ML20091M874

From kanterella
Revision as of 23:22, 12 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for May 1984
ML20091M874
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/31/1984
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RSEP-84-409, NUDOCS 8406120135
Download: ML20091M874 (4)


Text

. . ..- . - . - - - . . _ . . . . . . . . . - - - _ _ - - - - - - - - - - - - - . - - _

Pig 3 3 ef 3 ,

a UNITSilVTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0261 #

UNIT NAME H. B. Robinson DATE 840601 COMPLETED BY A. E. Scott REPOR f MONTil May TELEPilONE (803) 383-4524

. "h -

L .! E 3g h .Yk Licensee Er $*'1, Cause & Corrective .

No. Date g 3g jg5 Event E$ $-3 Action to

  • $5 E ji5g Report a N0 j' Prevent Recurrence 6

0501 840501 S 744 C 1 CJ HTEXCH Continuation of Refueling and Steam Generator Replacement Outage I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Eqt.ipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee ,

C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-O her(Explain) 0161) p E-Operator Training & License Examination

_ t- F-Admir.istrative 5

% G-Operational Err'or (Explain) Exhibit I - Same Source (9/77) ,ll-Other (Explain) 8406120135 840531 PDR ADOCK 05000261 PDR R

A Enc 1 RSEP/84-409 bg:curstoSirici:

1 of 3 OPERATING DATA REPORT DOCKET NO. 050-0261 DATE 06/01/84 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524 OPERATING STATUS

i. UNIT NAME: ROBINSON. UNIT 2 1 NOTES I
2. REPORTING PERIOD: .MAY 84 l There are presently 314 Spent i
3. LICENSED THERMAL POWER (MWl) 2300 l fuel Assemblies in the Spent i
4. NAMEPLATE RATING (GROSS MWE) 739.0 l Fuel Pool, l
5. DESIGN ELECTRICAL RATING (NET MWE)- 700.0 l I
6. MAX DEPENDABLE CAPACITY (GROSS MWE) 700.0 l l
7. MAX DEPENDABLE CAPACITY,(NET MWE): 665.0 ----------------- -------------

O. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): none "
10. REASONS FOR RESTRICTION IF ANY: n/a ,

l THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 744.00 3647.00 ii6093.00

12. NUMBER OF HOURS REACTOR CRITICAL .00 616.07 84197.30
13. REACTOR RESERVE SHUTDOWN HRS .00 38.93 1830.32
14. HOURS GENERATOR ON LINE .00 615.78 82065.95
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 23.20
16. GROSS THERMAL ENERGY GEN. (MWH) .00 783895.20 162875234.16
17. GROSS ELEC. ENERGY GEN. (MWH) .00 246010.00 52344876.00
18. NET ELEC. ENERGY GENERATED (MWH) -1652.00 215135.00 49434759.00
19. UNIT SERVICE FACTOR .00 .16.88 70.69
20. UNIT AVAILADILITY FACTOR .00 16.88 70.71
21. UNIT CAP. FACTOR (USING MDC NET) .33 8.87 64.03
22. UNIT CAP. FACTOR (USING DER NET) .32 8.43 60.83
23. UNIT FORCED OUTAGE RATE .00 57.24 15.17
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIOM OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 10-25-84
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORCAST ACHEIVED INITIAL CRITICALITY --- -- --- --

INITIAL ELECTRICITY ----C -- --- C --

COMMERCIAL OPERATION --- -s-- --- =s--

1.16 - 9 w_.

o

't g2 2 cf 3 APPENDIX B AVERAGE DAILY POWER LEVEL .

. DOCKET NO. 050-0261 UNIT RODINSON UNIT 2 DATE 06/01/84 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524 IAY 1984 fDAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -2 17 -2 2 -2 18 -2 3 -2 19 -2 4 -2 20 -2 5 -2 21 -2 6 -2 22 -2 7 -2 23 '

-2 8 -2 24 -2 9 . -2 25 -2 10 -2 26 -2 11 -2 27 -2

.12 -2 28 -2 13 -2 29 -2 14 -2 30- -2 15 -2 31 -2 16 -2 t

9 e

1.16 - 8 s

'g.

CP&L .- w , . . . .

Carolina Power & Light Company H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JUN - 61994 Robinson File No: 15505 Serial: RSEP/84-409 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.lc for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of May, 1984.

Very truly yours, R. E. rgan General Manager H. B. Robinson SEG Plant FMG/js Enclosure cc: '

R. A. Hartfield (2)

-J. P. O'Reilly (1) f$Y

'fl m