ML20217L76819 October 1999Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams18 October 1999Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing ExamsGeneric Fundamentals Examination
ML20217H62318 October 1999Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs
ML20217J43315 October 1999Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited ViolationHigh Radiation Area
ML20217J37515 October 1999Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b)
PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl14 October 1999Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl
ML20217F39014 October 1999Discusses Request That Proprietary Document NEDE-32907P,DRF A22-0084-53, Safety Analysis Rept for Perry NPP 5% Power Uprate, Class III Dtd Sept 1999 Be Withheld.Determined Document Proprietary & Will Be Withheld
ML20217G92014 October 1999Discusses Utils Request for Approval of Quality Assurance Program Changes
PY-CEI-NRR-2435, Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect13 October 1999Responds to NRC Re Violations Noted in Insp Rept 50-440/99-13.Corrective Actions:Ts SRs with Incorrect Descriptions Were Annotated to Ensure That CR Operators Are Aware That ACs Are Effect
ML20217F89113 October 1999Forwards Copy of FEMA Region IV Final Rept for 990623-24, Grand Gulf Nuclear Station Exercise.Rept Indicates No Deficiencies or Areas Requiring Corrective Action Identified During Exercise
U-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)12 October 1999Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)
ML20217C08711 October 1999Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld
U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included8 October 1999Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept IncludedHot Short
Safe Shutdown
Unanalyzed Condition
Reactor Vessel Water Level
Loop seal
High Radiation Area
Half scram
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Tornado Missile
Post Accident Monitoring
Internal Flooding
Enforcement Discretion
Coatings
Temporary Modification
Emergency Lighting
Incorporated by reference
Tornado Generated Missile
Foreign Material Exclusion
Feedwater Controller Failure
Operability Determination
Rod Drop Event
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Scaffolding
Unidentified leakage
Unidentified leak
Exit Sign
Affidavit
U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station7 October 1999Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station
U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld7 October 1999Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld
IR 05000458/19990075 October 1999Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDGLoctite
ML20217B0364 October 1999Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated
ML20216J8894 October 1999Forwards Details of Existing Procedural Guidance & Planned Administrative Controls.Util Respectfully Requests NRC Review & Approval of Changes by 991020.Date Will Permit to Implement Changes & Realize Full Benefit During Refueling
ML20217A7361 October 1999Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs
ML20217A9881 October 1999Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities
ML20217J12530 September 1999Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC
ML20217J14230 September 1999Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC
RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required30 September 1999Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required
ML20212K92730 September 1999Refers to 990927 Meeting Conducted at Perry Nuclear Power Plant to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff
ML20212J14530 September 1999Forwards Order,In Response to 990505 Application PY-CEI/NRR- 2394L.Order Approves Conforming License Amend Which Will Be Issued & Made Effective When Transfer Completed
ML20217E71130 September 1999Documents Telcon Conducted on 990929 Between M Underwood of Oh EPA & D Tizzan of Pnpp,Re Request to Operate Pnpp Sws,As Is,Until Resolution Can Be Obtained
ML20212J81529 September 1999Forwards Insp Rept 50-416/99-12 on 990725-0904.One Violation Noted & Being Treated as Noncited Violation.Licensee Conduct of Activities at Grand Gulf Facility Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices
ML20212J73628 September 1999Forwards Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted.Purpose of Insp to Review Solid Radioactive Waste Management & Radioactive Matl Transportation Programs
ML20216J68128 September 1999Ack Receipt of ,Transmitting Rev 31 to Physical Security Plan for GGNS Under Provisions of 10CFR50.54(p). NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness & Limited Review
ML20212J53227 September 1999Forwards Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted.Inspectors Determined That Radioactive Waste Effluent Releases Properly Controlled,Monitored & Quantified
ML20216J81426 September 1999Forwards Proprietary Renewal Applications for Licensed Operators for Wk Gordon & SA Elliott at Grand Gulf Nuclear Station.Proprietary Info Withheld
ML20216J71026 September 1999Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator License ExaminationsGeneric Fundamentals Examination
RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl24 September 1999Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,EnclLoctite
ML20212G41624 September 1999Informs of Completion of Licensing Action for Generic Ltr 98-01, Y2K Readiness of Computer Systems at Nuclear Power Plants, for Perry Nuclear Power Plant
ML20212G58123 September 1999Informs That Licenses for Ta Lentz,License SOP-31449,PJ Arthur,License SOP-30921-1 & Dp Mott,License SOP-31500 Are Considered to Have Expired,Iaw 10CFR50.74(a),10CFR55.5 & 10CFR55.55
ML20212F55223 September 1999Forwards SER Accepting Util Analytical Approach for Ampacity Derating Determinations at Grand Gulf Nuclear Station,Unit 1 & That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 NotedFire Barrier
RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-4723 September 1999Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47
ML20212G67522 September 1999Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station
U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl22 September 1999Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl
PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams21 September 1999Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing ExamsGeneric Fundamentals Examination
RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp21 September 1999Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional InspFire Protection Program
ML20212G69820 September 1999Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability
U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl20 September 1999Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl
ML20217H34217 September 1999Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr
PY-CEI-NRR-2428, Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions16 September 1999Submits Resolution to Seventh Question Proposed within NRC 980615 RAI Relating to Cooling Water Sys That Serve Containment Air Coolers & Assessment,Post Accident,Of Potential Water Hammer & two-phase Flow Conditions
ML20212D89016 September 1999Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM
ML20212D92116 September 1999Informs That NRC Staff Completed Midcycle PPR of GGNS on 990818 & Identified No Areas in Which Licensee Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through March 2000 Encl
ML20216F78815 September 1999Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities
ML20212D01514 September 1999Requests Cancellation of NPDES Permit 3II00036.Permit Has Been Incorporated in Permit 3IB00016*ED.Discharge Point Sources & Associated Fees Currently Covered Under Permit 3IB00016*ED
ML20212A83713 September 1999Forwards Insp Rept 50-440/99-13 on 990712-30 & Notice of Violation.Insp Included Evaluation of Engineering Support, Design Change & Modification Activities,Internal Assessment Activities & Corrective Actions