air purge was placed through the "A" SJAE until the changeover froa the "B" SJAE at about 1700 hours the. next evening, Saturday, February 27, 1988. At the time of the changeover on' Saturday, the following conditions existed:
- Plant was at 100% power
-
Preheater "B" outlet temperature was 305*F Preheater "A" outlet temperature was 295 F
-
Recombiner "A" outlet temperature was 395 F Recombiner "B" outlet temperature was 600*F
-
Preheater "B" steam pressure was 110 psig Preheater "A" steam pressure was 100 psig
- Offgas flow rate was 40 SCFM (including purge flow)
- Post-treatment radiation monitor was indicating 60-65 cpm
-
"A" H analyzer was in auto in "zero purge" mode
"B" analyzer was in manual and "sample" mode reading 0.2-0.5 H2 conce tratio After placing the second stage of the "A" SJAE in service, the steam supply pressure was being raised to the normal operating pressure of 130 psig, when operations personnel received a second stage low steam flow alar Steam supply pressure was reduced to 80 psig while instrument (I&C) technicians were called to vent the pressure transmitter This venting cleared the alarms and steam supply pressure was brought back up to 130 psi The final step in changcover from the "B" to the "A" SJAE was begun by
"bumping" open the suction valve (F003A) from the low pressure condenser to the first stage "A" SJAE, as per procedure. As offgas flow to "A" recombiner increased "B" recombiner temperature started to decrease as expected. However, there was no corresponding incresse in "A" recombiner temperature. (The 2H,+0 9 to 2H 9 0 recombination is an exothermic reaction).
The "A" reconbiner pressure differential was normal; therefore, operations personnel continued to "bump" open F003A in an attempt to increase offgas flow and therefore raise "A" recombiner outlet temperatur At about 1745 hours, operations personnel noticed spiking of both in-line hydrogen analyzers (analyzers indicate 0-5% 9H ) and a loss of offgas flo Water induction into the recombiner was sGspected at that tim OperaLions personnel opened the "B" drain valves and then the "A" recombiner drain valves as per procedure. Subsequently, offgas flow indication returned. The hydrogen monitors were reset within ten minutes after flow retur The " A" recombiner outlet temperature quickly increased to 600'F (normal operating tenperature) from an indicated 400* It was later discovered that the recorder could not indicate below 400'F because of recorder mechanical problem . _ _ _ .
,
*
-
.
-
.
The first charcoal adsorber beds in each of the two parallel trains were determined. to be hot imediately after the bur Charcoal adsorber bed D012B was at 140 F and and D012A was at 110'F. (Offgas flows in parallel through two trains of four charcoal beds and one gas cooler each).
Inline dewpoint indicators also pegged out high. It was later determined that high system temperature during the burn had destroyed the electrodes associated with the instrument Because of the hydrogen burn, plant power was reduced to 75%. Health physics personnel were requested to survey offgas system areas. No significant increases in airborne radiation levels were detected, indicating that no offgas system loop seals had been blown. This was also an indication that no major pressure transients occurred during the burn because any system pressure exce.eding approximately six (6) psig dould have blown loop seals. Normal system operating pressure was one (1) psi By 1845 hours, the charcoal treatment system was bypassed. Plant power had been reduced to 55% to help ensure that offgas process flow radiation levels stayed below radiation monitor trip-points.
By 1945 hours, nitrogen purging of the charcoal adsorber beds had begu Temperatures peaked at 443'F in bed D012A and 700'F in bed 0012B at about 2300 hours. By March 1, 1988, the bed temperatures had decreased to the 20-30*F range with the nitrogen purge continuing.
1 On March 2,1988, at about 0900, three beds of the "A" charcoal train were placed back in service. Nitrogen purging of D012A and all of "B" train
'
beds continue ;
Radiological Significance of Event The inspector evaluated the radiological aspects of the event through discussion with licensee representatives, review of records, and examination of radiation sampling, monitoring, and analysis equipment used in conjunction with the offgas system. The inspector also reviewed calculations of monitor setpoints and dose assessment for releases during the event.
) While the offgas flow was bypassed the Radwaste Building Ventilation Exhaust Radiation Monitor reading peaked at 2.0 E+3 counts per minute (cpm) at 0645 CST on February 29, compared to a pre-event reading of 1.0 E-2 cpm.
1 The maximum effluent rate (61.9 microcuries per second) occurred at i 0327 CST on February 29. The effluent monitor gross reading peaked at a
'
later time due to increasing background radiation. The instantaneous dose rate at the plant boundary corresponding to the maximum source term was 2.10 mrem per year, well within allowable limits.
l
i
. _ . _ . . , , _ . , . . _ . _ , , , - - , _ , , . _ _ , _ , , - , . . . . . _ _ - . . ,,.. ~,-_.. _ _ _ _ _ _
*
.
.
The inspector reviewed Technical Specification and procedural requirements for the:
Offgas Pretreatment Monitor; Carbon Bed Vault Radiation Monitor; Offgas Post Treatment Monitor;
*
Offgas and Radwaste Building Ventilation Exhaust Radiation Monitor; -{
Hydrogen Analyz es; and
* Charcoal and HEPA filter testing (Offgas Af ter Filters and Radwaste Building Ventilation Exhaust filters).
Operating and surveillance requirements for the offgas pretreatment monitor, the offgas post-treatment monitor, the offgas and radwaste monitor, and the hydrogen analyzers were found in Technical Specification (
Tables 3.3.7.12-1, ano 4.3.7.12-1. Technical Specification Table 4.4.5-1 provided additional surveillance requirements for the offgas pretreatment monitor. Technical Specification Tables 3.3.7.1-1 and 4.3.7.1-1 provided operating and surveillance requirements for the carbon bed vault radiation monitor, and Technical Specification Tables 3.3.7.5-1 and 4.3.7.5-1 orovided additional operating and surveillance requirements for the Offgas and Radwaste Building ventilation exhaust radiation monitor. Technical Specification Sections 3.11.2 and 4.11.2 also provided operating and surveillance requirements for the monitors and 'ie hydrogen analyzer The inspector selectively reviewed procedures implementing the Technical Specification requirements and reviewed licensee documentation showing that surveillances (calibrations, functional tests, filter testing, and dose calculations) had been performed within the required frequencie The radiation monitors appeared to have been functioning properly at the time of the event. The hydrogen analyzer recorders went offscale (greater than 5 percent) at the time of the event, so grab samples were taken and analyze Procedure 06-CH-IN62-0051, "Offgas Hydrogen Concentration,"
' Revision 23, was used for this operation. The first sample was taken at 7:47 pm on February 27. Since licensee personnel were concerned about the operability of the gas chromatograph, a "pop" test was conducted on the
' tampl The test indicated that the concentration of hydrogen in the Ople was less than 4 percent by volume. Two more samples were taken over the next five hours and were analyzed on the gas chromatograph, which had tven determined to be operational and and had been functionally checkJd. The results indicated concentrations by volume of 0.03 percent hydrogen and 0.04 percent hydroge The hydrogen analyzers were reading b ck on scale by this tim ~
CauseW Conclusions / Corrective Actions
,
After the event, tre licensee assembled a task force consisting of the e , Manager-Plant Opera.tions, key onshift personnel involved with the event, 0, .'
>
i various pynt derFtment representatives and a vendor (GE) expert in the
'
- design ani, operation of the offgas system to determine the root causes,
'
i' condusio' )! /and cor.'ective action '
,
'
b
' \
I l) l\ ,
j' ' f, ,
, -
n , .-
-
<
*
.
a. Equipment Damage As a result of the ignition, the licensee noted the following equipment damage:
(1) The inservice prefilter had been damaged with partial melting of the aluminum separator material. The filter was subsequently removed and the other filter was placed in servic (2) The inline dewpoint indicator electrodes had been destroye (These electrodes were considered to be possible ignition sources.)
(3) About 25 pounds total of charcoal (calculated value) was burned in the charcoal beds. Each bed contains approximately 3 tons of charcoal. The licensee considered this an insignificant loss and did not plan to replace or add charcoal.
b. Causes and Corrective Actions (1) Intercondenser Fouling
'
During the week prior to the ignition, plant performance monitoring personnel had noted a degradation of plant efficiency. Low pressure (LP) condencer pressure had equalized with intermediate pressure (IP) condenser pressure resulting in a 5-6 megawatt loss in plant electrical outpu This degradation was the result of fouling problems within the i intercondenser of the inservice "B" SJAE. Flow through both intercondensers is cooled by Plant Service Water (PSW).
Biological fouling within the Intercondenser (tube-side) lowered its ability to condense first stage SJAE effluent and therefore maintain sufficient pressure differential across the air ejector. This degradation was the main reason for initiating i
the swap to the "A" SJA Biocides and dispersants added to the PSW in the past had been ineffective in preventing intercondenser fouling. Periodic mechanical or hydraulic cleaning had been required to keep these
.
'
- heat exchangers clean. The licensee had very recently changed j
to a different biocide / dispersant treatment regime in order to reduce fouling. Biological fouling (macro and micro) had been
- an ongoiag problem in general at Grand Gulf Nuclear Statio (2) Recombinor Wetting
,
Wetting and subsequent cooling of the "A" recombiner catalyst j resulted in the buildup of H 7 in the offgas system prior to i ignitio This wetting occurred as a result of the proccdural sequence for opening a arain valve in a low area between the l
.
<'
'
.
preheater and recombiner. Condensation collects in this area due to piping configuration and needs to be draine Wetting of the recombiner catalytt v.as not detected during the event because the recombiner temperature recorder (located in the main control room) had pegged low at about 400'F due to a mechanical failure of the recorder. Temperature history of the recombiner below 400'F cannot, therefore, be reproduce The licensee had subsequently revised System Operating Instructions 01-1-01-N62-1, Offgas System, to: (a) revise the sequence for opening the offgas header to the recombiner drain valves to ensure that any condensation and moisture had been drained prior to initiating offgas flow and (b) establish procedural holdpoints for verification of proper recombiner temperature profil (3) Ignition Source At the time of the inspection the licensee had not positively identified the f gnition sourc Because of the stoichiometric concentrations hydrogen, oxygen and humidity in the process flow at the time of ignition only a small amount of energy would have been required to ignite the mixtur The licensee suspected that the ignition occurred in the area of the desiccant dryers. The licensee and the inspector agreed that by insuring proper recombiner operation, ignition sources become a secondary consideratio (4) Preheater Steam Supply Pressure Several design problems existed in the main steam supply to the preheaters. Sufficient steam pressure could not be supplied to both A and B preheaters to allow simultaneous operation of both of the condenser air removal /offgas trains or to make a rapid changeover between trains. Insufficient steam supply to the preheaters reduced their ability to preheat process flow to the proper recombiner inlet temperature. A rapid switch from one train to another could slug the recombiner with wate To alleviate this problem, a Design Change Request (No. 87/113, dated 9/25/87) had been previously authorized to redesign the piping runs between the main steam equalizing header and the preheaters to allow sufficient steam supply pressure with both preheaters inservic The licensee had also experienced cycling problems with solenoid valves in the steam supply lines to the preheaters. During plant startup in January 1988, with the plant at 3% power, a valve in the steam supply line to the inservice preheater inadvertently closed, shuttir, off steam supply to the
:y
.:
..# L
-
..
*
e
.
13-
, preheate Subsequent wetting of the recombiner resulted in H2 concentration of 14% in the offgas syste There was ne ignition at that tim Design Change Request No. 87/113 also included provisions for replacing each solenoid valve with two manual valves. The
. licensee indicated that modifications described in the DCR would be completed during the next refueling outage. The inspectors urged the licensee to ensure that these modifications be completed as schedule . Radiological Considerations The licensee performed an analysis of the radiological output from the plant which could result from operating with only three charcoal beds operating in the offgas treatment system instead of the normal eight. The analysis showed that the plant could be expected to. operate within
,
!
Technical Specification limits for effluent . Sumary and Conclusions
,
The hydrogen burn took place in a system which was designed to contain such burns and detonations. .The burn was fully contained.
,
j The licensee was still in the process of evaluating the event at the time
! of the inspection. The integrity of the offgas system boundary did not appear to have been violated. The licensee had identified contributing
,
i causes of the incident, though the ignition source had not been
,
identified, f
The licensee had evaluated the event and had identified corrective
' actions, some definite and some tentative, depending on what further
- analysis might reveal. No radiological effluent restrictions were 5 exceeded during the even No violations or deviations were identified.
e
!