ML20045H573

From kanterella
Revision as of 15:08, 11 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1993 for Comanche Peak Steam Electric Station,Unit 1
ML20045H573
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/31/1993
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20045H567 List:
References
NUDOCS 9307200395
Download: ML20045H573 (1)


Text

"

. Attachmnnt to TXX-93261 Page 11 of 14 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.2 DOCKET NO: 50445 UNIT: CPSES 1 DATE: July 14,1993 COMPLETED BY: Janet Hughes TELEPHONE: (817)897-5331 OPERATING STATUS

1. Reporting Period: MARCH 1993 Gross hours in reporting period: 244
2. Currently authorized power level (MWI): 3411 Max. depend. capacity (MWe-Net): 1150
  • Design Electrical Rating (MWe Net): 1150
3. Power level to which restricted (if any) (MWe-Net): NONE
4. Reasons for restriction (if any):

THIS MONTH YRTO DATE CUMULATIVE

o. Number of hours reactor was critical 744 2,120.4 17,639
6. 0 39.6 2.298.2 Reactor reserve shutdown hours
7. Hours generator on line 2,m8 17,2633
8. 0 Unit reserve shutdown hours 2,434,910.4 6,654,751.2 S3,950.578.2'
9. Gross thermal energy generated (MWH) 816,313 2,250,111 17,885,276
10. Gross electrical energy generated (MWH)
11. 782,208 2,152.094 16,994.470 Net electrical energy generated (MWH)
12. Reactor Service factor 100.0 98.2 76.4
13. Reactor availability factor 100.0 100.0 86.4
14. Unit service factor 100.0 97.4 74.8
15. Unit availability factor 100.0 97.4 74.8
16. Unit capacity factor (Using MDC) 91.4 86.6 64.0
17. 91.4 86.6 64.0 Unit capacity factor (Using Design MWe)
18. Unit forced outage rate 0 2.6 73
19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20. If shutdo'wn at end of report period, estimated date of startup:
21. Units in test status (prior to commercial operation): ACHIEVED Commercial Operation 900813 MARCH 1993 Estimated REVISION 2 9307200395 930715 T7 PDR ADDCK 05000445 Rd R PDR Q