ML20135G064

From kanterella
Revision as of 20:30, 19 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for June 1985
ML20135G064
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/30/1985
From: Scott A
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20135F982 List:
References
NUDOCS 8509180101
Download: ML20135G064 (1)


Text

r-

- Page 8 of 8 CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i l RUN DATE 09/05/05 OPERATING DATA REPORT RPD36 RUN TIME 09.41 43 ROBINSON UNIT 2 DOCKET NO. 050-0261 CUMPLETED DY A. E. SCulT OPERATING S' LATUS TELEPHONE (003)303-4524

i. UNIT NAME: ROBINSON UNIT 2 l NOTES There are presently 222 1
2. REPORTING PERIOD: JUNE 05 l fuel assemblies in the Spent Fuel 1
3. LICENSED THERMAL POWER (MWT) 2300 i Pool. I
4. NAMEPLATE RATING (GROSS MWE) '/39.0 l l S. DESIGN ELECTRICfL RATING (NET MWE) 700.0 1 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE) 700.0 l 1
7. MAX DEPENDABLE CAPACIlY (NET MWE) 665.0 -- - - -~~- - -- - - --- -
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEliS 3 IHRU 7) SINCE LASI REPORT, GIVE REASONS
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)- NONE
10. REASONS FOR RESTRICTION IF ANY: NONE THIS YR TO cut 1UL MONiH DATE ATIVE ii. HOURS IN REPORfING PERIOD 720.00 4343.00 125573.00
12. NUMDER OF HOURS REACTOR CRITICAL 720.00 3514.95 87712.25
13. REACTOR RESERVE SHUTDOWN HRS .00 001.37 2730.44
14. HOURS GENERATOR ON LINE 720.00 3393.49 05459.44
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 23.20
16. GROSS THERMAL ENERGY GEN. (MWH) 1635763.60 7319007.04 17019504i.20
17. GROSS ELEC. ENERGY GEN. (MWH) 530230.00 2403041.00 S4740717.00 l
10. NET ELEC. ENERGY GENERATED (MWil) 513390.00 2270062.00 51687723.00 '
19. UNIT SERVICE FACTOR 100.00 78.14 60.06
20. UNIT AVAILADILITY FACTOR 100.00 70.14 60.07
21. UNIT CAP. FACTOR (USING hDC NET) 107.22 70.00 61.90
22. UNIT CAP. FACTOR (USING DER NET) 101.06 74.93 50.00
23. UNIT FORCED OUTAGE RATE .00 17.94 15.20
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIUN OF EACH)

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORCAST ACllEIVED INITIAL CRITICALITY - - - - - - --- --

INITIAL ELECTRICITY 11 - - -C--

COMMERCIAL OPERATION -- -- --C--

R 1.16 -9