ML20086D622
| ML20086D622 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/18/1995 |
| From: | CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20085H223 | List: |
| References | |
| NUDOCS 9507100275 | |
| Download: ML20086D622 (1) | |
Text
m 1
J INDUSTRIAL PRETREATHENT l
OUARTERLY SELF-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911 10 Center Rd.
Report Date: 4/25/95 l
Perry, Ohio 44081 Laboratory: Quanterra Inc.
Date of Sample: 4/6 to 4/7/95 Time of sample: 0900 Sample Location: Sewage Pump Station Name of Sampler:,Greg Newman i
i Laboratory Address: 1401 Shuffel Dr.
)
North Canton OH 44720 i
i Date of Analysis: 4/7 to 4/18/95 Flow: 33,000 gpd Name of Analyst: J. Kapraly l
PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE KESULT l
C0D Composite 410.4 4/13 to 4/14 210 mg/L BOD Composite 405.1 4/7 to 4/12 220 mg/L TSS Cotaposite 160.2 4/13 t0 4/14 140 mg/L l
Silver Composite 200.7 4/12 to 4/18 None Detected l
Mercury Composite 245.1 4/12 to 4/15 None Detected pH Grab 150.1 4/7 8.7 s.u.
Oil / Grease Grab 413.1 4/17 to 4/18 19 mg/L Gravimetrie I certify under penalty of lav that I have personally examined and I am l
familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, i
and complete.
I am aware that there are significant penalties for submitting false infor:tation including the possibility of fine and imprisonm C
S (/$
Vice President - Nuclear kh C
Signature a Date Title I
h R
,