ML20085H220

From kanterella
Revision as of 18:44, 16 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Quarterly self-monitoring Repts for Plant Sanitary Waste Sys for Months of Mar,Apr & May.Results from Quarterly Isotope Analysis & Industrial Wastewater Questionnaire Also Encl
ML20085H220
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/15/1995
From: Shelton D
CENTERIOR ENERGY
To: Long G
LAKE COUNTY, OH
Shared Package
ML20085H223 List:
References
PY-CEI-LCDU-003, PY-CEI-LCDU-3, NUDOCS 9506210049
Download: ML20085H220 (1)


Text

_ - __ _ - _ - _ - _ _ _ _ - _ _ _ _ _ _ _ _ _

.c .1 .  !

i L , g.ggygg

. e ': ENERGY

)

PERfW NOCLEAR POWER PLANT Mail Address: Donald C. Shelton X

M . OHIO 44081 SENIOR VICE PRESIDENT yCE NUCLEAR pts) a srp .

June 15,1995 r i-m /tNm1 L l

Lake County Department of Utilities Attention: Gary Long, Hentor Vaste Facility ,

l P.O. Box 490 Painesville, Ohio 44077-0490 Gentlemen:

Enclosed are the Quarterly Self-Monitoring Reports for the Perry Nuclear Power Plant sanitary vaste system for the months of March, April and May.

All required samples were collected and analyzed in accordance with the self-monitoring program.

Also enclo w' e the results from an isotopic analysis and the annual Industrial avater Questionnaire.

If you have question or require. additional information, please contact Donna Tizzano at (216) 280-5514.

Very t y yours, DGT:sc Enclosures cc: NRC Project Manager l NRC Resident Inspector Office i NRC Document Control Desk (Docket No. 50-440)

NRC Region III l

l l

l 50621004 950615 t

l m muuc 05000440 R pm Operating Componies Clevelona Dectne lituminating Toledo Earson  ;

l