March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - HOPE CREEK GENERATING STATION (05000354/2008001)

Dear Mr. Levis:

On February 12, 2008, the NRC staff completed its performance review of Hope Creek Generating Station (Hope Creek). Our technical staff reviewed performance indicators (PIs)

for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only--Security Information" will include the Security cornerstone review and resultant inspection plan.

Overall, Hope Creek operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility. We also plan to conduct inspections to review activities related to your power up-rate application and operations during the independent spent fuel storage installation loading campaign scheduled in the third quarter of 2008.

The staff identified that there were more than three findings for the current assessment period with documented cross-cutting aspects in procedural compliance (H.4(b)) and complete, accurate and up-to-date procedures (H.2(c)). The staff determined that a substantive cross-cutting issue did not exist because you identified the problems with procedural compliance and procedure adequacy, recognized these problems affected multiple areas and developed comprehensive corrective actions. Specifically, you expanded the scope of the root cause analysis that you conducted for procedural compliance at Salem to also review performance at Hope Creek. In that analysis you identified procedural compliance and procedure adequacy issues and specified corrective actions which have been appropriately scheduled or completed for both themes. For procedural compliance your corrective actions focused on reinforcing standards through management observations and personal accountability. For procedure adequacy your corrective actions included implementing dynamic learning activities to reinforce standards for procedure accuracy and completeness and incorporating procedure reviews into the work management process. The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch Division of Reactor Projects 3

Docket Nos. 50-354 License Nos. NPF-57

Enclosure: Hope Creek Generating Station Inspection/ Activity Plan

cc w/encl:

T. Joyce, Senior Vice President, Operations G. Barnes, Site Vice President K. Chambliss, Director, Nuclear Oversight B. Clark, Director of Finance J. Perry, Hope Creek Plant Manager J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP Consumer Advocate, Office of Consumer Advocate, Commonwealth of PA L. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director, NJ Radiation Protection Programs P. Mulligan,Chief, NJ Bureau of Nuclear Engineering H. Otto, Ph.D., Adminstrator, DE Division of Water Resources N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance Institute of Nuclear Power Operations (INPO) The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise that cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Arthur L. Burritt, Chief /RA/

Reactor Projects Branch Division of Reactor Projects 3

Distribution w/encl:

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP A. Burritt, DRP M. Gamberoni, DRS L. Cline, DRP G. Malone, DRP, Sr Res Insp T. Wingfield, DRP, Res Insp K. Venuto, DRP, Resident OA G. West, RI OEDO J. Lubinski, NRR H. Chernoff, NRR R. Ennis, PM, NRR J. Shea, NRR, Backup D. Screnci, PAO N. Sheehan, PAO DRS Branch Chiefs Region I Docket Rm (w/concurr)

ROPreports@nrc.gov RidsNrrDirslpab@nrc.gov JWT1@nrc.gov

SUNSI REVIEW COMPLETE: __LC_(Reviewers Initials)

DOCUMENT NAME: S:\\ROP-8 EOC REVIEW\\ANNUAL ASSESSMENT LETTERS\\BRANCH 3\\HC EOC LETTER.DOC

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure

"E" = Copy with attachment/enclosure "N" = No copy

OFFICE RI/DRP

RI/DRP

NAME LCline/ LC ABurritt/ ALB DATE 02/29 /08 02 / 28 /08

Hope Creek Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2008 10:18:59 Report 22

7112201

- PUB RAD SAFETY - RETS Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/28/2008 02/01/2008

7112201 IP

71004

- POWER UPRATE Other Routine Power Uprate 03/01/2008 07/31/2008

71004 IP

MODS

- PERMANENT PLANT MODIFICATIONS Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 03/31/2008 04/04/2008

7111117B IP Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 04/14/2008 04/18/2008

7111117B IP

71121

- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 05/12/2008 05/16/2008

7112101 IP Baseline Inspections ALARA Planning and Controls 05/12/2008 05/16/2008

7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 05/12/2008 05/16/2008

7112103 IP

EP

- EP EXERCISE EVALUATION EP Baseline Inspection Exercise Evaluation 05/19/2008 05/23/2008

7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/19/2008 05/23/2008

7111404 IP Baseline Inspections Drill/Exercise Performance 05/19/2008 05/23/2008

71151-EP01 IP Baseline Inspections ERO Drill Participation 05/19/2008 05/23/2008

71151-EP02 IP Baseline Inspections Alert & Notification System 05/19/2008 05/23/2008

71151-EP03 IP

DNMS

- ISFSI LOADING CAMPAIGN INSPECTION Other Routine Operation Of An ISFSI 07/01/2008 09/30/2008

60855 IP

71121

- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 07/21/2008 07/25/2008

7112101 IP Baseline Inspections ALARA Planning and Controls 07/21/2008 07/25/2008

7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 07/21/2008 07/25/2008

7112103 IP

7111111B

- REQUAL INSPECTION +P/F REVIEW Baseline Inspections Licensed Operator Requalification Program 10/06/2008 10/10/2008

7111111B IP

TI 171

- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008

2515/171 IP

7111107B

- HEAT SINK INSP Baseline Inspections Heat Sink Performance 09/15/2008 09/19/2008

7111107B IP

71121

- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 09/29/2008 10/03/2008

7112101 IP Baseline Inspections ALARA Planning and Controls 09/29/2008 10/03/2008

7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 09/29/2008 10/03/2008

7112103 IP Baseline Inspections Performance Indicator Verification 09/29/2008 10/03/2008

71151 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/29/2008 10/03/2008

71151-PR01 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Hope Creek Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2008 10:18:59 Report 22

2/2EXAM

- INITIAL OPERATOR LICENSING EXAM Not Applicable FY09 - HOPE CREEK INITIAL OPERATOR EXAM 01/05/2009 01/09/2009

U01693 Not Applicable FY09 - HOPE CREEK INITIAL OPERATOR EXAM 02/02/2009 02/13/2009

U01693

71152B

- PI&R BIENNIAL TEAM Baseline Inspections Identification and Resolution of Problems 01/12/2009 01/16/2009

71152B IP Baseline Inspections Identification and Resolution of Problems 01/26/2009 01/30/2009

71152B IP

EP PROGR

- EP PROGRAM INSPECTION EP Baseline Inspection Alert and Notification System Testing 03/22/2009 03/28/2009

7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 03/22/2009 03/28/2009

7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/22/2009 03/28/2009

7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 03/22/2009 03/28/2009

7111405 IP Baseline Inspections Performance Indicator Verification 03/22/2009 03/28/2009

71151 IP

71121

- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009

7112101 IP Baseline Inspections ALARA Planning and Controls 04/06/2009 04/10/2009

7112102 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 04/06/2009 04/10/2009

7112103 IP

7111108G

- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 04/27/2009 05/01/2009

7111108G IP

7112203

- PUB RAD SAFETY - REMP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 04/27/2009 05/01/2009

7112203 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.