March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2012001)

Dear Mr. Joyce:

On February 12, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Hope Creek Generating Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. Hope Creek was in the Degraded Cornerstone Column of the NRCs Reactor Oversight Process (ROP) Action Matrix until the most recent quarter, due to one or more greater-than-green inspection findings in the Security Cornerstone. The Cornerstone returned to Green in the fourth quarter 2012, as stated in the Assessment Follow-up Letter for Security dated November 15, 2012 (ML12320A546)1. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column because all inspection findings had very low (i.e., green) safety significance, all PIs indicated that your performance was within the nominal, expected range (i.e., green), and the IP 95002 supplemental inspection was successfully completed for the greater-than-green security inspection findings on August 31, 2012. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspection, the NRC will perform Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants, as well as Temporary Instruction (TI)-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will

1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS. contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Glenn Dentel at (610)-337-5233 with any questions you have regarding this letter.

Sincerely,

/RA/

William M. Dean

Regional Administrator

Docket Nos. 50-354 License Nos. NPF-57

Enclosure: Hope Creek Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML13059A301 SUNSI Review

Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/ORA

NAME mmt RMontgomery/RM GDentel/GTD DRoberts/DJR WDean/WMD

DATE 02/26 /13 02/ 26/13 02/ 27/13 02/ 28/13

Page 1 of 2 02/25/2013 11:04:20 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 01/01/2013 - 06/30/2014 PI&R

- PI&R

1 IP Problem Identification and Resolution 71152B 01/28/2013 02/01/2013

IP Problem Identification and Resolution 71152B 02/11/2013 02/15/2013 TRI FI

- TRIENNIAL FIRE PROTECTION INSPECTION

1 IP Fire Protection [Triennial]

7111105T 03/18/2013 03/22/2013

IP Fire Protection [Triennial]

7111105T 04/01/2013 04/05/2013 EP PROGR

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 03/25/2013 03/29/2013

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/25/2013 03/29/2013

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/25/2013 03/29/2013 8/19 EXM

- HOPE CREEK INITIAL EXAM

1 FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01872 07/22/2013 07/26/2013

FY13-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U01872 08/19/2013 08/21/2013 HP

- RADIATION SAFETY INSPECTIONS

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/13/2013 05/17/2013

IP Radiation Monitoring Instrumentation 71124.05 05/13/2013 05/17/2013

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/13/2013 05/17/2013 60855

- ISFSI LOADING INSPECTION

1 IP Operation Of An ISFSI 60855 06/01/2013 07/31/2013

IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2013 07/31/2013 HP

- RADIATION SAFETY INSPECTIONS

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/30/2013 10/04/2013

IP Occupational ALARA Planning and Controls 71124.02 09/30/2013 10/04/2013

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/30/2013 10/04/2013

IP Occupational Dose Assessment 71124.04 09/30/2013 10/04/2013

IP Radiation Monitoring Instrumentation 71124.05 09/30/2013 10/04/2013 7111108G

- INSERVICE INSPECTION

1 IP Inservice Inspection Activities - BWR 7111108G 10/14/2013 10/18/2013 HP

- RADIATION SAFETY INSPECTIONS

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/21/2013 10/25/2013

IP Occupational ALARA Planning and Controls 71124.02 10/21/2013 10/25/2013

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/21/2013 10/25/2013

IP Occupational Dose Assessment 71124.04 10/21/2013 10/25/2013

IP Radiation Monitoring Instrumentation 71124.05 10/21/2013 10/25/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 02/25/2013 11:04:20 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hope Creek Inspection / Activity Plan 01/01/2013 - 06/30/2014 71124.08

- RADWASTE

1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/16/2013 12/20/2013 MODS

- PERMANENT PLANT MODIFICATIONS

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/05/2014 05/09/2014 71124

- REMP

1 IP Radiological Environmental Monitoring Program 71124.07 05/12/2014 05/16/2014 MODS

- PERMANENT PLANT MODIFICATIONS

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/19/2014 05/23/2014 EP EXER

- EP EXERCISE INSPECTION

1 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 05/19/2014 05/23/2014 TI-182

- DEGRAD UNDERGROUND PIPING - PHASE 2

1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 06/02/2014 06/06/2014 This report does not include INPO and OUTAGE activities.