Category:INSPECTION REPORT
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20137W7811997-04-14014 April 1997 Insp Rept 50-354/97-01 on 970202-0317.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint, & Plant Support ML20135A3901997-02-21021 February 1997 Insp Rept 50-354/96-11 on 961222-970201.Violation Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19960101997-01-27027 January 1997 Insp Rept 50-354/96-10 on 961110-1221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Security Program Plan IR 05000354/19960091996-12-0505 December 1996 Insp Rept 50-354/96-09 on 960922-1109.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129D0891996-10-18018 October 1996 Insp Rept 50-354/96-07 on 960804-0921.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19950151996-02-14014 February 1996 Insp Rept 50-354/95-15 on 950905-1109.No Violations Noted. Major Areas inspected:safety-related Reactor Vessel Water Level Mod,Corrective Actons for Digital Feedwater Control Sys & RCIC Jockey Pump Corrective Action Process ML20084L7691995-05-30030 May 1995 Insp Rept 50-354/95-05 on 950406-21.No Violations Noted. Major Areas Inspected:Licensee Actions & Evaluations Associated W/Unplanned Release of Radioactive Matl from Hope Creek South Plant Vent That Occurred on 950405 IR 05000354/19930231993-12-15015 December 1993 Insp Rept 50-354/93-23 on 931004-1103.No Violations Noted. Major Areas Inspected:Review Licensee Corrective Actions of Previously Identified Edsfi Findings IR 05000354/19920191992-12-15015 December 1992 Insp Rept 50-354/92-19 on 921104-10.No Violations Noted. Major Areas Inspected:Licensees C/A for Mechanical Snubbers That Failed Functional Test & to Verify That Failed Snubbers Have Been Replaced or Restored to as-designed Condition IR 05000354/19910131991-06-21021 June 1991 Insp Rept 50-354/91-13 on 910520-24.No Violations Noted. Major Areas Inspected:Review of Several Open Items Remaining from Maint Team Insp 50-354/89-80 & Surveillance Test & Implementation IR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880201988-10-24024 October 1988 IR 50-354/88-20 on 880906-16.No Violations Noted. Major Areas Inspected:Verification That Emergency Operating Procedures Technically Adequate IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality 1999-08-11
[Table view] Category:UTILITY
MONTHYEARIR 05000354/19900131990-07-26026 July 1990 Insp Rept 50-354/90-13 on 900618-22.No Violations Noted. Major Areas Inspected:Svc Water Intake Structure & Licensee Actions on Previous Insp Findings Re Svc Water Pipe Leak Examined IR 05000354/19900151990-07-19019 July 1990 Insp Rept 50-354/90-15 on 900625-29.No Violations Noted. Major Areas Inspected:Organization & Staffing,Training & Qualifications of Personnel,Procedures,Audits & Assessments, External & Internal Exposure Controls ML20246C4001989-08-15015 August 1989 Partially Deleted Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14 (Ref 10CFR73.21).Major Areas Inspected:Followup on Actions Taken in Response to Regulatory Effectiveness Review on 890410-14 IR 05000354/19890131989-07-20020 July 1989 Insp Rept 50-354/89-13 on 890626-30.No Violations Noted. Major Areas Inspected:Licensee Compliance to 10CFR50.62 ATWS Rule Pertaining to Alternate Rod Injection Sys IR 05000354/19890111989-07-10010 July 1989 Safety Insp Rept 50-354/89-11 on 890501-0619.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER & Open Item Followup IR 05000354/19890091989-05-10010 May 1989 Safety Insp Rept 50-354/89-09 on 890314-0430.No Violations Noted.Major Areas Inspected:Operations,Radiological Controls,Maint & Surveillance Testing,Emergency Preparedness,Security & LER Followup ML20247B6651989-05-0909 May 1989 Mgt Meeting Rept on 890307 & 0413.Major Areas Discussed: Status of Plant,Training & Safety Programs & Self Assessment Programs IR 05000354/19890021989-03-31031 March 1989 Safety Insp Rept 50-354/89-02 on 890124-0313.Violation Noted.Major Areas Inspected:Operations,Radiological Controls Maint & Surveillance Testing,Emergency Preparedness,Security & Engineering/Technical Support IR 05000354/19890061989-03-29029 March 1989 Insp Rept 50-354/89-06 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy & Implementation of Licensees Fire Protection Program,Combustible Matl Control, Housekeeping Conditons & Fire Brigade Training IR 05000354/19890051989-03-23023 March 1989 Insp Rept 50-354/89-05 on 890227-0303.No Violations Noted. Major Areas Inspected:Adequacy,Implementation & Effectiveness of Radiological Controls Program During mid-cycle Outage,Organization,Training & Staffing IR 05000354/19890031989-02-28028 February 1989 Insp Rept 50-354/89-03 on 890206-10.No Violations Noted. Major Areas Inspected:Licensee Inservice Insp Activities to Ascertain That Inservice Insp Activities Conducted Per ASME Code & Regulatory Requirements IR 05000354/19880231988-11-0101 November 1988 Safety Insp Rept 50-354/88-23 on 880830-1011.Major Areas Inspected:Operations,Radiological Controls,Surveillance Testing,Maint,Emergency Preparedness,Security,Ler & Engineering/Technical Support IR 05000354/19880221988-09-15015 September 1988 Insp Rept 50-354/88-22 on 880712-0829.Violation Noted.Major Areas Inspected:Operations,Radiological Controls, Surveillance Testing,Maint,Emergency Preparedness,Security, Engineering/Technical Support & LER & Open Item Followup IR 05000298/19880191988-08-0303 August 1988 Insp Rept 50-298/88-19 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nonlicensed Staff Training,Qa Annual Review (Procurement,Receipt Insp & Audits) & Licensee Actions on Previous Concerns IR 05000354/19880181988-07-26026 July 1988 Insp Rept 50-354/88-18 on 880601-0711.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Ler Followup & Assurance of Quality IR 05000354/19880161988-07-0606 July 1988 Insp Rept 50-354/88-16 on 880426-0531.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Esf Sys Walkdown,Ler Followup,Emergency Preparedness & Assurance of Quality IR 05000354/19880101988-06-21021 June 1988 Insp Rept 50-354/88-10 on 880404-08.No Violations Noted. Major Areas Inspected:Review of Previously Identified Unresolved Items & Maint Outage Mgt That Encompassed Observations of Limitorque Valve Operator Insp IR 05000354/19880141988-06-20020 June 1988 Insp Rept 50-354/88-14 on 880418-22.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Processing,Preparation,Packaging & Shipping Program, Including Previously Identified Items ML20196J0671988-06-17017 June 1988 Enforcement Conference Rept 50-354/88-20 on 880609.Major Areas Inspected:Dept of Labor Determination That Contractor Bogan Discriminated Against Employee for Raising Safety Concerns.Agenda & Supporting Info Encl IR 05000354/19880171988-06-0202 June 1988 Insp Rept 50-354/88-17 on 880509-13.No Violations Noted. Major Areas Inspected:Licensee Effluent Controls,Liquid Effluent,Gaseous Effluent,Effluent Monitor Calibr, Ventilation Sys & Offsite Dose Calculation Manual IR 05000354/19880151988-06-0202 June 1988 Insp Rept 50-354/88-15 on 880418-22.No Violations or Deviations Noted.Major Areas Inspected:Startup Test Program Following First Refueling,Including Review of Startup Test Procedures & Test Results Evaluation IR 05000354/19880091988-05-24024 May 1988 Insp Rept 50-354/88-09 on 880322-0425.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Surveillance Testing,Maint Activities,Review of Maint Program,Esf Sys Walkdown & Assurance of Quality ML20197E2951988-05-19019 May 1988 Insp Rept 50-354/88-11 on 880321-25.No Violations or Deviations Noted.Major Areas Inspected:Review of Licensee Action in Response to Mark I Containment Mod Requirements of NUREG-0661 IR 05000354/19880081988-04-20020 April 1988 Insp Rept 50-354/88-08 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Local Leak Rate Testing of Containment Isolation Boundaries & Implementation of Inservice Test Program for Pumps & Valves IR 05000354/19880061988-04-20020 April 1988 Insp Rept 50-354/88-06 on 880229-0303.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Organization & Staffing,Communications,Audits,Alara & High Radiation Area Access Control IR 05000354/19880131988-04-14014 April 1988 Insp Rept 50-354/88-13 on 880328-29.No Violations Noted. Major Areas Inspected:Inservice Insp Activities to Ascertain Whether Licensee Activities Conducted in Compliance W/ Applicable ASME Code & Regulatory Requirements ML20151W1711988-04-0909 April 1988 Insp Rept 50-354/88-03 on 880126-29.Violation Noted.Major Areas Inspected:Licensee Environ Qualification Program & Licensee Response & Resolutions to Equipment Concerns Identified in SER IR 05000354/19880051988-04-0404 April 1988 Onsite Resident Insp Rept 50-354/88-05 on 880209-0321. Violation Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Testing,Maint Activities,Reactor Coolant Spill in Torus Basement & Assurance of Quality IR 05000272/19880061988-03-18018 March 1988 Partially Withheld Physical Security Insp Repts 50-272/88-06,50-311/88-06 & 50-354/88-04 on 880201-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Procedures,Security Organization & Mgt Effectiveness IR 05000354/19880011988-03-0404 March 1988 Insp Rept 50-354/88-01 on 880105-0208.Violation Noted.Major Areas Inspected:Followup of Outstanding Insp Items, Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown,Lers & Design Change Packages IR 05000354/19870271987-12-31031 December 1987 Radiological Controls Insp Rept 50-354/87-27 on 871116-18 & 20.No Violations Noted.Major Areas Inspected:Process & Area Radiation Monitor Surveillance Testing,Sealed Sources, Radiological Controls for New Fuel Receipt & Insp & ALARA IR 05000354/19870281987-12-21021 December 1987 Insp Rept 50-354/87-28 on 871116-20.No Violation Noted.Major Areas Inspected:Radiochemical Measurements Program, Confirmatory Measurements,Audits & Boron Analysis IR 05000354/19870251987-11-25025 November 1987 Insp Rept 50-354/87-25 on 870921-25.No Violations Noted. Major Areas Inspected:Organization & Staffing,Mgt Oversight, Training & Qualification,External Exposure Controls,Alara, Internal Exposure Controls & High Radiation Area Controls IR 05000354/19870201987-11-0303 November 1987 Emergency Preparedness Insp Rept 50-354/87-20 on 870908-10. No Violations Noted.Major Areas Inspected:Observation of Licensee Full Participation,Emergency Exercise Conducted on 870909 & Insp of Training Records ML20235T8501987-10-0101 October 1987 Insp Rept 50-354/87-17 on 870714-0817.Violation Noted.Major Areas Inspected:Followup on Outstanding Insp Items,Maint Activities,Operational Safety Verification,Surveillance Testing,Esf Sys Walkdown & Instrument Calibr Data Cards IR 05000354/19870191987-10-0101 October 1987 Insp Rept 50-354/87-19 on 870727-30.No Violations Noted. Major Areas Inspected:Licensee Action on Previous NRC Findings,Organization & Staffing,Audits & External Exposure Control IR 05000354/19870211987-09-0404 September 1987 Insp Rept 50-354/87-21 on 870817-21.No Violations or Deviations Noted.Major Areas Inspected:Licensee Program for Resolving QA Action Requests IR 05000354/19870161987-07-20020 July 1987 Insp Rept 50-354/87-16 on 870609-0713.Violations Noted. Major Areas Inspected:Followup on Outstanding Insp Items, Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown & LER Followup IR 05000354/19870141987-07-0606 July 1987 Insp Rept 50-354/87-14 on 870512-0608.Deviation Noted.Major Areas Inspected:Outstanding Insp Items,Operational Safety Verification,Surveillance Testing,Maint Activities,Esf Sys Walkdown & LER Followup IR 05000354/19870131987-06-0101 June 1987 Insp Rept 50-354/87-13 on 870504-06 & 12.No Violations Noted.Major Areas Inspected:Licensee Activities in Areas of Surveillance Testing,Procedures & Records IR 05000354/19870111987-05-28028 May 1987 Insp Rept 50-354/87-11 on 870414-0511.Major Areas Inspected: Followup on Outstanding Insp Items,Operational Safety Verification & Security Insp.Addl Mgt Attention Needed in Housekeeping Area to Ensure Cleanliness Stds Maintained IR 05000354/19870101987-04-0707 April 1987 Insp Rept 50-354/87-10 on 870316-20.No Violations Noted. Major Areas inspected:post-accident Monitoring Sys Conformance W/Rev 2 to Reg Guide 1.97.Open Item Identified Re Identification of Category 2 Equipment IR 05000354/19870071987-04-0303 April 1987 Insp Rept 50-354/87-07 on 870309-13.Unresolved Items Re Evaluation of Offgas Delay Time & Determination of Dose & Dose Commitments & Continuing Problems W/Licensee Process & Effluent Monitors Noted IR 05000354/19870061987-03-23023 March 1987 Insp Rept 50-354/87-06 on 870224-26.No Violations Noted. Major Areas Inspected:Power Ascension Test Program,Plateau Review,Test Results Evaluation,Outstanding Results Deficiencies,Qa Interface & Independent Measurements IR 05000354/19870031987-03-23023 March 1987 Insp Rept 50-354/87-03 on 870209-13.No Violations,Deviations or Unresolved Items Noted.Major Areas Inspected:Emergency Preparedness Program IR 05000354/19870051987-03-20020 March 1987 Insp Rept 50-354/87-05 on 870210-0309.Violation Noted: Failure to Obtain & Analyze Grab Samples of Cooling Tower Blowdown Line.Unresolved Item Noted Re Environ Qualification of MSIV Terminal Boxes IR 05000354/19870011987-03-0404 March 1987 Insp Rept 50-354/87-01 on 870101-0209.Violation Noted: Failure to Obtain & Analyze Grab Samples Per Drywell Leak Detection Action Statement IR 05000354/19870041987-03-0404 March 1987 Insp Rept 50-354/87-04 on 870127-30.No Violations Noted. Major Areas Inspected:Nonradiological Chemistry Program, Including Measurement Control & Analytical Procedure Evaluations IR 05000354/19870021987-02-0606 February 1987 Safety Insp Rept 50-354/87-02 on 870112-16.Violations Noted: Failure to Properly Identify & Quantify Fe-59 & Zr-95 in Shipment 86-04,Details 6.1 & 6.4 & Incorrect Certification for Shipment 86-04,Detail 6.1 IR 05000354/19860601987-02-0505 February 1987 Physical Security Insp Rept 50-354/86-60 on 861230.No Violation Noted.Major Areas Inspected:Review of Licensee Program for Conducting Contingency Drills to Evaluate Effectiveness & Impact of Drills During Security Activities 1990-07-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000354/19983021999-10-13013 October 1999 Suppl NRC Operator Licensing Exam Rept 50-354/98-302 on 991025-29 (NRC Onsite Review),Mgt Meeting on 990322, in-office Reviews on 990429-30 & 0617-18 & Telephone Call on Appeal Results on 990720 IR 05000354/19990051999-10-0101 October 1999 Insp Rept 50-354/99-05 on 990711-0829.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Mitigating Sys,Barrier Integrity & Performance Indicator Verification PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power1999-09-16016 September 1999 PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power IR 05000354/19990041999-08-11011 August 1999 Insp Rept 50-354/99-04 on 990530-0711.No Violations Noted. Major Areas inspected:cornerstone-mitigating Sys,Pi Verification IR 05000354/19990031999-06-21021 June 1999 Insp Rept 50-354/99-03 on 990419-0529.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19990021999-05-14014 May 1999 Insp Rept 50-354/99-02 on 990308-0418.Non-cited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000354/19990011999-04-19019 April 1999 Insp Rept 50-354/99-01 on 990124-0307.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000354/19980111998-12-22022 December 1998 Insp Rept 50-354/98-11 on 981101-1212.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20196D0911998-11-23023 November 1998 Notice of Violation from Insp on 980920-1031.Violation Noted:On 981001,electricians Placed Single Degraded Cell Associated with Operable 1E Battery Bank on Single Cell Charge IR 05000354/19980101998-11-23023 November 1998 Insp Rept 50-354/98-10 on 980920-1031.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering PNO-I-98-053, on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie1998-11-16016 November 1998 PNO-I-98-053:on 981115,plant Experienced Turbine Trip While Operating at 95% Power Due to High Level Condition on One of Two Moisture Separators.Reactor Automatically Shut Down.Util Evaluating Incorrect Sys Drawing.States of Nj & DE Notifie ML20154Q7381998-10-16016 October 1998 Second Suppl to NRC Exam Rept 50-354/98-03OL for Tests Administered on 980304-12,0519-21,22-28 & 0629.Five of Five Reactor Operator Applicants & Four of Five Senior Reactor Applicants Passed Exams ML20154J8611998-10-0909 October 1998 Notice of Violation from Insp on 980809-0919.Violation Noted:On 980831,licensee Did Not Promptly Correct Condition Adverse to Quality in That 'C' Residual Heat Removal Pump Rendered Inoperable IR 05000354/19980081998-10-0909 October 1998 Insp Rept 50-354/98-08 on 980809-1019.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980091998-10-0202 October 1998 Insp Rept 50-354/98-09 on 980817-26 & 0908.No Violations Noted.Major Areas Inspected:Maint & Engineering IR 05000354/19983011998-09-0404 September 1998 Exam Rept 50-354/98-301OL Conducted on 980810-12.Exam Results:Four SRO Candidates Performed Well on Both Written & Operating Portions of Exam.All Four Were Issued Licenses ML20237E4981998-08-25025 August 1998 Notice of Violation from Insp on 980628-0808.Violation Noted:As of 980810,util Had Not Corrected Known Deficiency in Verifying MSIV Full Closed During Springs Only Full Stroke Closing Tests IR 05000354/19980071998-08-25025 August 1998 Insp Rept 50-354/98-07 on 980628-0808.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000354/19980061998-07-21021 July 1998 Insp Rept 50-354/98-06 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236T1601998-07-21021 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:As of Oct 1997,chemistry Technicians Did Not Sample & Analyze Diesel Fuel Oil Deliveries for Particulates & Did Not Report Results by Written Notification within 14 Days IR 05000272/19982021998-07-0909 July 1998 Partially Deleted Insp Repts 50-272/98-202,50-311/98-202 & 50-354/98-202 on 980420-23.No Violations Noted.Major Areas Inspected:Conduct of Security & Safeguards Activities IR 05000354/19980031998-06-16016 June 1998 Suppl to NRC Licensing Exam Rept 50-354/98-03OL (Including Completed & Graded Tests) for Tests Administered on 980223- 0304 IR 05000354/19980801998-06-10010 June 1998 Insp Rept 50-354/98-80 on 980223-0319 & 0427-30.Violations Noted.Major Areas Inspected:Maint & Engineering ML20249A2031998-06-10010 June 1998 Notice of Violation from Insp on 980223-0319 & 0427-30. Violation Noted:Conditions Adverse to Quality Were Not Promptly Identified & Corrected IR 05000354/19980991998-06-0808 June 1998 SALP Rept 50-354/98-99 for Period of 961110-980516 ML20249A1071998-06-0404 June 1998 Notice of Violation from Insp on 980405-0516.Violation Noted:During Refueling Outage RF03 in Dec 1990 Licensee Did Not Maintain RHR Sys in Operation IR 05000354/19980051998-06-0404 June 1998 Insp Rept 50-354/98-05 on 980405-0516.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M0491998-04-28028 April 1998 NRC Operator Licensing Exam Rept 50-354/98-03OL,(including Completed & Graded Tests) for Tests Administered on 980223-0304 ML20217N6221998-04-24024 April 1998 Notice of Violation from Investigation Conducted by Oi. Violation Noted:Safeguard Event Log,Required to Be Maintained by Licensee,Was Not Complete & Accurate in All Matl Aspects IR 05000354/19980021998-04-23023 April 1998 Insp Rept 50-354/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint,Plant Support & Effectiveness of Fire Protection Program ML20217H8051998-04-23023 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Three Examples of Inadequate Accomplishment of Procedure Control Associated W/Temporary Equipment Installed in Plant Svc Water Intake Structure ML20217C6711998-03-20020 March 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:On 971112,while Reactor Was in Cold Shutdown W/Rv Head Removed,Operators Did Not Verify That CR Position Did Not Change During Withdrawal ML20217D8291998-03-17017 March 1998 EN-98-013:informs That NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 Will Be Issued on or About 980330 to Pse&G.Civil Penalty Based on Violation Involving Failure by Operating Crew to Follow Procedures IR 05000354/19980011998-03-16016 March 1998 Insp Rept 50-354/98-01 on 980104-0221.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199L4791998-02-0303 February 1998 Notice of Violation from Insp on 971126-980103.Violation Noted:On 971124,maint Technicians Failed to Follow HC.IC-DC.ZZ-0140(Q),Rev 3, Device/Equipment Calibration Masonleilan Pressure & Temperature Controllers ML20199L5321998-02-0303 February 1998 Insp Rept 50-354/97-10 on 971116-980103.Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20197D2111997-12-10010 December 1997 Insp Rept 50-354/97-09 on 971005-1115.Apparent Violation Being Considered for Escalated Ea.Major Areas Inspected: Licensee Operations,Engineering,Maint,Plant Support & Site Security Programs ML20199D3431997-11-13013 November 1997 Insp Rept 50-354/97-07 on 970824-1004.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20199D3171997-11-12012 November 1997 Notice of Violation from Insp on 970824-1004.Violation Noted:On 970914,electric motor-driven Fire Pump Supply Breaker Opened During Electrical Bus Swap Which Rendered Pump Inoperable ML20196J6531997-10-20020 October 1997 Notice of Violation from Insp on 970202 & 0317.Violation Noted:In Apr 1994,licensee Made Changes to Facility That Involved USQ Without Prior Commission Approval ML20198L9531997-10-15015 October 1997 NRC Operator Licensing Exam Rept 50-354/97-08OL for Tests Administered on 970929-1002.Exam Results:Four Candidates Passed All Portions of License Exam.One Candidate Failed Written Exam IR 05000354/19970051997-09-15015 September 1997 Insp Rept 50-354/97-05 on 970713-0823.Noncited Violations Identified.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000354/19970061997-09-0404 September 1997 Insp Rept 50-354/97-06 on 961112-970529.Violations Noted. Major Areas Inspected:Engineering ML20210N9061997-08-11011 August 1997 Notice of Violation from Insp on 970601-0712.Violation Noted:Inoperable HPCI Sys Injection Valve Was Not Promptly Identified ML20210N9131997-08-11011 August 1997 Insp Rept 50-354/97-04 on 970601-0712.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20217E7851997-07-25025 July 1997 Investigation Rept 1-96-024 on 970725.No Noncompliance Noted.Major Areas Investigated:Allegations Re Failure to Make 10CFR73.71 Notification by Station Security Dept ML20140J3811997-06-12012 June 1997 Notice of Violation from Insp on 970429-0531.Violation Noted:Failing to Adhere to Established Procedural Guidance for safety-related Activities Were Identified,Significant Condition Adverse to Quality ML20140J3871997-06-12012 June 1997 Insp Rept 50-354/97-03 on 970429-0531.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20148D2301997-05-23023 May 1997 Insp Rept 50-354/97-02 on 970318-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Routine Insp of Physical Protection & Security Program Also Conducted ML20148D2011997-05-23023 May 1997 Notice of Violation from Insp on 970318-0428.Violation Noted:On 970423,operators Failed to Shut Six of Twelve Cylinder Indicator Test Cocks Following Completion of C Emergency Diesel Generator pre-start Checks 1999-09-16
[Table view] |
Text
.
.
.
,
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
- Report N /85-51
' Docket N License No. CPPR-120 Priority -
Category B Licensee: Public Service Electric and Gas Company 80 Park Plaza Newark, New Jersey 07101 Facility Name: Hope Creek Generating Station, Unit 1 Inspection At: Hancocks Bridge, New Jersey Inspection Conducted: October 21 - 25, 1985 Inspectors: , /v 3 L. Cheung, Reactor Engineer date
//). tu V)
M. Schaeffer, Reactor Engineer date Approved by: <
-
< /
C. J. Anderson / Chief, Plant Systems date Section, DRS Inspection Summary:
Inspection Period - October 21-25, 1985 (Inspection Report No. 50-354/85-51)
Areas Inspected: Routine, unannounced inspection by regional based inspectors of licensee work activities and documentation pertaining to the installation of electrical / instrumentation systems, components and associated control circuits. The inspection involved 79 inspector-hours on site by two regional based inspector Results: Two violations: Inadequate design control (one example) and failure to follow instructions, procedures and drawings (one example).
hyljDOCKo309 e51213 C 05000354 PDR
c .
_
.
DETAILS 1.0 Persons Contacted 1.1 'Public Service Electric & Gas C W.-Barbas I&E Techinician J. Bucknan Startup Test Engineer J. DeFabo QA Engineer
R. Donges Lead QA Engineer
J. Duf fy Supervising Engineer
A. Giardino Station QA Manager
R. Griffith Principal QA Engineer R. Hilditch QA Engineer
P. Kudless Maintenance Manager
S. La Brima Assistant General Manager, Hope Creek
M. Lavechia Principal QA Engineer
C. Lambert Supervising Engineer K. Long I&C Technician
M. Metcalf Principal QA Engineer J. Riddlemonser I&C Technician D. Shaffer NSSS I&C Group Leader 1.2 Bechtel Engineering Corporation
R. Bhatia Resident Engineer L. Carey Senior Electrical Engineer
W. Cole Lead Site QA Engineer
W. Goebel QA Engineer
-*
l G. Goldswith Resident Engineer
A. Indico Project Startup Coordinator
D. Long Field Construction Manager
G. Moulton Project QA Engineer
-P. Veer _ Field Engineering 1.3 USNRC
A. Blough Senior Resident Inspector
J. Lyash Resident Inspector
~
Denotes personnel present at exit meetin . 0_ Facility Tour The inspectors observed work activities in progress, completed work and plant status in several areas during a general inspection of the site. The inspector examined work items for obvious defects or noncompliance with ND.C
. . _ . . _ . _ . _ _ __
,
.
-3-requirements or licensee commitment Particular note was taken regarding the presence of quality control inspectors and indications of quality control
-
activities through visual evidence such as inspection records, material identifications, nonconformance and acceptance tags. In addition, the inspector interviewed craft and supervisory personnel encountered in the work area. The only deficiency identified is discussed in Section Item 85-03-0 ,
3.0 Review of Nonconformance Report Records The inspector reviewed a selected sample of 8 nonconformance reports in the instrumentation area to determine whether:
-
The records were legible, complete and promptly reviewed by qualified personnel i -
The records were properly identified, stored, and can be retrieved in a reasonable tim >
-
The reports included proper resolution and adequate justification was provided for accept-as-is dispositio The following nonconformance reports were reviewed:
i NCR #8263 " Flex Hose Bulges" dated August 23, 198 . NCR #7786 " Incorrect Dimensions of Instrument Tubing and Supports" dated May 28, 198 . NCR #7710 " Damaged Threaded Pipe Nipple of Tubing Post Connector on FE-9589A" dated May 23, 198 . NCR #7900 " Modification on Instrument Support #S-45" dated June 19, 198 . NCR #8262 " Insufficient lengths of Flex Legs" dated August 23, 198 NCR #8180 " Damaged threat on Bellows Monitoring Connection for
'
6.
'
I-XJN-ID" dated August 12, 198 . NCR #7967 " Insufficient Channel Separation / Flex Hose Damage" dated July 9, 198 . NCR #7968 " Insufficient Channel Separation" dated July 9,198 ...
.
-4-The QC inspector identified in NCR # 7967 and #7968 that the spatial separ-ations between redundant channel instruments PDT-N086A,B,C,0; N087A,B,C,D; N088A,B,C,0 and N089A,B,C,D were less than three feet. This was in conflict with the Instrument line Separation Criteria for redundant channels stated in Section 8-2 of Bechtel Specification 10855-J-825(Q), Rev.6. The Project Engineering Disposition for these two NCRs was " Project Engineering concurs with Field Engineering use-as-is dispositions. Concurrence is based on a review of the instruments' function and concluded that the instruments serve unrelated and non-redundant functions......"
o These sixteen instruments, however, are used to detect high flow in the main steam lines. They are required to serve related and redundant function Therefore, the licensee did not exercise adequate design control in their disposition of these NCR' '
The licensee was informed that the above is in violation of 10 CFR 50, Appendix B Criterion III " Design Control" which states in part that " Design changes, including field changes, shall be subject to design control mea-sures commensurate with those applied to the original design...".
(354/85-51-01)
4.0 Incorrect Wiring 4.1 Background Instrumentation loop calibrations are performed by the PSE&G start-up group once Bechtel Construction turns the equipment over. Defi-ciencies identified during the calibration phase are documented in Start-up Deviation Reports (SDR) and dispositioned by engineering, which is consistent with approved procedure On June 26 and July 22, 1985, PSSUG performed the required loop cali-brations for instruments E51-FT-N051 and E51-PT-N050 (RCIC flow and pressure transmitters) which were wired to GE Panel H11-P618. The results of the calibration of these transmitters were successfu Subsequent to the calibration, the transmitters underwent modifica-tion for the installation of moisture intrusion seals in the electri-cal conduit to meet environmental qualification requirements. The -
wires to the transmitters had to be de-terminated and butt-spliced after the seals were installed. As a result of this seal installa-tion, a recalibration of the transmitters was require .2 Event The inspectors witnessed the re-calibration process of the pressure and flow transmitters on October 24, 1985. One inspector witnessed activities at the pressure and flow transmitters, elevation 54' in the reactor building; the other inspector was positioned at the GE Panel H11-P618 where trip units E51-651 and E51-N650 are locate r .
.
-5-These trip units supply power and test signals to the transmitter The GE panel is located on elevation 102' in the relay room. When test signals were initiated from the trip units, the transmitters failed to respond as designe The loop calibration for E51-FT-051 and E51-PT-N050 was terminate .3 Analysis and Conclusions The inspectors reviewed the circuit diagrams, cable termination tickets and QC inspection reports for the transmitters and the trip units, which revealed the following:
--
GE Drawing 791E421AC, Revision 3 dated August 28, 1980 indicated that the wiring connections for transmitters E51-PT-N050 and E51-FT-N051 should be such that:
positive terminal of E51-PT-N050 connected to terminal 5511
- negative terminal of E51-PT-N050 connected to terminal 5512 positive terminal of E51-PT-N051 connected to terminal 5514
- negative terminal of E51-PT-N051 connected to terminal 5515
--
the wiring from flow transmitter E51-FT-N051 to the terminal board (SS) inside GE H11-P618 panel had been reversed, ie.., the wiring on terminals SS-14 and SS-15 (wire colors white and black respec-tively) had been incorrectly terminated on terminals SS-15 and SS-14 respectivel the wiring from pressure transmitter E51-PT-N051 to the terminal board (SS) inside H11-P618 had also been reversed. The wiring on terminals SS-11 and SS-12 (white and black) had been incorrectly terminated on terminals SS-12 and SS-11 respectivel The drawings, termination cards, and QC inspection records agreed
.with the design, however the licensee could not provide explanation on why and when the wiring had been terminated in erro Subsequent to this finding the licensee startup test group generated an SDR and swapped the wiring of terminals SS-14 and SS-15, and the wiring of terminals SS-11 and SS-12, and according to the licensee, the instruments worke The licensee was informed that the above was in violation of 10 CFR 50 Appendix B, Criterion V " Instructions, Procedures, and Drawings" which-states in part that " Activity affecting quality shall be prescribed by documented instructions, procedures, or drawings... and shall be accomplished in accordance with these instructions, procedures or drawings...". (354/85-51-02)
-
.
.
-6-5.0 Record Review of Receipt Inspection and Material Certification The inspector reviewed the receipt inspection records and material certifi-
. cations of a selected sample of two level transmitters (B21-LT-N081A&D)
and four pressure transmitters (B21-PT-N055B,F and -N056B,F) to ascertain whether the receipt inspection documents correspond to the received in-struments, components and associated items. The following records were reviewed:
1) QCIR No. NSSS-132551 dated April 17, 1985 For Rosemount Model
- 1153GB8 PAN 0016 pressure transmitter ) QCIR No. NSSS-130824 dated March 15, 1985 for Rosemount level transmitters part No. 188C7360P00 ) General Electric Field Disposition Instruction No. WTIQ, Rev. O dated October 25, 198 ) GE Product Quality Certification No. AS318 dated April 2, 1985 5) GE Product Quality Certification No. AS338 dated February 20, 198 The inspector noted that the documents reviewed were legible and properly signed and dated. Within the scope of this review, no unacceptable condi-tions were identifie .0 QA Audit Record Reviews
.The inspector reviewed QA audit records on I&E installation and inspection activities performed by Bechtel Construction, Inc. to ascertain whether 1)
the audits were performed in accordance with PSE&G QA manual No. QAI 18-1
" audits by QA-E&C, Hope Creek" Revision II, dated April 10, 1984; 2) the audit reports contained sufficient data to verify that the intended purpose and scope of the audits were achieved; and 3) that audit findings had been reported in sufficient detail to permit a meaningful assessment by those
. responsible for corrective action, final disposition and trendin The following audit reports were review:
Audit Report N Audit Date Findings H-320 April 12 - May 8, 1984 6 noncompliances and 2 observations were identified H-349 March 5 - 14, 1985 No findings u
. . . _ _ __ . .
,
<
-
.
-7-The findings in audit report H-320 were related mostly.to the clarity of Bechtel's instrument installation specification 10855-J-720 (Q). These findings were resolved within a reasonable tim ,
The~ inspector.found that these audit were thorough and were documented in a logical manne Within the' scope of this review, no unacceptable conditions were identifie .0- Instrument Calibration Records and-Test Data Review l The inspector reviewed Hope Creek instrument calibration procedures and a selected sample of calibration records to ascertain whether the records confirmed that calibration and related data were current, controlled and reflect actual conditions and that the calibrations were performed in accordance with approved procedures.
, ' Items' examined for this determination include:
1) PSE&G Procedure No. PSSUG-GTP-2 " General Instrument Calibration Procedure for Field Decries" Revision 4 dated May 6,198 ) .PSE&G Procedure No. PSSUG-GTP-3 " Instrument and Control Function
-
Loop Calibration" Revision 3 dated March 28, 198 ) PSE&G Instrument Calibration Data Instrument Loop #1BCON055B for Instrument BCPTN055BE11, TPR BCC-0329, Revision 4 dated April 23, 198 ) Check list for Instrument Calib-M n ' 1BC-PT-N055BE11 dated-August 18, 1985.
, 5) Initial Device Calibration for Instrument No. 1BC-PISH-N655B-E11-B and 1BC-PISH-N655F-Eaa- ) _ Instrument Calibration Data for 1BC-PISH-N655BE11 Revision 1 dated October 9, 198 ) Instrument Calibration Data for 1BC-PISH-N655F-Ell Revisiott I dated
!
October 9, 198 ) Initial Device Calibration TPR-BCC-0091 for transmitter 1BC-PT-N0568-E11 p dated March 20, 198 ) Instrument Calibration Data for IBC-PT-N056B-E11 Revision 1 dated January 2,'1985.
t-
'
L I;
'
__ -, .. _ _ . . _ . _ _ _ _ _
- - . _ _ . . _ - . . _ _ ___ _ _
.-
.
-8-10) Initial Device Calibration TPR-BCC-0077 for 1BC-PT-N056F-E11 and 1BC-PT-N0568-E11, dated March 20, 198 ) Instrument Calibration Data for 1BC-PT-N050F-E11 Rev. 1, and 1BC-PT-N0568-E11, dated December 11, 198 ) Instrument Calibration Data for 1BC-PT-N055D-E11, Rev. 1 undated (not yet complete).
13) Instrument Calibration Data for 1-SM-CT-N081A-B21 Rev. I undated (not yet complete).
14) Instrument Calibration Data for 1-SM-LT-N0810-821, Rev. 1 undated (not yet complete).
The' inspector found that the instrument calibration records were legible, properly signed and dated and contained sufficient data for verificatio Within scope of this review, no unacceptable conditions were identifie .0 Status of Previously Identified Items (0 pen) 10 CFR 50 Appendix B Criterion V Violation 85-03-01 pertaining to uncapped instrument-tubing (Line No. PBC-V9950A) after disconnecting from the instrument (for testing).
The inspector verified by observation that Instrument line No. PBC-V9989A was properly connected back to the instrument. The inspector also observed additional instrument tubing conditions of numerous instruments in the surrounding areas; no uncapped field run tubing connections were observed after flushin In order to avoid repetition of this violation, the licensee included in section 5.6 of Procedure No PSSUG-GTP-2 Revision 5, dated October 24, 1985, the following:
NOTE:
" Capping'of tubing is preferred at all times; however, it shall be mandatory following acceptance flushing."
The above corrective action is considered acceptable, however, during the facility tour, the ' inspector identified numerous uncapped instrument cali-bration connections on the GE transmitter racks (e.g. H21-P004, P005, P006, P014, P018, P027) in the Reactor Building at Elevation 77'. The affected
._ _ _ _ _ _ _ _
,
.
.
-g-instruments are used to measure reactor water level (e.g. 821-LT-N027,
-N080A,-081A,-N091A,-N091E,-N0402A,-N0402E),reactorpressures(e.g.,
B21-PT-N008, -N090A, -N090E, - N090N, -N0403A, -N0403E, C32-PT-N005, -N008),
and differential pressures (e.g. E11-dPT-N058A, C32-dPT-N004A, -N017).
These connections are isolated from the instrument impulse lines by normally closed instrument valves. However, during calibration the instrument valves are opene Since no provisions were made to prevent dust from entering the lines the NRC's concern is that dust or debris can be accumulated in these connections and may eventually be introduced into the instrument lines during the cali-bration process. The inspector reviewed Hope Creek procedure PSSUG-GPT-2
" General Instrument Calibration Procedure for Field Devices" Rev. 5 dated October 24, 1985. No precautions were provided in the calibration procedure to preclude intrusion of accumulated dust or debri This item remains open pending licensee's corrective actions to prevent dust or debris intrusion into the instrument impulse line (Closed) CDR 84-00-04 General Electric HEA Relay Trip Force Values Out of Specification / Malformed Torsion Springs General Electric identified to the Licensee, in Service Advice Letter PSM 175.1, that HEA relays manufactured between September, 1980 and August, 1983 may exhibit Trip Force values which could cause malfunction, and recommended to the Licensee that all HEA relays manufactured between the above dates should be inspected to determine the force required to trip the relay; and any HEA relay not meeting the specified force be replace The licensee generated nonconformance report No. 3108 to document the inspection, testing and replacement of 13 suspected HEA relay The licensee was also advised by General Electric in Service Advice Letter PSM 165.1 that certain HEA relays manufactured between May, 1979 and December,1980 may fail to operate due to malformed torsion spring The licensee generated NCR no. 2264 to document and control the suspected hardware (26 HEA relays were involved).
The inspector reviewed both NCR's, verifying that the dispositioning and replacement of the HEA relays was in cccordance with the vendors requirement and also verified through QC Inspection Reports that all the suspected relays (A total of 39) were replace This item is considered close (Closed) 10 CFR 50, Appendix B, criterion V violation 85-17-01 Preventive maintenance lapse after construction turnover of "Q" equipment to PSEG startu , . - - , ,
. .
.
.
-10-On April 18, 1985, the NRC inspector identified numerous (approximately 400)
safety-related "Q" preventive maintenance activities that had not been performed in accordance with the schedule for equipment and systems turned over to PSSUG.
During this inspection, the inspector reviewed MD-AP, ZZ-010(Q) " Maintenance Department Procedure" revision 1, dated August 27, 1985, which was revised to. include measures to ensure that turned over equipment receives the
'
required maintenance in a timely manner. In addition, the inspector reviewed the following Maintenance Activity Forms.
,
--
Meggering of RHR pump motors
--
physical rotation of reactor feed pump shafts
--: Cleaning of air filters for the vital bus UPS inverters The frequencies of the maintenance activities were in accordance with specified requirements and the licensee had a negligible PM backlo This item is considered close (Closed) Unresolved Item 85-10-02 Cable Tray Edge Protectors Bechtel's specific work plan / procedure SWP/-E-17 titled " Cable Installation" defines the criteria for the application of cable tray edge protector In a previous inspection, the inspector identified many locations where edge protectors were not installe During this inspection the inspector observed cable trays in the upper and lower spreading rooms, and general plant areas, and verified that cable tray edge protectors were installed where require This item is close .0 Exit Meeting The inspector met with licensee and construction representatives (denoted in paragraph 1.0) at the conclusion of the inspection on October 25, 1985 at the construction sit The inspector summarized the scope of the inspection, the inspection findings and confirmed with the licensee that the documents reviewed by the team did not contain any proprietary information. The licensee agreed that the inspection report may be placed in the Public Document Room without prior licensee review for proprietary information (10 CFR 2.790).
At no time during this inspection was written material provided to the licensee.