MONTHYEARML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23118A1032023-04-28028 April 2023 PI&R Inspection Document Request IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) IR 05000354/20220052022-08-31031 August 2022 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005) ML22103A0662022-04-13013 April 2022 Information Request to Support Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000354/2022012 IR 05000354/20210062022-03-0202 March 2022 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2021006) ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000354/20210052021-09-0101 September 2021 Updated Inspection Plan for the Hope Creek Nuclear Generating Station (Report 05000354/2021005) IR 05000354/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000354/2020005) IR 05000354/20190062020-03-0303 March 2020 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2019006) IR 05000354/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000354/2019005) ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000354/20180062019-03-0404 March 2019 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2018006) ML18340A2492018-12-0303 December 2018 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000354/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000354/2018005) IR 05000354/20170062018-02-28028 February 2018 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Reports 05000354/2017006, 05000354/2017402, and 05000354/2017501) IR 05000354/20170052017-08-28028 August 2017 Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005) IR 05000354/20160062017-03-0101 March 2017 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2016006) IR 05000354/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Hope Creek Generating Station Report (05000354/2016005) IR 05000354/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2015006) IR 05000354/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Hope Creek Generating Station (Report 05000354/2015005) IR 05000354/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2014001) IR 05000354/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000354/2014006 IR 05000354/20130012014-03-0404 March 2014 ROP-14 2013 Hope Creek Generating Station Annual Assessment Letter, Report 05000354-13-001, and Inspection Plan IR 05000354/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000354-13-006 IR 05000354/20120012013-03-0404 March 2013 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354-12-001) ML12334A0052012-11-28028 November 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML12248A0422012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Hope Creek Generating Station, Unit 1 IR 05000354/20110012012-03-0505 March 2012 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Report 05000354/2011001) ML1124113152011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Hope Creek Generating Station IR 05000354/20100012011-03-0404 March 2011 Annual Assessment Letter for Hope Creek Generating Station, EOC-11 (05000354-10-001) ML1024403372010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Hope Creek Generating Station ML1006208502010-03-0303 March 2010 2009 EOC Hope Creek Annual Assessment Letter and Report 22 IR 05000354/20090012009-03-0404 March 2009 Annual Assessment Letter - Hope Creek Nuclear Generating Station (05000354-09-001) ML0824607952008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Hope Creek Generating Station IR 05000354/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Hope Creek (05000354/2008001) ML0724309452007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000354/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Hope Creek Generating Station (Report 05000354-07-001) IR 05000354/20060012006-03-0202 March 2006 Annual Assessment Letter - Hope Creek Nuclear Generating Station (Report 05000354/2006001) ML0424402332004-08-30030 August 2004 Hope Creek ROP5 Mid-Cycle Performance Review and Inspection Plan LR-N04-0036, Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal2004-03-11011 March 2004 Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal ML0406308562004-03-0303 March 2004 2003-04 Annual Assessment Letter - Hope Creek ML0323904242003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Hope Creek Generating Station ML0306207722003-03-0303 March 2003 2003 Annual Assessment Letter - Hope Creek Nuclear Generating Station ML0223501752002-08-23023 August 2002 2002 Hope Creek Mid-Cycle Performance Review and Inspection Plan IR 05000354/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Hope Creek Nuclear Plant (Report 50-354/02-001) 2024-09-11
[Table view] Category:Letter
MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement 2024-09-05
[Table view] |
Text
rch 1, 2002
SUBJECT:
ANNUAL ASSESSMENT LETTER - HOPE CREEK NUCLEAR PLANT (REPORT 50-354/02-001)
Dear Mr. Keiser:
On January 30, 2002, the NRC staff completed its end-of-cycle plant performance assessment of the Hope Creek Nuclear Plant. The end-of-cycle review for Hope Creek involved the participation of the responsible technical divisions in Region I in evaluating the performance indicators (PIs)
and inspection results for the period of April 1 through December 31, 2001. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
As discussed in our previous annual assessment letter dated May 31, 2001, this inspection and assessment cycle consisted of three quarters (i.e., the second, third and fourth calendar quarters of calendar year 2001) instead of the usual four quarters. This change was implemented in order to align the inspection and assessment cycle with the calendar year beginning on January 1, 2002.
Overall, Hope Creek operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2003.
The enclosed inspection plan details the inspections scheduled through March 31, 2003. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The schedule for the last six months of the inspection plan is tentative and may be revised at the Mid-Cycle Review meeting.
Immediately following the terrorist attacks on the World Trade Center and the Pentagon, the NRC issued safeguards advisories recommending that nuclear power plant licensees go to the highest
Mr. Harold Keiser 2 level of security, and all promptly did so. With continued uncertainty about the possibility of additional terrorist activities, the Nation's nuclear power plants, including Hope Creek, remain at a high level of security. On February 25, 2002, the NRC issued an Order to all nuclear power plant licensees, requiring them to take certain additional interim compensatory measures to address the generalized high-level threat environment. These additional compensatory requirements will provide the NRC with reasonable assurance that public health and safety and the common defense and security continue to be adequately protected in the current generalized high-level threat environment. These requirements will remain in effect pending notification from the Commission that a significant change in the threat environment occurs, or until the Commission determines that other changes are needed following a more comprehensive re-evaluation of current safeguards and security programs. To date, we have monitored your staffs actions in response to the terrorist attacks through a series of audits. With the issuance of the Order, we will evaluate Hope Creeks compliance with these interim requirements.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5211 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Glenn W. Meyer, Chief Division of Reactor Projects Branch 3 Docket No. 50-354 License No. NPR-57 Enclosure: Hope Creek Inspection/Inspection/Activity Plan
Mr. Harold Keiser 3 cc w/encl: E. Simpson, Senior Vice President and Chief Administrative Officer M. Bezilla, Vice President - Technical support D. Garchow, Vice President - Operations G. Salamon, Manager - Licensing R. Kankus, Joint Owner Affairs J. J. Keenan, Esquire Consumer Advocate, Office of Consumer Advocate F. Pompper, Chief of Police and Emergency Management Coordinator M. Wetterhahn, Esquire N. Cohen, Coordinator - Unplug Salem Campaign E. Gbur, Coordinator - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance State of New Jersey State of Delaware
Mr. Harold Keiser 4 Distribution w/encl: Region I Docket Room (with concurrences)
J. Schoppy - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA G. Meyer, DRP R. Barkley, DRP T. Haverkamp, DRP L. Prividy, DRS DRS Director, Region I L. Prividy, DRS J. Furia, DRS G. Smith, DRS N. McNamara, DRS B. Platchek, DRP T. Bergman, OEDO E. Adensam, NRR R. Ennis, PM, NRR R. Fretz, Backup PM, NRR DOCUMENT NAME: G:\Branch 3\Hope Creek End-of-Cycle Letter 2002.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP N NAME Rbarkley/RSB GMeyer/GWM DATE 03/01/02 03/01/02 OFFICIAL RECORD COPY
Page 1 of 2 Hope Creek 02/28/2002 12:07:16 Inspection / Activity Plan Report 22 12/30/2001 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111112B - MAINT RULE 2 1 IP 7111112B Maintenance Rule Implementation 01/07/2002 01/11/2002 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/28/2002 02/01/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 01/28/2002 02/01/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 01/28/2002 02/01/2002 Baseline Inspections 3/11EXAM - OPERATOR LICENSING INITIAL EXAMS 4 1 U01462 HOPE CREEK O/L INITIAL EXAM 03/04/02 TO 03/15/02 02/11/2002 02/15/2002 Not Applicable 1 U01462 HOPE CREEK O/L INITIAL EXAM 03/04/02 TO 03/15/02 03/11/2002 03/14/2002 Not Applicable 7111107B - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 03/18/2002 03/22/2002 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 05/27/2002 05/31/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 05/27/2002 05/31/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 05/27/2002 05/31/2002 Baseline Inspections 71130 - SECURITY 2 1 IP 7113001 Access Authorization Program (Behavior Observation Only) 06/03/2002 06/07/2002 Baseline Inspections 1 IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization) 06/03/2002 06/07/2002 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 09/16/2002 09/20/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 09/16/2002 09/20/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 09/16/2002 09/20/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/16/2002 09/20/2002 Baseline Inspections 71130 - SECURITY-RESPONSE ATT3 2 1 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy) 11/04/2002 11/08/2002 Baseline Inspections 7111121 - SSDI 6 1 IP 7111121 Safety System Design and Performance Capability 11/18/2002 11/22/2002 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 12/09/2002 12/13/2002 Baseline Inspections 7111111B - L.O.REQUALIFICATION PROGRAM 2 1 IP 7111111B Licensed Operator Requalification 12/16/2002 12/20/2002 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 01/06/2003 01/10/2003 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 01/06/2003 01/10/2003 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 01/06/2003 01/10/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Hope Creek 02/28/2002 12:07:16 Inspection / Activity Plan Report 22 12/30/2001 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111117B - MODS 3 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/13/2003 01/17/2003 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 01/13/2003 01/17/2003 Baseline Inspections 2/24 EXM - OPERATOR LICENSING INTIAL EXAMS 2 1 U01494 HOPE CREEK INITIAL EXAM (2/24/03) 01/27/2003 01/31/2003 Not Applicable 1 U01494 HOPE CREEK INITIAL EXAM (2/24/03) 02/24/2003 02/28/2003 Not Applicable 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program 02/17/2003 02/21/2003 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 3 1 IP 71152B Identification and Resolution of Problems 03/10/2003 03/14/2003 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 03/24/2003 03/28/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.