ML20086D639
| ML20086D639 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/18/1995 |
| From: | CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20085H223 | List: |
| References | |
| NUDOCS 9507100281 | |
| Download: ML20086D639 (1) | |
Text
j.
5 INDUSTRIAL PRETREATHENT' 0UARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.
Report Date: 5/23/95 Perry, Ohio 44081 Laboratory: Quanterra Inc.
l Date of Sample: 5/4.to 5/5 Time of sample: 0930 Sample Location: Sevage Pump Station Name of Sampler: Greg Newman i
Laboratory Address: 1401 Shuffel Dr.
North Canton OH 44720 Date of Analysis: 5/5 to 5/18/95 Flows 33,000 gpd Name of Analyst: A. DiPofi PARAMETER SAMPLE EPA ANALYSIS ANALYSIS i
TYPE METHOD DATE RESULT C0D Composite 410.4 5/17 330 mg/L BOD Composite 405.1 5/5 to 5/10 160 mg/L TSS Composite 160.2 5/8 to 5/9 270 mg/L Silver Composite 200.7 5/15 to 5/17 None Detected j
Mercury Composite 245.1 5/15 to 5/18 Hone Detected pH Grab 150.1 5/5 8.5 s.u.
Oil /GreaEe Grab 413.1 5/16 to 5/17 13 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and j
imprisons
]A'
\\
C(l]
k /\\ m (N Vice President - Nuclear t
Signature ~
Date Title 9507100281 950615 PDR ADOCK 05000440 R
-