ML20086D604
| ML20086D604 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/16/1995 |
| From: | CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20085H223 | List: |
| References | |
| NUDOCS 9507100267 | |
| Download: ML20086D604 (1) | |
Text
,,...
y; '
,g g
4..
u
\\9 C
INDUSTRIAL PRETREATMENT OUARTERLY-SELP-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911
~
.10' Center Rd.
Report Date -3/21/95 L
Perry,. Ohio 44081 Laboratory: Quanterra Date of Sample: 3/3 to 3/4/95 Time of sample: 900 Sample Location: Sewage Pump Station Name of Sampler: Greg Newman I
Laboratory Address: 1401 Shuffel Dr.
L North Canton OH 44720 L
Date of Analysis 3/3 to 3/16/95 Flev: 33,000 gpd l
Name of Analyst: M. Recznik PARAMETER SAMPLE EPA ANALYSIS ANALYSIS
' TYPE METHOD DATE RESULT COD Composite 410.4 3/13 120 mg/L BOD Composite 405.1 3/3 to 3/8 9 ag/L l
TSS-Composite 160.2 3/6 to 3/7 110 mg/L Silver.
Composite 200.7 3/10 to 3/16 None Detected Mercury Composite 245.1 3/9 to 3/16 None Detected pH Grab 150.1 3/3 8.7 s.u.
Oil / Grease Grab 413.1 3/13 to 3/14 32 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am 1
familiar with the information in this report and that, based on my inquiry l
of those persons immediately responsible for obtaining the information I
contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for
-submitting false in Srmation including the possibility of fine.nd imprisonment b
Vice President - Nuclear Signa".ure Date Title DR R
_________