ML20138A616

From kanterella
Revision as of 05:34, 15 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 9 to Administrative Procedure AD 1839.04, Shift Technical Advisor Per Aw Deagazio & Fr Allenspach Request for Addl Info Re Availability of Shift Technical Advisor.Advisor Will Work Rotating Shift
ML20138A616
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/05/1985
From: Williams J
TOLEDO EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20138A621 List:
References
1226, NUDOCS 8512120067
Download: ML20138A616 (1)


Text

.,' .

\

TOLEDO

%ms EDISON Docket No. 50-346 JOEWILUAMS JR.

Senor Vv.e Rwan1ert-tus (419]243 2300 License No. NPF-3 (4tsia49 sm Serial No. 1226 December 5, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

By letter (Serial No. 1208) of November 16, 1985, Toledo Edison submitted Revision 4 of the Davis-Besse Course of Action (COA) to you. That submittal included Toledo Edison's response to the NRC Additional Question (designated Question 32 by Toledo Edison) dated November 7, 1985 (Log No. 1857).

Messrs. A. W. DeAgazio and F. R. A11enspach of your staff have requested additional information be provided concerning the attendance of the Shift Technical Advisor (STA) at all Shift Supervisor turnovers and the avail-ability of the STA to readily respond to plant needs. As discussed with your Staff, Toledo Edison has revised Administrative Procedure AD 1839.04 (copy enclosed) to address these items. Specifically, your attention is directed to AD 1839.04, Section 5.1.7, Page 4 with regards to STA attendance at shift turnovers. In addition, AD 1839.04, Section 3.3, Page 1, has been revised to reflect that the STA will no longer work a 24-hour schedule (i.e., including asleep-on-call) but rather a rotating shift, therefore, being readily available to respond to plant needs.

Very truly yours, Jm whJ6 JW:DRW:lah enclosure cc: DB-1 NRC Resident Inspector 8512120067 851205 gdD PDR ADOCK 05000346 P PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652