|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20236K7731987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235W3781987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20238E2741987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20235H3151987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20214W3241987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214R5101987-04-30030 April 1987 Rev 1 to Monthly Operating Rept for Apr 1987,correcting Operation Statistics & Shutdown Experience Due to Mathematical Errors ML20215L4941987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20210B4141987-03-31031 March 1987 Revised Monthly Operating Rept for Mar 1987 ML20206F3561987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20212P3101987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20210R6341987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20207M2451986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215C7911986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20213F3121986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20215G1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20212F5321986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20202G3371986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211B5601986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20197D2651986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20155C6461986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20137Y2631986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20214B9131986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20137B3711985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20137Z0901985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136A7121985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20133J0521985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20133J0651985-08-31031 August 1985 Revised Monthly Operating Rept for Aug 1985 ML20135F9861985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134D9611985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 ML20132F6251985-06-30030 June 1985 Monthly Operating Rept for June 1985 ML20135G0641985-06-30030 June 1985 Revised Monthly Operating Rept for June 1985 ML20126L7141985-05-31031 May 1985 Monthly Operating Rept for May 1985 ML20135F9921985-04-30030 April 1985 Revised Monthly Operating Rept for Apr 1985 ML20127G2481985-04-30030 April 1985 Monthly Operating Rept for Apr 1985 ML20115C9401985-03-31031 March 1985 Monthly Operating Rept for Mar 1985 ML20112D9131985-02-28028 February 1985 Monthly Operating Rept for Feb 1985 ML20106J3801985-01-31031 January 1985 Monthly Operating Rept for Jan 1985 ML20112H8071984-12-31031 December 1984 Monthly Operating Rept for Dec 1984 ML20101B1871984-11-30030 November 1984 Monthly Operating Rept for Nov 1984 ML20099C6941984-10-31031 October 1984 Monthly Operating Rept for Oct 1984 ML20093E3861984-09-30030 September 1984 Monthly Operating Rept for Sept 1984 ML20097C7951984-08-31031 August 1984 Monthly Operating Rept for Aug 1984 ML20094N2661984-07-31031 July 1984 Monthly Operating Rept for Jul 1984 ML20090B8591984-06-30030 June 1984 Monthly Operating Rept for June 1984 ML20091M8741984-05-31031 May 1984 Monthly Operating Rept for May 1984 ML20084H8601984-04-30030 April 1984 Monthly Operating Rept for Apr 1984 ML20088A1681984-03-31031 March 1984 Monthly Operating Rept for Mar 1984 ML20087A9181984-02-29029 February 1984 Monthly Operating Rept for Feb 1984 ML20087A5401984-01-31031 January 1984 Monthly Operating Rept for Jan 1984 ML20086N0061984-01-31031 January 1984 Monthly Operating Rept for Jan 1984 1987-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers RA-97-0258, LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review1997-12-19019 December 1997 LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20217Q2751997-06-30030 June 1997 CP&L Fitness for Duty Program Performance Data for Period 970101-0630 ML14183A6951995-09-18018 September 1995 Safety Evaluation Approving Relocation of Technical Support Ctr ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML17352A8691993-05-31031 May 1993 Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants. ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20079H1571991-09-30030 September 1991 Nonproprietary Evaluation of Revised Transfer to Cold Leg Recirculation Procedure,Hb Robinson Unit 2 ML20086T2951991-06-14014 June 1991 Rev 1 to EQ Documentation Package Eqdp 36.0, Boston Insulated Wire Cable ML20086T2861991-03-0808 March 1991 Rev 1 to EQ Documentation Package Eqdp 11.1, Dekoron Instrumentation Cables ML20086T2561991-03-0808 March 1991 Rev 1 to EQ Documentation Package 10.0, Continental Shielded Instrument Cable ML20065K6961990-10-31031 October 1990 Mechanical Licensing Rept for Hb Robinson High Thermal Performance Fuel Assemblies ML20065K6971990-10-31031 October 1990 Thermal Hydraulic Compatibility Analysis of Anf High Thermal Performance Fuel for Hb Robinson,Unit 2 ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML20247E0701989-07-20020 July 1989 Info Rept:On 890717-0804,fire Penetration Seals Will Be Removed from Svc to Allow Access for Ventilation Sys Mod. Addl Fire Barrier Penetrations Will Be Made in Wall Between RHR Pump Pit & Fuel Handling Bldg,Per Tech Spec 3.14.7.2 ML20246E9111989-03-31031 March 1989 PDC-3:Advanced Nuclear Fuels Corp Power Distribution Control for PWRs & Application of PDC-3 to Hb Robinson Unit 2 ML20245H0821989-01-25025 January 1989 Criticality Safety Analysis of Hb Robinson Spent Fuel Pool W/4.2% Nominal Enrichment Fuel Assemblies ML20205T0551988-10-31031 October 1988 Responses to NRC Questions on RTD Bypass Elimination Licensing Rept ML20147E2371988-02-29029 February 1988 1987 Annual Rept - Primary Coolant Iodine Spikes ML20147B1971987-12-31031 December 1987 1987 Annual Rept - Primary Safety & Relief Valve Challenges ML20236K7731987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235W3781987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20238E2741987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20235H3151987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML17261A5301987-06-18018 June 1987 Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys ML20214W3241987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214R5101987-04-30030 April 1987 Rev 1 to Monthly Operating Rept for Apr 1987,correcting Operation Statistics & Shutdown Experience Due to Mathematical Errors ML20215L4941987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206F3561987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20210B4141987-03-31031 March 1987 Revised Monthly Operating Rept for Mar 1987 ML20205F6021987-03-23023 March 1987 Special Rept:On 870302,noble Gas Effluent Monitor for Main Steam Line B Declared Inoperable & Svc Not Returned Until 870312.Caused by Defective Detector.Detector Replaced.High Voltage for Detector Adjusted & Sys Operation Checked ML20212P3101987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20214Q7891987-01-31031 January 1987 Cycle 12,SAR ML20210R6341987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20207M2451986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 L-18-120, Rev 0 to Supplemental Info in Support of Conservatisms in Criticality Analysis Performed for Hb Robinson Isfsi1986-12-18018 December 1986 Rev 0 to Supplemental Info in Support of Conservatisms in Criticality Analysis Performed for Hb Robinson Isfsi ML20215C7911986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20213F3121986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20215G1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20215F0361986-09-29029 September 1986 Special Rept:On 860902,during Cold Shutdown,Pressurizer PORV Lifted Twice to Prevent Overpressurization.Caused by Inadvertent Action by Unit Operators.Operations Personnel Counseled Re Importance of Breaker Position Indicators ML20211C0641986-09-0909 September 1986 Rev 0 to Final Rept Criticality Safety Analysis Hb Robinson Spent Fuel Storage Racks (Unpoisoned,Low Density) W/4.2% Enriched 15x15 Fuel Assemblies ML20211C0491986-09-0202 September 1986 Rev 0 to Final Rept Criticality Safety Analysis Hb Robinson New Fuel Storage Vault W/4.2% Enriched 15x15 Fuel Assemblies ML20212F5321986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20203D0221986-07-14014 July 1986 Part 21 Rept Re Air Monitoring Sys Probes Exhibiting Blue Tip Rather than Normal White Tip & Insensitive to Chlorine. Caused by Improper Handling/Storage.Advisory Bulletin Encl. Item Not Reportable Per Part 21 ML20202G3371986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211B5601986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20197D2651986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 1999-09-22
[Table view] |
Text
r
, ( (
OPERATING DATA REPORT DOCKET NO. 50-261 DATE 830202 COMPLETED BY H. R w Norris TELEPHONE 803-383-4524 OPERATING STATUS
- 1. Unit Name: H. B. Robinson Unit No. 2 Notes There are presently 157
- 2. Reporting Period: 830101, 0000/830131, 2400 spent fuel assemblics in the 2300 spent fuel pool.
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe): 739
- 5. Design Electrical Rating (Net MWe): 700
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe): 665
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Througir 7) Since Last Report, Gin Reasons:
No change
- 9. Power Level To Which Restricted,if Any (Net MWe): 1955 Mit reactor power
- 10. Reasons For Restrictions,if Any: Although the unit is not restricted by any outside agency, the power level is presently reduced due to steam generator con-siderations.
This Month Yr.-to-Date Cumulative iI. Hours In Reporting Period 744 744 104430
- 12. Number Of Hours Reactor Was Critical 720.3 720.3 77559.97
- 13. Reactor Reserve Shutdown Hours 18.13 18.13 1325.9
- 14. Hours Generator On-Line 705.52 705.52 75541.56
- 15. Unit Reserve Shutdown Hours 0 0 = 23.20
- 16. Gross TI ermal Energy Generated (MWH) 1227907.4 1227907.4 _151992446
- 17. Gross Electrical Energy Generated (MWH) 394959_ . 394960 48903723
- 18. Net Electrical Energy Generated (MWH) 370696 370696 46242793 19.' Unit Service Factor 94.83 94.83 72.33
- 20. Unit Availability Factor 94.83 94.83 72.36
- 21. Unit Capacity Factor (Using MDC Net) 74.92 74.92 66.59
- 22. Unit Capacity Factor (Using DER Net) 71.18 71.18 63.26
- 23. Unit Forced Outage Rate 5.17 5.17 14.14
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):
Type two 4-23-83, four week steam generator inspection outage
- 25. If Shut Down At End Of Report Period Estimated Date of Startup: On-line
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved
, INITIA L CRITICALITY - -
INITIAL ELECTRICITY - -
COMMERCIAL OPERATION 8302170070 030209 PDR ADOCK 05000261 R PDR goj773 sg
s UNIT SHUTDOWNS AND POWE.9. REDUCTIONS DOCKET NO. .f 0-261 UNIT NAME H. B. Robinson DATE 830202 COMPLETED By H. Ray Norris REPORT MONTH January TELEPHONE 803-383-4524 e.
w E E 6
--, .! E 3 jY5 Licensee ,E t, 1, j3 Cause & Corrective No. Dat e g 3g s jg& Event t; 9 c. Action to H
$E 5 5dic Report er N0 $U Prevent Recurrence e g u O
12-1 830101 F 13.33 A 3 HB INSTRU A faulty fuse holder caused the power solenoid for "C" MSIV to de-energize closing the MISV which caused a low-low level in "C" S/G and subsequent unit trip. The fuse holder was re-placed.
1-1 830107 F 25.15 A 1 HH HTEXCH #5 feedwater heater tube leaks.
Twenty-four tubes required plugging.
% e unit's return to service was delayed 5.57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> due to a reactor trip caused by a momentary spurious safeguards actuation signal.
4 1 2 3 4 F: Forced Reason: Method: -
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 -Mann-1 for Preparation of Data B-Maintenance of Test 2-Man 11 Scram. Entry Sheets for Licensee C Refueling 3-Autienatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Othe iExplain) 0161)
E. Operator Training & License Examination F-Administntive 5
. G-Operational Error (Explain) Exhibit I- Same Source (9/77) 11-0ther (Explain) i sg
9 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-261 UNIT H. B. Robinson DATE 830202 COMPLETED BY H. Ray Norris TELEPHONE 803-383-4524 MONTH Jam m DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MWe-Net) (MWe-Net) 66 561
~
17 ,
2 420 18 560 1 3 523 19 453 4 558 20 472 5 558 21 561 6 559 539 22 7 423 23 529 8 -20 24 562 9 331 25 562 10 560 26 562 13 562 27 562 12 561 562 28 33 563 564 29 l 14 563 30 563 33 563 563 33 16 483 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
t r
(9/77)
{
sg
_-.