IR 05000440/1988009

From kanterella
Revision as of 04:33, 25 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-440/88-09 on 880420-0630 & Notice of Violation.Record Copy
ML20151L245
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/21/1988
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8808030417
Download: ML20151L245 (2)


Text

.'

.

UNITED STATES

, R E800g 4 NUCLEAR REGULATORY COMMISSION REGloN lli

{4 %

i

$ 9f 799 ROOSEVELT RO AD cun ettys. ituNOl5 60M7 t

.....

(JUL 21 1988

-

Docket No. 50-440

The Cleveland Eiactric Illuminating Company ATTN: Mr. Alvin Kaplan Vice President Nuclear Group 10 Center Road Perry, OH 44081 Gentluen:

This refers to the routine safety inspection conducted by Messrs. K. A. Connaughton and G. F. O'Dwyer of this office on April 20 through June 30, 1988, of activities at Perry Nuclear Power Plant, Unit 1, authorized by NRC Facil'ity Operating License No. NPF-58 and to the discussion of our findings with Mr. M. D. Lyst-r and others of your staff at the conclusion of the inspectio The enclosed copy of our inspection report identifies areas examined during the inspcction. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observatior s, and interviews with personne During this inspection, certain of your activities appeared to be in violation of NRC requirements, as specified in the enclosed Notic A written response is require In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, the enclosures, and your response to this letter will be placed in the NRC Public Document Roo The responses directed by this letter and the accompanying Notice are not subject to the clearance procedures of the Office of Management and Budget as requis3d by the Paperwork Reduction Act of 1980, PL 96-51 We will gladly discuss any questions you have concerning this inspectio ,0 0

Sincerely,

-ea en mo

/hbedC Richard C. Knop, Chief 7*

w Reactor Projects Branch 3 '

Eo om Enclosures:

o" Notice of Violation 8e Inspection Report f g No. 50-440/88009(ORP) gl See Attached Distribution /i l

,

--

.

,.

>

l The Cleveland Electric 2 Illuminating Company 'JUL 21 1988 l

_

Distribution

'

cc w/ enclosures:

F. R. Stead, Director, Nuclear Support Department M. D. Lyster, General Manager, Perry Plant Operations Department R. A.-Newkirk, Manager, Licensing and Compliance Section S. S. Kensicki, Director, Perry Plant Technical Department

"iDCD/DC8;(RIDS)k Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Es James W. Harris, State of Ohio Robert M. Quillin, Ohio Department of Health State of Ohio, Public Utilities Commission c

.

.

l l

)

!

l 2 i l

)