Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Report 05000354/2011001)
ML12061A062
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/05/2012
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT, AL
Shared Package
ML12055A184 List:
References
IR-11-001
Download: ML12061A062 (5)


Text

UNITED STATES rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION UNIT 1 (REPORT 05000354/2011001)

Dear Mr. Joyce:

On February 3, 2012 the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspection, the NRC will perform portions of Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, to verify implementation of your commitments related to drywell air gap monitoring and Temporary Instruction (TI)-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 Enclosure:

Inspection Plan cc: Distribution via ListServ