ML20090B859

From kanterella
Revision as of 06:18, 13 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for June 1984
ML20090B859
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/30/1984
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RSEP-84-457, NUDOCS 8407130027
Download: ML20090B859 (4)


Text

-

'Attrchment 1 to RSEP/84-457 P:g: 1 of 1 UPERATING DATA REPORT DOCKET NO. 050-0261 DATE 07/06/84 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524

.0PERATING STATUS

i. UNIT NAME: ROBINSON UNIT 2 1 NOTES There are presently 379 I

~2. REPORTING. PERIOD: JUNE 84 i I

3. LICENSED THEPMAL POWER (MWT) 2300 I pool,Fuel Assemblies in the Spent Fuel l
4. NAMEPLATE RA~1ING (GROSS MWE) 739.0 l I
5. IESIGN ELECTRICAL RATING (NET MWE)- 700.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE) 700.0 l 1
7. MAX DEPENDABLE CAPACITY (NET MWE)- 665.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS.(ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) None
00. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE s
01. HOURS IN REPORTING PERIOD 7'20.00 4367.00 116813.00
02. NUMBER OF HOURS REACTOR CRITICAL .00 616.07 84197.30 D3.-REACTOR RESERVE SHUTDOWN HRS .00 38.93 1830.32 il 4. HOURS GENERATOR ON LINE .00 615.78 82u65.95 DS. UNIT RESERVE SHUTDOWN HOURS .00 .00 23.20
06. GROSS THERMAL ENERGY GEN. (MWH) .00 '703895.20 1628'75234.16 J '7 . GROSS ELEC. ENERGY GEN. (MWH) .00 246010.00 523448'76.00
38. NET ELEC. ENERGY GENERATED (MWH) -1677.00 2i3458.00 49433082.00
39. UNIT SERVICE FACTOR .00 14.10 70.25 O. UNIT AVAILADILITY FACTOR .00 14.10 70.27
. UNIT CAP. FACTOR (USING MDC NET) .35 7.35 63.64
2. UNIT CAP. FACTOR (USING DER NET) .33 6.98 60.45
3. UNIT FURCED OUTAGE RATE .00 57.24 15.17
24. SHUTDOWNS SCHED. OVER NEXT 6 f10NTHS (TYPE, DATE, AND DURATION OF EACH)-
5. IF SHUTDOWN AT END OF REPORT PERICD, ESTIMATED DATE OF START UP 10/25/84
6. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORCAST ACHEIVED IN TIAL CRITICALITY ---- -- --- ----

INITIAL ELECTRICITY - - - - - --------

COMMERCIAL OPERATION .

8407130027 840630 DR ADOCK 05000261 i . i 6 -- 9 PDR

. _ m- -

. Attachment 2 to' RSEP/84-457 Page 1 of 1 APPENDIX D AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0261 UNIT ROBINSON UNIT 2 DATE 07/02/84 COMPLETED BY A. E. SCOTT TELEPHONE (803)303-4524 JUNE 1984 JAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -? 17 -2

~2 -3 18 -2 3 -2 19 -2

-4 -2 20 e -2

~

~5 --2 21 -2 6 -2 22 -2 7 -3 23 -2

'8 _ ,- 2 24 -2 9 -2 25 -2 10 -3 26 -2 91 -2 27 -2 0 2 -- -2 28 -

-2 03 -2 29 -2 14 -3 30 -2 45 -3 96 -3 1.16 - 8

Attachment 3 to RSEP/Cb457 Pege 1 of 1 050-0261- -*

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME H. B. Robinson DATE Ran7n?

I June . COMPLETED BY A. E. Scott REN)RT MONTil TELEPHONE (803) 181-As?4 i

1 e.

1 ._ E E i -, .! E 3 $Y5 Licensee E

,% EL Cause & Cinrectise No. Daie g 3g 7; jg5 Event s '9

$0 h As. tion to

~

jE .u

' ;5 =$

Report 3 E' U

Prevent Recurrence i O I

h j 0601 840601 S 720 C 1 ---

CJ HTEXCH Continuation of Refueling and i Steam Generator Replacement Outage.

I, i

4 i

i i.

i 1

i 2 3 4

. F: Forced Reason. Method: Exhibit G - Instinctions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scrarn. Entry Sheets for Licensee i C-Refueling 3-Automatic Scram. Event Report ILl!R) File tNURI G-D-Regulatory Restriction 4-Other (Explain) 0161) l 4 E-Operator Training & License Examination F-Administrative 5 i G-Operational Eiror (Explain) Inhibit ! - Same Source

(9/~7) Il-Other ( Explain) i

Form 244 Carolina Power & Light Company ranwanwammsussz:ra H. B. ROBINSON STEAM ELECTRIC PIANT company correspondence POST OFFICE b0X 790 HARTSVILLE, SOUTH CAROT.INA 29550 JUL 9 1984 Robinson File No: 15505 Serial: RSEP/84-457 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of June, 1984.

Ver; truly yours, R.f.E Morgan f?x General Manager H. B. Robinson SEG Plant AES/ml Enclosure cc: R. A. Hartfield (2)

J. P. O'Reilly (1)