IR 05000440/2002001

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter - Perry Nuclear Power Plant (Report 50-440/2002-01)
ML020700407
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/04/2002
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To: Campbell G
FirstEnergy Nuclear Operating Co
References
IR-02-001
Download: ML020700407 (5)


Text

rch 4, 2002

SUBJECT:

ANNUAL ASSESSMENT LETTER - PERRY NUCLEAR POWER PLANT (REPORT 50-440/2002-01)

Dear Mr. Campbell:

On January 31, 2002, the NRC staff completed its end-of-cycle plant performance assessment of the Perry Nuclear Power Plant. The end-of-cycle review for Perry involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from April 1, 2001, to December 31, 2001. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities. On April 3, 2002, we plan to discuss this assessment with you and your staff. This meeting will be open for public observation.

As discussed in our previous annual assessment letter dated May 31, 2001, this inspection and assessment cycle consisted of three quarters (i.e., the second, third, and fourth quarters of calendar year 2001) instead of the usual four quarters. This change was implemented in order to align the inspection and assessment cycle with the calendar year beginning on January 1, 2002.

Overall, Perry operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as the first two quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2003.

The enclosed inspection plan details the inspections scheduled through March 31, 2003. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The last 6 months of the inspection plan are tentative and may be revised at the Mid-Cycle Review meeting. In addition to the baseline inspection program, the NRC issued safeguards advisories recommending that nuclear power plant licensees go to the highest level of security immediately following the terrorist attacks on the World Trade Center and the Pentagon, and all promptly did so. With continued uncertainty about the possibility of additional terrorist activities, the Nation's nuclear power plants, including Perry Nuclear Power Plant, remain at a high level of security. On February 25, 2002, the NRC issued an Order to all nuclear power plant licensees, requiring them to take certain additional interim compensatory measures to address the generalized high-level threat environment. These additional compensatory requirements will provide the NRC with reasonable assurance that public health and safety and the common defense and security continue to be adequately protected in the current generalized high-level threat environment. These requirements will remain in effect pending notification from the Commission that a significant change in the threat environment occurs, or until the Commission determines that other changes are needed following a more comprehensive re-evaluation of current safeguards and security programs. To date, we have monitored Perry Nuclear Power Plant actions in response to the terrorist attacks through a series of audits. With the issuance of the Order, we will evaluate Perry Nuclear Power Plant's compliance with these interim requirements.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Christine A. Lipa, Chief Projects Branch 4 Division of Reactor Projects, Region III Docket No. 50-440 License No. NPF-58 Enclosure: Perry Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\EOC Ltrs\2002\Per-eoc02.wpd To receive a copy of this document, indicate in the box "C" = Copy without attach/encl "E" = Copy with attach/encl

"N" = No copy OFFICE RIII RIII NAME Collins/co CLipa DATE 02/ /02 02/ /02

OFFICIAL RECORD COPY cc w/encl: B. Saunders, President - FENOC T. Rausch, Director, Nuclear Maintenance Department G. Dunn, Manager, Regulatory Affairs K. Ostrowski, Director, Nuclear Services Department J. Powers, Director, Nuclear Engineering Department W. Kanda, General Manager, Nuclear Power Plant Department Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health ADAMS Distribution:

AJM DFT H. Nieh, OEDO T. Boyce, NRR Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Perry DRPIII DRSIII PLB1 JRK1 BAH3

Page 1 of 2 Perry 03/08/2002 06:52:13 Inspection / Activity Plan Report 22 03/04/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type FY 2002 - PERRY INIT EXAM 03/2002 3 1 W90059 OL - INITIAL EXAM - PERRY - FEB/MAR 2002 03/04/2002 03/15/2002 Not Applicable IP 71114 - BIENNIAL EP EXERCISE INSP 3 1 IP 7111401 Exercise Evaluation 04/08/2002 04/12/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/08/2002 04/12/2002 Baseline Inspections 71121 - REMP INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 05/13/2002 05/17/2002 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 05/13/2002 05/17/2002 Baseline Inspections SSDI - SAFETY SYSTEM DESIGN 6 1 IP 7111121 Safety System Design and Performance Capability 06/10/2002 06/28/2002 Baseline Inspections IP 71122 - RADIOACTIVE LIQ/GAS EFF INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 07/08/2002 07/12/2002 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 07/08/2002 07/12/2002 Baseline Inspections HTSINK B - BIENNIAL HEAT SINK 1 1 IP 7111107B Heat Sink Performance 07/29/2002 08/02/2002 Baseline Inspections MAINT B - BIENNIAL MAINTENANCE RULE 1 1 IP 7111112B Maintenance Rule Implementation 08/05/2002 08/09/2002 Baseline Inspections IP 71121 - RP INSTRUMENTATION INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/07/2002 10/11/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 10/07/2002 10/11/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/07/2002 10/11/2002 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1 IP 7111111B Licensed Operator Requalification 10/21/2002 10/25/2002 Baseline Inspections IP 71121 - OCCUPATIONAL RAD SAFETY INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/02/2002 12/06/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 12/02/2002 12/06/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 12/02/2002 12/06/2002 Baseline Inspections FY 2003 - PERRY INIT PREP 12/2002 3 1 W90060 OL - INITIAL EXAM - PERRY - DEC 2002/JAN 2003 01/06/2003 01/10/2003 Not Applicable FY 2003 - PERRY INIT EXAM 01/2003 3 1 W90060 OL - INITIAL EXAM - PERRY - DEC 2002/JAN 2003 01/27/2003 02/07/2003 Not Applicable MOD50.59 - BIENNIAL PLANT MOD AND 50.59 4 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/10/2003 02/14/2003 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 02/10/2003 02/14/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Perry 03/08/2002 06:52:13 Inspection / Activity Plan Report 22 03/04/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type IP 71122 - RAD MATERIAL PROC/TRANS INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/10/2003 02/14/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 02/10/2003 02/14/2003 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 02/10/2003 02/14/2003 Baseline Inspections IP 71114 - NON-EXERCISE BASELINE EP INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 03/24/2003 03/28/2003 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 03/24/2003 03/28/2003 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/24/2003 03/28/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/24/2003 03/28/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.