ML20129D746

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/96-21 on 960826-0912.No Violations Noted.Staff Performed Thorough Review & Assessment Into Root Cause for Excessive Leakage Past Normal Intake Dampers for CR Ventilation
ML20129D746
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/23/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Sellman M
ENTERGY OPERATIONS, INC.
Shared Package
ML20129D749 List:
References
NUDOCS 9609300179
Download: ML20129D746 (4)


See also: IR 05000382/1996021

Text

L

s

4M4

UNITED STATES

t

9'S

NUCLEAR REGULATORY COMMISSION

.,

REGloN IV

t

D

g

611 RYAN PLAZA drive.SulTE 400

4'+,

,o

AR LINGToN, TEXAS 760118064

,

September 23, 1996

i

Michael B. Sellman, Vice President

j

' Operations - Waterford

i

Entergy Operations, Inc.

.

P.O. Box B

Killona, Louislanc 70066

SUBJECT: NRC INSPECTION REPORT 50-382/96-21

Dear Mr. Sellman:

An NRC inspection was conducted August 26 through Setember 12,1996, at your

Waterford Steam Electric Station, Unit 3 reactor facility. T he enclosed report presents the

scope and results of that inspection.

During this inspection, the inspector determined that your sttf performed a thorough

review and assessment into the root cause for excessive leakage past the normal intake

dampers for the control room ventilation.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss

them_ with you.

Sincerely,

h

J. E. Dyer, Director

Division of Reactor Projects

Docket No.: 50-382

License No.: NPF-38

i

Enclosure:

NRC Inspection Report

50-382/96-21

1

9609300179 960923

PDR

ADOCK 05000382

i

. DR

G

'

1

.

f

.

.

Entergy Operations, Inc.

-2-

<

cc w/ enclosures:

,

i

Executive Vice President and

Chief Operating Officer.

Entergy Operations, Inc.

P.O. Box 31995

'

Jackson, Mississippi 39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Manager - Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director Nuclear Safety

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Administrator

Loulslana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

J

,

.

.

%

Entergy Operations, Inc.

-3-

I

Parish President

St. Charles Parish

P.O. Box 302 -

i

Hahriville, Louisiana 70057

i

,

Mr. William A. Cross

i

.

Bethesda Licensing Office

3 Metro Center

Suite 610

Bethesda, Maryland 20814

)

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. - 20005-3502

4

I

]

_. _

-.

-_

...

-

Entergy Operations, Inc.

-4-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bec to DMB (lE01)-

bec distrib. by RIV:

L. J. Callan

Resident inspector

j

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: T-9E10)

1

1

DOCUMENT NAME: R:\\_WAT\\WT621 RP. GAP

To receive copy of document, indicate in box: "C" = Copy without tppfosures

"E" = Copy with enclosures "N" = No copy

PE:DRP/D A(

_

C:DRP/D . [], _

D:DRP

/ /

GAPick;cm WT ~

PHHarrellVQ$ JEDyer N ,!p

09/fp /96

09/g>/96 69V09/33/96

/

y

"

OFFIC AL RECORD CDPY

t

270105

1