ML20129D746

From kanterella
Revision as of 19:15, 6 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-382/96-21 on 960826-0912.No Violations Noted.Staff Performed Thorough Review & Assessment Into Root Cause for Excessive Leakage Past Normal Intake Dampers for CR Ventilation
ML20129D746
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/23/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Sellman M
ENTERGY OPERATIONS, INC.
Shared Package
ML20129D749 List:
References
NUDOCS 9609300179
Download: ML20129D746 (4)


See also: IR 05000382/1996021

Text

L

  • s

t 4M4 UNITED STATES  !

., 9'S NUCLEAR REGULATORY COMMISSION

REGloN IV

  • t

D

g 611 RYAN PLAZA drive.SulTE 400

,

4'+, ,o AR LINGToN, TEXAS 760118064

September 23, 1996

i

!

1

Michael B. Sellman, Vice President j

' Operations - Waterford i

.

Entergy Operations, Inc.

P.O. Box B

Killona, Louislanc 70066

SUBJECT: NRC INSPECTION REPORT 50-382/96-21

Dear Mr. Sellman:

An NRC inspection was conducted August 26 through Setember 12,1996, at your

Waterford Steam Electric Station, Unit 3 reactor facility. T he enclosed report presents the

scope and results of that inspection.

During this inspection, the inspector determined that your sttf performed a thorough

review and assessment into the root cause for excessive leakage past the normal intake

dampers for the control room ventilation.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss

them_ with you.

Sincerely,

h

J. E. Dyer, Director

Division of Reactor Projects

Docket No.: 50-382

License No.: NPF-38

I

i

Enclosure:

NRC Inspection Report

50-382/96-21

1

9609300179 960923

PDR ADOCK 05000382 '

i

G . DR  !

1

.

f

.

.

Entergy Operations, Inc. -2-

<

cc w/ enclosures: ,

i

Executive Vice President and

Chief Operating Officer.

Entergy Operations, Inc.

P.O. Box 31995

'

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

l

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations l

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager - Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director Nuclear Safety

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Administrator

Loulslana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

J

,

.

.

%

Entergy Operations, Inc. -3-

I

Parish President

St. Charles Parish

P.O. Box 302 - i

Hahriville, Louisiana 70057 ,

i

Mr. William A. Cross

.

i

1

Bethesda Licensing Office l

3 Metro Center

Suite 610

Bethesda, Maryland 20814 )

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. - 20005-3502

l

4

I

]

_. _ -.

-_

-

...

Entergy Operations, Inc. -4-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)  !

bec to DMB (lE01)-

bec distrib. by RIV:

L. J. Callan Resident inspector j

DRP Director DRS-PSB  ;

Branch Chief (DRP/D) MIS System

Project Engineer (DRP/D) RIV File

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: T-9E10)

l

1

1

DOCUMENT NAME: R:\_WAT\WT621 RP. GAP

To receive copy of document, indicate in box: "C" = Copy without tppfosures "E" = Copy with enclosures "N" = No copy

PE:DRP/D A( _ C:DRP/D . [], _ D:DRP / /

GAPick;cm WT ~ PHHarrellVQ$ JEDyer N ,!p

09/fpy/96 09/g>/96 69V09/33/96 /

"

OFFIC AL RECORD CDPY

t

270105

1