Category:Inspection Plan
MONTHYEARML25055A0522025-02-24024 February 2025 Notification of Conduct of a Fire Protection Team Inspection ML24351A0082024-12-16016 December 2024 Notification of NRC Baseline Inspection and Request for Information Report 05000440/2025001 ML24344A1152024-12-0909 December 2024 Request for Information for an NRC Site Inspection for Plants with a Timely Renewal Application Inspection Report 05000440/2025010 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24088A1922024-03-28028 March 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 IR 05000440/20230062024-02-28028 February 2024 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2023006) ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23090A1242023-04-0505 April 2023 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000220/2023011 and 05000410/2023011 IR 05000440/20220062023-03-0101 March 2023 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2022006) IR 05000220/20220062023-03-0101 March 2023 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022006 and 05000410/2022006) ML23026A2112023-01-26026 January 2023 Notification of Nrc Baseline Inspection and Request for Information Inspection Report 05000440/2023002 ML22336A1222022-12-0505 December 2022 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000440/2023010 IR 05000220/20220052022-08-31031 August 2022 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022005 and 05000410/2022005) IR 05000440/20220052022-08-26026 August 2022 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2022005) ML22234A1482022-08-22022 August 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines IR 05000440/20210062022-03-0202 March 2022 Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2021006) IR 05000220/20210062022-03-0202 March 2022 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021006 and 05000410/2021006) ML21257A4602021-09-15015 September 2021 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Perry Nuclear Power Plant IR 05000440/20210052021-09-0101 September 2021 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2021005) IR 05000220/20210052021-09-0101 September 2021 Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021005 and 05000410/2021005) ML21168A0662021-06-17017 June 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000440/2021010 ML21099A0872021-04-0808 April 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000440/2021012 ML21088A2682021-03-30030 March 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000440/20200062021-03-0404 March 2021 Annual Assessment Letter Perry Nuclear Power Plant (Report 05000440/2020006) IR 05000220/20200062021-03-0303 March 2021 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020006 and 05000410/2020006) ML21020A0392021-01-20020 January 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000440/2021010 ML21004A0922021-01-0404 January 2021 Notification of NRC Baseline Inspection and Request for Information, Inspection Report 05000440/2021001 ML20294A0462020-10-19019 October 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000440/20200052020-09-0101 September 2020 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2020005) IR 05000440/20190062020-03-0303 March 2020 Annual Assessment Letter Perry Nuclear Power Plant (Report 05000440/2019006) IR 05000220/20190062020-03-0303 March 2020 Annual Assessment Letter for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2019006 and 05000410/2019006) ML19344D0232019-12-0909 December 2019 Ti 2515/194 Inspection Documentation Request IR 05000220/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000220/2019005 and 05000410/2019005) IR 05000440/20190052019-08-28028 August 2019 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2019005) ML19205A4252019-07-23023 July 2019 Ltr. 07/23/19 Perry Nuclear Power Plant, Unit 1 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000440/2019004 (DRS-L.Rodriguez) IR 05000220/20180062019-03-0404 March 2019 Annual Assessment Letter for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2018006 and 05000410/2018006) IR 05000440/20180062019-03-0404 March 2019 Annual Assessment Letter for Perry Nuclear Power Plant (Report 05000440/2018006) ML18348A5322018-12-13013 December 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000220/2019403 and 05000410/2019403 IR 05000220/20180052018-08-28028 August 2018 LLC, Units 1 and 2 Updated Inspection Plan: Inspection Report 05000220/2018005 and 05000410/2018005 IR 05000440/20180052018-08-28028 August 2018 Updated Inspection Plan for Perry, Unit 1 (Report 05000440/2018005) IR 05000440/20170062018-03-0202 March 2018 Annual Assessment Letter for Perry Nuclear Power Plant; Report 05000440/2017006 IR 05000220/20170062018-02-28028 February 2018 Annual Assessment Letter for Nine Mile Point Nuclear Station LLC, Units 1 and 2 (Report 05000220/2017006 and 05000410/2017006, Report 05000220/2017402 and 05000410/2017402, and Report 05000220/2017501 and 05000410/2017501) ML18005A6092018-01-0505 January 2018 Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000440/20170072017-12-21021 December 2017 NRC Problem Identification and Resolution Inspection Report 05000440/2017007 2025-02-24
[Table view] Category:Letter
MONTHYEARRS-25-038, Constellation Submittal of Fitness for Duty Performance Data Reports - Annual 20242025-02-27027 February 2025 Constellation Submittal of Fitness for Duty Performance Data Reports - Annual 2024 ML25055A0522025-02-24024 February 2025 Notification of Conduct of a Fire Protection Team Inspection 05000440/LER-2024-004, Division 3 Diesel Generator Inoperable Due to Low Output Voltage Resulting in Loss of Safety Function2025-02-24024 February 2025 Division 3 Diesel Generator Inoperable Due to Low Output Voltage Resulting in Loss of Safety Function ML25052A2232025-02-21021 February 2025 23-64 Nine Mile Point Nuclear Station - NRC Office of Investigations Case Nos. 1-2024-005 and 1-2024-008 ML25058A1722025-02-20020 February 2025 Submittal of Core Operating Limits Report, Revision 7, for Nine Mile Point Nuclear Station, Unit 1 Cycle 26 ML25045A0482025-02-19019 February 2025 Correction to Pages Issued for Amendment No. 254 Regrading Adoption of Technical Specifications Task Force Traveler TSTF-591 ML25049A2942025-02-19019 February 2025 Operator Licensing Examination Approval IR 05000220/20240042025-02-12012 February 2025 Integrated Inspection Report 05000220/2024004 and 05000410/2024004 and Independent Spent Fuel Storage Installation Inspection Report 07201036/2024004 NMP1L3622, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142025-01-30030 January 2025 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 NMP1L3618, CFR 50.46 Annual Report2025-01-27027 January 2025 CFR 50.46 Annual Report L-25-013, License Renewal Application, Revision O - Supplement 82025-01-27027 January 2025 License Renewal Application, Revision O - Supplement 8 05000440/LER-2024-005, Division 3 Diesel Generator Inoperable Due to Failure of the Right Bank Air Start Motor2025-01-23023 January 2025 Division 3 Diesel Generator Inoperable Due to Failure of the Right Bank Air Start Motor IR 05000440/20243012025-01-23023 January 2025 NRC Initial License Examination Report 05000440/2024301 ML25022A2402025-01-22022 January 2025 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Nine Mile Point Nuclear Station - Holtec HI-STORM FW Ad HI-TRAC Vw IR 05000220/20254032025-01-16016 January 2025 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2025403 and 05000410/2025403 ML24353A1372025-01-15015 January 2025 Proprietary Determination Constellation Energy Generation, LLC 2024 Deferred Premiums IR 05000440/20244022025-01-13013 January 2025 Security Baseline Inspection Report 05000440/2024402 05000410/LER-2024-002-01, Supplement to NMP2 Licensee Event Report 2024-002-00, Automatic Reactor Scram on Turbine Trip Due to Failed Breaker2025-01-10010 January 2025 Supplement to NMP2 Licensee Event Report 2024-002-00, Automatic Reactor Scram on Turbine Trip Due to Failed Breaker ML24358A1832025-01-0707 January 2025 Issuance of Relief Proposed Alternative Request Associated with Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24344A2742024-12-19019 December 2024 Alternative Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case OMN-32 L-24-256, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 72024-12-19019 December 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 7 ML24339B7292024-12-18018 December 2024 Amd - Constellation - Adoption of TSTF-591 ML24351A0082024-12-16016 December 2024 Notification of NRC Baseline Inspection and Request for Information Report 05000440/2025001 ML24344A1152024-12-0909 December 2024 Request for Information for an NRC Site Inspection for Plants with a Timely Renewal Application Inspection Report 05000440/2025010 IR 05000440/20240102024-12-0505 December 2024 NRC - Inspection Report 05000440/2024010 L-24-257, License Renewal Application for the Perry Power Plant Revision 0 - Response to Requests for Confirmatory Information - (Set 2)2024-12-0404 December 2024 License Renewal Application for the Perry Power Plant Revision 0 - Response to Requests for Confirmatory Information - (Set 2) ML24337A2372024-12-0202 December 2024 Operator Licensing Examination Approval Perry Nuclear Power Plant, December 2024 L-24-263, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-11-27027 November 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML24331A2592024-11-27027 November 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML24331A2792024-11-26026 November 2024 Supplement to Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition - Revise LaSalle, Units 1 and 2 Technical Specificati ML24268A2792024-11-25025 November 2024 Letter to Connie Kline with Enclosed NRC Response NMP1L3614, Response to Request for Additional Information for License Amendment Request to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-11-22022 November 2024 Response to Request for Additional Information for License Amendment Request to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling 05000410/LER-2024-002, Automatic Reactor Scram on Turbine Trip Due to Failed Breaker2024-11-22022 November 2024 Automatic Reactor Scram on Turbine Trip Due to Failed Breaker IR 05000220/20244022024-11-20020 November 2024 Material Control and Accounting Program Inspection Report 05000220/2024402 and 05000410/2024402 (Cover Letter Only) L-24-209, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 3)2024-11-19019 November 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 3) IR 05000410/20240032024-11-0808 November 2024 Integrated Inspection Report 05000220/1014003 and 05000410/2024003 L-24-243, License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 62024-11-0707 November 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 6 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums L-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 2025-02-27
[Table view] |
Text
March 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2 (REPORT 05000220/2011001 AND 05000410/2011001)
Dear Mr. Langdon:
On February 15, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Nine Mile Point Nuclear Station (NMPNS) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, NMPNS Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at NMPNS Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. In addition to the baseline inspections, we plan on conducting Inspection Procedure 71004, Power Uprate. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5233 with any questions you have regarding this letter.
Sincerely,
/RA/
Glenn T. Dentel, Chief Projects Branch 1
Division of Reactor Projects
Docket Nos. 50-220, 50-410 License Nos. DPR-63, NFP-69
Enclosure: Nine Mile Point Inspection / Activity Plan
cc w/ encl: Distribution via ListServ
ML12061A297
SUNSI Review Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP
NAME NPerry/via email GDentel
DATE 02/28 /12 03/1/12
Page 1 of 2 03/01/2012 14:31:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2012 - 06/30/2013 11/7EXAM
- NMP2 INITIAL OL EXAM
2 FY12-NMP2 INITIAL OPERATOR LICENSING EXAM U01841 02/20/2012 02/24/2012
FY12-NMP2 INITIAL OPERATOR LICENSING EXAM U01841 03/19/2012 03/30/2012 71124
- RAD HAZARD ACCESS /ALARA
2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/12/2012 03/16/2012
IP Occupational ALARA Planning and Controls 71124.02 03/12/2012 03/16/2012 7111108G
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - BWR 7111108G 04/16/2012 04/20/2012 IP 60854
- ISFSI U1 CRANE INSPECTION FOR DNMS
1 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 04/10/2012 04/13/2012 71124
- HP INSPECTION 01 02 03 04
2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/23/2012 04/26/2012
IP Occupational ALARA Planning and Controls 71124.02 04/23/2012 04/26/2012
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/23/2012 04/26/2012
IP Occupational Dose Assessment 71124.04 04/23/2012 04/26/2012 TRI FI
- TRIENNIAL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection [Triennial]
7111105T 06/04/2012 06/08/2012 1, 2 IP Fire Protection [Triennial]
7111105T 06/18/2012 06/22/2012 ISFSI
- ISFSI TESTING
1, 2 IP Operation Of An ISFSI 60855 06/01/2012 10/31/2012 71124
- RADWASTE
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 06/25/2012 06/29/2012 TI 182
- DEGRADATION OF UNDERGROUND PIPING
1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/25/2012 06/29/2012 EP PROGR
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 07/16/2012 07/20/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/16/2012 07/20/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/16/2012 07/20/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/16/2012 07/20/2012 71124
- AIRBORNE RAD & DOSE ASSESSMENT
1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 07/23/2012 07/26/2012
IP Occupational Dose Assessment 71124.04 07/23/2012 07/26/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 03/01/2012 14:31:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2012 - 06/30/2013 71004
- FAC INSP POWER UPRATE
1, 2 IP Power Uprate 71004 08/06/2012 08/10/2012 7111111B
- NMP1 ON-SITE RQL INSP W/ P/F RESULTS
1 IP Licensed Operator Requalification Program 7111111B 11/12/2012 11/16/2012 71124
- RAD MONT INSTRUMENTATION
1, 2 IP Radiation Monitoring Instrumentation 71124.05 09/24/2012 09/27/2012 71124
- RAD EFFLUENT MONITOR TREATMENT PI & ISFS
1, 2 IP Operation Of An ISFSI 60855 11/26/2012 11/29/2012 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/26/2012 11/29/2012
IP Occupational Exposure Control Effectiveness 71151-OR01 11/26/2012 11/29/2012
IP RETS/ODCM Radiological Effluent 71151-PR01 11/26/2012 11/29/2012 11/12EXM
- NMP1 INITIAL EXAM
1 FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 04/15/2013 04/19/2013
FY13-NMP1 INITIAL OPERATOR LICENSING EXAM U01861 05/13/2013 05/24/2013 71124
- RAD HAZARD ACCESS/ALARA
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/25/2013 02/28/2013
IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 02/28/2013 71124
- HP INSPECTION IP 71124.01,.02,.03 &.04
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/01/2013 04/04/2013
IP Occupational ALARA Planning and Controls 71124.02 04/01/2013 04/04/2013
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/01/2013 04/04/2013
IP Occupational Dose Assessment 71124.04 04/01/2013 04/04/2013 7111108G
- U1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 04/08/2013 04/12/2013 71124
- RAD ENVIRONMENTAL MONITORING PROGRAM
1 IP Radiological Environmental Monitoring Program 71124.07 05/05/2013 05/10/2013 EP EX
- EP EXERCISE EVALUATION
1, 2 IP Exercise Evaluation 7111401 06/17/2013 06/21/2013 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 06/17/2013 06/21/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.