ML20077H716
ML20077H716 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point, 05000000 |
Issue date: | 07/15/1983 |
From: | Grunt N, Williams J FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
References | |
PNS-LI-83-497-1, NUDOCS 8308110238 | |
Download: ML20077H716 (18) | |
Text
,
- - AVERAGE DAILY UNIT POWER LEVEL
, DOCKET NO. 50-250 UNir Turkey Point Unit 3 DATE _ July 15,1983 COMPLETED liY - N.W. Grant TELEPilONE (305)552-3675' I
MONTH June 1983 .
DAY AVERAGE D ILY P WER LEVEL DAY AVERAGE DAILY POWER LEVEL
-(MWe-Net )
I 17 676 2 669 677 3 .
662 678 3
4 660 20 678 .
5 660 - 683 2
6 618 22 680 7 574 678 23
- 8 676 627.'
24 .
- 9 683 25 663 to 683 678 26
. E81 68'-
II 37 12 676 28 680 13 675 674 j .29 -_
681 669 14 3g
- s 676 3, 16 675 INSTRUCTIONS l' On this formar. list the average daily uilt power leyl in MWe-Net for each day in the reporting month. Compute to the nearest whole megawati.
l (9/77) 8308110238 830715 PDR ADOCK 05000250 R pyg.
1 l
l 1
~
OPERATING DATA REPORT DOCKET NO. _50-250 DATE _dulv 15. 1983 COMPLETED IlY -N. W. Grant TELEPHONE _(305)S52-3675 OPERATING STATUS
- 1. Unit Name: Turkey Point Unit 3 Notes -
une 1983
- 2. Reporting Period: Unit 3 operated at essentiall)
- 3. Licensed Thennal Power (MWt):
2200 ful1 power. '
- 4. Nameplate Rating (Gross MWe): 760
- 5. Design Electrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give' Reasons:
l 9. Power Level To which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictionsfif Any:
This Month Yr.-to-Date Cumulative 92,648.6 11; Hours In Reporting Period i 720 4,343
- 12. Number Of Hours Reactor Was Critical - 720 4,295.7 65,096
- 13. Reactor Reserve Shutdown Hours 0 ,__ _ !
0' ' ' 84&i4~
- 14. Hours Generator On-Line -/20 4,211 ,
63,716.1
- 15. Unit Reserve Shutdown Hours e 0 0- -121.0
- 16. Gross Thermal Energy Generated (MWH) 1,577,299 9.23L634 , d30,657.,546 .
- 17. Gross Electrical Energy Generated (MWH)- 504,885_. 3.019,765 41,681,755
- 18. Net Electrical Energy Generated (MWH) 480.950 2,878,544- 39,466,096 97.0-
~
- 19. Unit Service Factor 100.0 68.7
- 20. Unit Availability Factor 100.0 97,0 68.9
- 21. Unit Capacity Factor (Using MDC Net) -
100.3 102.0 65.9
- 22. Unit Capacity Factor (Using DER Net) 96.4 95.6 6i.b j ~23. Unit Forced Outage Rate 0 2.5 5. 5~
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each): * '
Refueling ~, October 1983, 2' months ,
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: ' -~
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiet ed .
- INITIA L CRITICALIT Y ;9 -
INITIA L ELECTRICITY COMM ERCIAL OPERATION 1
(9/77) hs' .
o
s DOCKET NO. S'0-250 -
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point 3 DATE July 15,1983 COMPLETED BY P. Pace REPORT MONT11 June 1983 TELEPHONE (305) 552-Jbb4 No . Date g
3?
3g 3
4 hY.
,g g 5 Licensee Event
,Eg 3,7 g3 Cause & Corrective Action to H
fE 5 jig Report = mU g' Prevent Recurrence 6
Unit 3 had no unit shutdowns or i significant reductions in power level.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S Scheduled A Eqmpment Failure (Explain) 1 -Manual for Preparation of Data 8 Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Esent Report (LER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 0161)
I Operator Training & Ucense Examination f -Administ rative p ,
5 G Operational Error (Explain) 6- _ /.oao 44 eve ..d Exhibit I - Same Souree (9/77) 11-01her (E splam)
SUMMARY
OF OPERATING EXPERIENCE i DOCKET NO. 50-250 UNIT Turkey Point 3 DATE July 15,1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH June 1983 Unit 3 operated at essentc a lly full power for the entire month.
Major safety related maintenance activities included:
Spent fuel crane bearings and cable were replaced.
An HPSI flow transmitter was repaired.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
O
. AVERAGE DAILY UNIT POWER LEVEL
,D'OCKET NO. 50-251
- v. UNil.
Turkey Point Unit 4 DATE Jul_y 15, 1983 COMPLETED llY N. W. Grant TELEPflONE (305) 552_3675 i
MONE June 1983 .
DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL tMWe Net) . (MWe-Net ) ,-
1 679 1, 376 ,-
672 241 2 ,3 ,
668 3 39 4 669 ___ _
5 668 2, ___
6 673 g ___
7 674- 89 23
'C 670 -
8 24 82 ,
9 674 490
. 25 677 672' to
' -I t 677 673 27 12 674 532 -
23 670 668 -
I3 29 14 674 664
, 30 IS 672 16 670 , ,
c INSTRUCTIONS On this format. list the average daily unit giower lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
~
OPERATI G DATA REPORT DOCKET NO. 50-251 DATE J-15-83 COMPLETED IlY _N.W. Grant TELEPHONE (305)552-3675 OPERATING STATUS
- 1. Unit Name:
Turkey Point 4 - -
Notes
- 2. Reporting Period: June 1983 Onit 4 operated at
- 2200 essentially full power
- 3. Licensed Thennal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 760 except.as indicated'in' the S. Design Electrical Rating (Net MWe): 693 Unit Shutdowns and Power ~
- 6. Maximum Dependable Capacity (Gross MWe): 700- Reductions Report
- 7. Maximum Dependable Capacity (Net MWe): 666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give~ Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to-Date . Cumulative
~
i 720 4,343 86,3-76
,, 11; Hours In Reporting Period 60,962.6.
~
- 12. Number Of Hours Reactor Was Critical " 713.5 1,107.3
' 166.6-
- 13. Reactor Reserve Shutdown Hours O' 0* -
- 14. Hours Generator On-Line 582 5 933.2_, 58,829.2-
- 15. Unit Reserve Shutdown Hours' 0 0 31.2
- 16. Gross Thennal Energy Generated (MWH) 1.232.028 1,884,780 . 123,801,024- '.
- 17. Gross Electrical Energy Generated (MWH)~ 386_,475_ . 590.500 39,366,012
- 18. Net Electrical Energy Generated (MWH) 364,721 553,971 37,279,144 80.9
- 19. Unit Service Factor 21.5 68.1
- 20. Unit Availability Factor . 80.9 21.5 .68.1 .
- 21. Unit Capacity Factor (Using MDC Net) - 76.1 19.6 n. 66.8
- 22. Unit Capacity Factor (Using DER Net) 73.1 18.4 62'.3
- 23. Unit Forced Outage Rate 16.2 12.3 -4.0o -
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each): ' -
- 25. If Shut Down At End Of Report Period, Estircated Date of Startup: '
M
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY iU INITIA L ELECTRICITY -
COMMERCIAL OPERATION
. h (9/77) _
b~ - '
s DOCKET NO. 50-251 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Turkey Point 4 DATE July 15. 1983 COMPLETED BY P- Pa t'a REPORT MONTH June 1983 TELEPHONE (1nG)RR9 16sa
, !2 "b h Ek Licensee 5 t, k, Cause & Corrective No. Date c- 3g j jgE Event Action to F?
EU '?
$~ E j di g Report # Prevent Recurrence 5
7 830617 F 9.8 A 3 HA INSTRU Reactor trip caused by a load rejection.
8 830618 F 0 F 5 HB HTEXCH Power reduced to comply with secondary chemistry guidelines.
9 830618 F 99.1 A 1 HC HTEXCil Unit removed from service to repair condenser tube leak.
10 830623 S 24.9 A 1 HA TURBIN Unit removed from service to repair generator seal oil system.
11 830628 F 3.8 A 3 EC INSTRU Reactor trip caused by closed i1SIVs due to jarring o f a breaker during maintenance.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S. Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram- Entry Sheets for Licensee C Refueling ,
3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & License Examination ,
F-Administrative 5 G-Operational Error (Explain n c _ t o a o 4 4 s ve.,..<> Exhibit I - Same Source (9/77) li-Other ( E splain )
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point 4' DATE ,
July 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT MONTH June 1983 Unit 4 operated at power except as noted in the Unit Shutdowns Report.
Other major safety related maintenance activities included:
A charging pump vent valve was replaced.
Several RPS circuit components were replaced.
A HPSI flow transmitter was replaced.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
AVEllAGE DAILY UNIT POWER I.EVEL
. i s- .
} , DOCK ET NO. E0-335
"- UNIT St. Lucie Unit 1 DATE July 15, 1983 COMPLETED liY N. W. Grant TELEPllONE (305)S52-3675 ' ,
1 MONTH June 1983 .
DAY AVERAGE DAILY POWER LEVEL DAY
- AVERAGE DAILY POWER LEVEL tMhe Net) -(MWe Net) ,
I le -
2 gg .
3 --- -. ---
39 .
4 5 ___
6 22 7
g ___
74 .
9 10 ---
26 i--
. .g g . ___ ___
28
' ~
13 ---
29
--- ~~ '
14 30 IS 33 , ,
16 INSTRUCTIONS On this format. list the aver. ige daily uniti t ower lesel in MWe-Net for each day in the reporting month. Compute o the nearest whole megawatt. _
(9/771 D
m.___.___m. _ _ . _ __.-..__._.s_ _ _ _ _ . _ . _ -
O _4._-.
~
OPERATI G DATA REPORT DOCKET No.53-335 DATE .dW]v 15.~l983 COMPLETED BY .N. W. Grant TELE!' HONE (305)RR9-3675 OPERATING STATUS St. Lucie Unit 1 Notes
- 1. Unit Name:
- 2. Reporting Period: June 1983 Unit remained out of service 2700 for refueling and scheduled
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): maintenance".
- 5. Design Electrical Rating (Net MWe): 830
- 6. Maximum Dependable Capacity (Gross MWe): 867
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number .1 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date . Cumulative 11; Hours In Reporting Period 720 4,343 57,191
- 12. Number Of Hours Reactor Was Critical - 0 1,366.9 44,466.1
- 13. Reactor Reserve Shutdown Hours 0 ! 0' ' '-
' 205'i3'
- 14. Hours Generator On-Line 0 1,350.9 43,576.2
- 15. Unit Reserve Shutdown Hours -
0 0. 39.3 0 3,352,422
- 16. Gross Thermal Energy Generated (MWH)' '108.667 938- -
- 17. Gross Electrical Energy Generated (MWH) 0 _, 1,160,280 35,373,875
- 18. Net Electrical Energy Generated (MWH), -2,444 1,089,b/3- 33,353,864
- 19. Unit Service Factor 0 31.1 76.2
- 20. Unit Availability Factor 0 31.1 76 3
- 21. Unit Capacity Factor (Using MDC Net) . 0 30.7 '- /4 2
- 22. Unit Capacity Factor (Using DER Net) 0 30.2 72.2
'23. Unit Forced Outage Rate, 0 1.1 4. 6'
- 24. Shutdowns Scheduled Over Next 6 Months (T3 pe. Date.and Duration of Each): * -
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: September 1983 < _-~
- 26. Units in Test Status (Prior Io Commercial Operation): Forecast Achiet ed . .
INITIA L CRITICALITY i9 -
3 INITIA L ELECTRICITY - l COMM ERCIAL OPERATION (9/77) i.~ . o
a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 St. 3ucie 1 UNITNAMEDATE "JdTV 15. 1983 COMPLETED BY P. L. Pace MEPORT MONm June 1983 TELEPHONE (305) 552-3654 n.
C E, P9 T $ e-g y3 Licensee 5"., 81, Cause & Corrective N. . Date C
E-5g2 3 6 3 cc Event 37 u> v gvy , Ac,;g, ,o o E 3Ej RcPori e Prevent Recurrence 6
3 830226 S 720 C 4 RC FUELXX Unit I remained out of service for refueling and scheduled maintenance.
i i i 2 3 4 i
F: Forced Reason: Method: Exhibit C - Instructions
! S. Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report iLER) File tNUREG-l D-Regulatory Restriction 9 Other (Explain) 0161) l 1 -Operator Training & bcense laamination F-Administrative 5 i G-Operational I.r ror iI~ s plain I c_ Aoao 44s w.v. .<> E shibit 1 - Same Source 19/77) Il-Other (INplain )
f
SUMMARY
OF OPERATING EXPERIENCE i DOCKET NO. 50-335 UNIT St. Lucie Unit 1 DATE July 15, 1983 COMPLETED BY P. L. Pace TELEPHONE (305) 552-3654 REPORT I4ONTH June 1983 St. Lucie Unit 1 remained out of service for a refueling and maintenance outage.
Major safety related main'tenance included:
Several boric acid heat tracing circuits were repaired or replaced.
A boric acid make up pump was rebuilt.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
See correspondence between FPL and NRC for information concerning the thermal shield.
.A k
n to
AVER AGE DAILY UNIT POWER 1.EVEl.
. i l '* .
, DOCKET NO. _50-389 v.
UNIT St. Lucie Unit 2 DA1E July 15. 1983 COMPLETED liY ' N. W. Grant
.I'ELEPflONE. -(305)552-3675 -
1 MONm June 1983 -
DAY AVERAGE DAILY POWER LEVEL DAY
- AVERAGE DAILY POWER LEVEL 1MWe Net) . (ywe. Net) ,.
g 16 -'
lo -
2 gg .
78 3
--- -' 7 39 .
4 20 92 . ,
5 ---
21 92 6 22 84 7 ---
23 --
g -_. .
2g 9 -
10 26
.gg ,, --
12 ---
28 --
13 13 --
, 29 -
-~
34
-. 30 .
49 15-33 , ,
16 -
- INSTRUCTIONS i
On this format. list the aver. ige daily unit t ower leselin MWe Net for each dayin the reporting month.' Compute to the nearest whole megawatt. _
(9/77) s
- , F m _ -.
i OPERATING DATA REPORT DOCKET NO. 50-389 DATE .My 15. 1983 COMPLETED llY fLW. Grant TELEPIIONE .(305)S52-3675 OPERATING STATUS I* Unit Name: St. Lucie Unit 2 Notes Unit 2 achieved initial June 1983 criticality on June 2, 1983
- 2. Reporting Per.iod: and initial electricity was' 5% of 2560
- 3. Licensed Thermal Power (MWt):
U produced on. June 13, 1983.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): approximately 805
- 6. Maximum Dependable Capacity (Gross MWe): to be determine 1
- 7. Maximum Dependable Capacity (Net MWe): to be determine <1
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report.Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any-.
This Month Yr.-to-Date Cumulative II; flours in Reporting Period 0
- 12. Number Of flours Reactor Was Critical 511.2
- 13. Reactor Reserve Shutdown liours 0 ' ' 1
- 14. Hours Generator On-Line 109.I
- 15. Unit Reserve Shutdown Hours 0
- 16. Gross Thennal Energy Ge'erated n (MWII) 75,806 -
- 17. Gross Electrical Energy Generated (MWH) 16,850
- 18. Net Electrical Energy Generated (MWil) -1 Tbb_,
- 19. Unit Service Factor
. .2 ,
- 20. Unit Availability Factor 15.2
- 21. Unit Capacity Factor (Using MDC Net) - 0
- 22. Unit Capacity Factor (Using DER Net) 0
- 23. Unit Forced Outage Rate 36.1
- 24. Shutdowns Scheduled Oser Next 6 Months (Type, Date.and Duration of Each): '
- 25. If Shut Down At End Of Repert Period. Estimated Date of Startup: ' "
- 26. Units in Test Status (Prior o Commercial Operation): Forecast Achiesed INITIA L CRITICA LITY 5/27/83
6/ 2/83 INITIA L ELECTRICITY June 1983- 6/13/83 COMMERCIAL OPER ATION Late July 1983-1 (4/77)
~' . .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-389 _
UNIT NAME St. Lucie 2 DATE July 15. 1983 June COMPg.ETED BY P- Pace REPORT MONTH TELEPHONE f1nGi 6R9 1644 "i
- , 5? 3j Yk Licensee ,E g b, Cause & Corrective k
g .g s 5
[l No. Date 3g Event Action to
[?
H
$ :. E jgg Report a mV ' Prevent Recurrence 6
NA 830406 NA NA B NA NA NA NA Unit 2 conducted preoperational test-ing.
1 830614 S 13.6 B 9 NA NA Turbine overspeed trip test 2 830614 F 6.8 A 3 HC HTEXCH Reactor trip caused by condenser steam. dumps failing open.
3 830615 S 29.8 B 2 NA NA Turbine overspeed trip test.
4 830617 F 1.1 F 3 HA TURBIN Turbine trip due to generator lockout.
5 830617 S 11.3 S 2 NA NA Reactor trip - test program.
6 830618 F 3.2 F 3 HA TURBIN Two turbine trips on generator lockoui, misadjusted switch found.
7 830618 S 0 F 5 HB HTEXCH Power reduction due tc secondary chemistry guidelines.
I 2 3 4 F: Forced Reason: Method: Exhibit G. instructions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 0161)
E-Operator Training & beense Examination ,
I Administrative 5 G-Operational Error (Explain) s _ /.e e 44ewa..d Exhibit I- Same Source (9/77) li Other (Explai 0
DOCKETNO. 50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Z DATE July 15. 1983 COMPLETED BY P. Pace REPORT MONTH June 1983 TELEPHONE (305)552-3654 Continued
"; C
- e T to a 5? Licensee E -r, c Cause & Corrective
- , s fsX u> S43 Action to No - Date i '5i i; 2sE Event
$5 E j di g Report 5S 0 Prevent Recurrence )
6 k 8 830618 F 2.1 A 3 HA TURBIN Turbine trip on generator lockout.
9 830619 S 18.4 F 9 HB HTEXCH Above outage continued due to 4 secondary water chemistry guidelines.
10 830620 F 14.3 A 2 HB VALVEX MSR intercept valve closed. Manual trip following loss of load.
11 830621 F 23.1 A 3 IA INSTRU Reactor tripped. on miss-set low flow setpoint.
I 12 830622 S 173.3 B 1 HC HTEXCH Unit removed from service to clean <'
condensate pump strainers. Outage extended to repair reactor coolant pump seal injection.
I 1
1 2 3 4 j F: Forced Reason: Method: Exhibit G . Instructions S. Scheduled A Lqmpment Failure (Explain) 1 Manual for Preparation of Data H Maintenance or Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LERI File iNUREG-D-Regulatory Restriction Gother (Explain) 0161) li-Operator Training & License Examination ,
F Administrative 5 G-Operational Error (laptaml 4- /.o ao 4.tswea. .r/ Exhibit I Same Source 07/77) Ilother(lsplam)
l
SUMMARY
OF OPERATING EXPERIENCE i DOCKET NO. 50-389 UNIT St. Lucie Unit 2 DATE July 15, 1983 COMPLETED BY P. L. Pace TEI,EPHONE (305) 552-3654 REPORT MONTH June 1983 Unit 2 reactor declared critical June 2, 1983. Initial electricity produced on June 13, 1983.
See the Unit Shutdowns an'd Power Reductions report for details on unit outages.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional
.information.
In accordance with requirements of NUREG-0737 Item II.K.3.3., there were no challenges to PORV or safety valves during the report month.
S
~-
e FLORIDA POWER & LIGHT COM"ANY July 15, 1983 PNS-LI-83-497/1 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Wa shington , D. C. 20555
Dear Sir:
Attached are the June 1983 Operating Status Reports and Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit Nos. I and 2.
Very truly yours, La J. W. Williams, Jr.
Vice President Nuclear Energy JWW/NWG/js Attachment cc: J. P. O'Reilly, Region II j
i ZG zy
- /t PEOPLE , . SERVING PEOPLE