Interim Deficiency Rept Re Nonconformance of Pipe Fittings Mfg by Tube-Line Corp.Intially Reported on 830422.Final Rept Expected by 830919
ML20076J032
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/25/1983
From: Manno S
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, 6714, NUDOCS 8306200262
Download: ML20076J032 (2)


Text

_ _ - _ _ _ _ _ _ _ _ _ _ _

g M V NIAGARA

. R UMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ER!E BOULEVARo WEST. SYRACUSE. N.Y.13202/ TELEPHONE (315) 474-1511 May 25, 1983 (6714)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is a 30-day interim report in accordance with 10CFR50.55(e) for the problem concerning items supplied by Tube-Line Corporation. This condition was reported via telecon to Mr. H. Kister of your staff on April 22, 1983, as a potentially reportable deficiency.

Very truly yours, S. F. Manno Vice President Nuclear Construction SFM/TL:Ja Enclosure xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. D. Schulz, Resident Inspector 8306200262 830525 gDRADOCK 05000410 PDR D

9 ,,

NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Items Supplied by Tube-Lino Corporation Description of the Problem Certain material (i.e., pipe fittings) has been supplied to the Nine Mile Point Unit 2 Site by Tube-Line Corporation. This material was purchased through purchase orders placed by Niagara Mehawk Power Corporation to Capitol Pipe and Steel Products Company. It is believed that this material has not been manufactured in compliance with the provisions of NCA-3800 of the ASME Code,Section III. This material was procured as loose material and was required to meet ASME Section III, Class 2, requirements. The material was intended for use, as needed, for ASME Section III Class 2 and 3, as well as ANSI B31.1 Code Class 4 applications.

This problem was identified in the NRC I.E. Information Notice No. 83-07.

The matter is still being investigated and a final report will be submitted by September 19, 1983.