ML20126E685

From kanterella
Revision as of 01:36, 12 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to FOIA Request for Documents Re Emergency Instructions or Procedures & BWR Mark III Emergency Procedure Guidelines.Forwards Documents Listed on App
ML20126E685
Person / Time
Site: Perry, Grand Gulf, River Bend, Clinton, 05000000
Issue date: 03/13/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Hiatt S
OHIO CITIZENS FOR RESPONSIBLE ENERGY
Shared Package
ML18041A119 List:
References
FOIA-85-76 NUDOCS 8506170180
Download: ML20126E685 (2)


Text

~

/

- ,s#g

~ UNITED STATES (M)ll-Ol6

[, g NUCLEAR REGULATORY COMMISSION g  : E WASHINGTON, D. C. 20555 _ ,

'+,

+.....o l NAR 131985 l 1

Ms. Susan Hiatt OCRE Representative IN RESPONSE REFER 8275 Munson Road TO F01A-85-76 Mentor, OH 44060

Dear Ms. Hiatt:

This is in response to your letter dated January 28, 1985, in which you requested, jursuant to the Freedom of Information Act (F0IA), all plant emergency instructions or procedures for the Perry nuclear power plant and the draft or final generic BWR Mark III Emergency Procedure Guidelines concerning containrgent hy.drogen control, maintenance of containment integrity, and containment purge or venting.

Thedocumentslistedontheenclosedappendixareresponsivetoyour request and are enclosed. You will be billed separately by our Division of Accounting and Finance in the amount of $8.65 for the enclosed documents.

The staff has advised me that all other documents subject to your request.

have been provided to you previously as a recipient of records provided to the Perry service list or as a party to the Perry proceedings.

Sin rely, J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated I

' j

/

8506170180 850313 PDR FOIA HIATT85-76 PDR

'l

9 Re: FOIA-85-76 APPENDIX

1. 09/08/81 Letter from T.J. Dente to D.G. Eisenhut Subj: Draft Revision IB to NED0-243/. Emergency Procedure Guidelines, BWR 1 through 6. (Acc. No. 8109220461) (84 pages)
2. 02/05/82 Letter from T.J. Dente to D.G. Eisenhut, Subj:

Schedule for BWR Owners Group Compliance with NUREG-0737. Item II.K.3.18 (Acc. No. 8202180242) (12 paces)

3. 06/08/82 Letter from T.J. Dente to D.G. Eisenhut Subj:

Prepublications Draft Emergency Procedures Guidelines: BWR 1 through 6. Revision 2 (Acc. No. 8206110326) (53 pages)

4. 10/04/82 Letter from T.J. Dente to D.G. Eisenhut, Subj: Errata to BWR Emergency Procedure Guidelines (Acc. No. 8210250181) (13 pages)
5. 12/09/87 ' Memorandum from R.J. Mattson and H.L. Thompson, Jr.

s to D.G. Eisenhut, Subj: Safety Evaluation of Emergency Procedure NED0-24934 June 1982 Guidelines, Revision 2, 4 pages)

6. 12/22/82- Letter from T.J. Dente to D.G. Eisenhut, Subj: BWR Emergency Procedure Guidelines, Revision 3 .

(Prepublication Draft dated 12 .

(Acc. No. 8212300034) (68 page/08/82) s)

7. 8/24/84 Memorandum from H. R. Butler to B. J. Youngblood, subject: " Request for Information Regarding Hydrogen Control for MARK III Containments. (3 pages)
8. 12/19/84 Letter from M. R. Edleman (CEI) to B. J. Youngblood subject: NUREG-0737 - II.E.4.2(6) Concerning Containment Purge Valve Ooerability. (Acc. No. 8412280053)

(257 pages) -

l I

1

, i NOTE: 75% of the fees waived / I h

l

't