March 2, 2007
SUBJECT:
ANNUAL ASSESSMENT LETTER - HOPE CREEK GENERATING STATION (REPORT 05000354/2007001)
Dear Mr. Levis:
On February 13, 2007, the NRC staff completed its performance review of Hope Creek Generating Station (Hope Creek). Our technical staff reviewed performance indicators (PIs)
for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Overall, Hope Creek operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct an inspection to review modifications and other actions related to your power up-rate application.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5069 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Arthur L. Burritt, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57 Enclosure: Hope Creek Inspection/Activity Plan cc w/encl:
G. Barnes, Site Vice President D. Winchester, Vice President - Nuclear Assessments W. F. Sperry, Director of Finance M. Massaro, Hope Creek Plant Manager J. J. Keenan, General Solicitor, PSEG M. Wetterhahn, Esquire, Winston and Strawn, LLP Consumer Advocate, Office of Consumer Advocate, Commonwealth of Pennsylvania L. A. Peterson, Chief of Police and Emergency Management Coordinator P. Baldauf, Assistant Director of Radiation Protection and Release Prevention, State of New Jersey K. Tosch, Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection H. Otto, Ph.D., Administrator, Interagency Programs, DNREC Division of Water Resources, State of Delaware N. Cohen, Coordinator - Unplug Salem Campaign E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance
Hope Creek Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2007 13:19:40 Report 22
71121
- OCC RAD SAFETY Baseline Inspections 01/08/2007 01/12/2007
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/08/2007 01/12/2007
7112102 IP ALARA Planning and Controls Baseline Inspections 01/08/2007 01/12/2007
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment
71114
- EP PRGM INSP Baseline Inspections 04/02/2007 04/06/2007
7111402 IP Alert and Notification System Testing Baseline Inspections 04/02/2007 04/06/2007
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 04/02/2007 04/06/2007
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/02/2007 04/06/2007
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 04/02/2007 04/06/2007
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/02/2007 04/06/2007
71151-EP02 IP ERO Drill Participation Baseline Inspections 04/02/2007 04/06/2007
71151-EP03 IP Alert & Notification System
9/24 EXM
- OPERATOR LICENSING INITIAL EXAMS Not Applicable 08/27/2007 08/31/2007
U01661 FY07 - HOPE CREEK INITIAL OPERATOR LICENSING Not Applicable 09/24/2007 10/05/2007
U01661 FY07 - HOPE CREEK INITIAL OPERATOR LICENSING
71121
- OCC RAD SAFETY Baseline Inspections 07/09/2007 07/13/2007
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/09/2007 07/13/2007
7112102 IP ALARA Planning and Controls Baseline Inspections 07/09/2007 07/13/2007
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment
7111117B
- MODS AND 50.59 Baseline Inspections 07/16/2007 07/20/2007
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 07/16/2007 07/20/2007
7111117B IP Permanent Plant Modifications
- PI&R Baseline Inspections 09/17/2007 09/21/2007
71152B IP Identification and Resolution of Problems Baseline Inspections 09/24/2007 09/28/2007
71152B IP Identification and Resolution of Problems
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 09/17/2007 09/21/2007
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program
71004
- POWER UPRATE Other Routine 10/01/2007 12/31/2007
71004 IP Power Uprate
7111108G
- IN-SERVICE INSPECTION Baseline Inspections 10/15/2007 10/19/2007
7111108G IP Inservice Inspection Activities - BWR
71121
- OCC RAD SAFETY Baseline Inspections 10/22/2007 10/26/2007
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007
7112102 IP ALARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Hope Creek Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2007 13:19:40 Report 22
71121
- OCC RAD SAFETY Baseline Inspections 10/22/2007 10/26/2007
71151 IP Performance Indicator Verification
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 12/03/2007 12/14/2007
7112202 IP Radioactive Material Processing and Transportation
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 01/28/2008 02/01/2008
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems
7111107B
- HEAT SINK INSP Baseline Inspections 02/25/2008 02/29/2008
7111107B IP Heat Sink Performance
71121
- OCC RAD SAFETY Baseline Inspections 05/12/2008 05/16/2008
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/12/2008 05/16/2008
7112102 IP ALARA Planning and Controls Baseline Inspections 05/12/2008 05/16/2008
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.