COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.1
' DOCKET NO:
504 5 UNIT:
CPSES.1 l DATE:
July 14,1993.
COMPLETEDBY:
Janet Hughes ~
TELEPHONE:
817497-5331 q
OPERATING STATUS
' 144.
1.
Reporting Period: MAY 1993 Gross hours in reporting period:
2.
Currently authorized power' level (MWt):
Mil Max, depend. capacity (MWe Net): 1150 4 Design Electrical Rating (MWe Net):
1150 3.
Power level to which restricted (if any) (MWe Net):
U-QNE
}
4.
Reasons for restriction (if any):
L, THIS MONTH YRTO DATE CUMULATIVE 744 3,583.4 19,102
. 5.
Number of hours reactor was critical 0
39.6 2,298 2 -
6.
Reactor reserve shutdown hours 3,567.8 '
18,72&3 7.
Hours generator on line 0
0 8.
Unit reserve shutdown hours 9.
Gross thermal energy generated (MWH) 838,023 l 3,854,184 19,489,349
- 10. ' Gross electrical energy generated (MWH) 802,475 -
3,687,917 18,530,293 11.
Net electrical energy generated (MWH)
^
12.
Reactor Service factor 100.0 98.9
-77.8
- 13.. Reactor availability factor 100.0 100.0 872 11 14.
Unit service factor 100.0 98.5 76.3-15.
Unit availability factor 100.0 98.5 76.3 93.8 88.5 65.7 l
' 16. - Unit capacity factor (Using MDC) 932 8&5 6E7 17.
Unit capacity factor (Using Design MWe) 0 1.5 E7 18.
Unit forced outage rate 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
Refueling Outage Number i.
3 is scheduled to begin October 8,1993, with a duration of 52 days.
20.
If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation): '
ACHIEVED
.i Commercial Operation 900813 MAY 1993 r
REVISION 1
?
Estimated.
9307200397 930715 DR ADOCKL05000445' PDR.
'Attachfrient to TXX-93261 P' ge 14 of 14 a
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT-REV.1 DOCKET NO:
50 486 UNIT:
CPSES 2 DATE:
" July 14,1993
. COMPLETED BY:
Janet Hughes.
i TELEPHONE:
817497-5331-
- OPERATING STATUS 1.
Reporting Period:. MAY 1993 Gross hours in reporting period:
241 2.
Currently authorized power level (MWt):
3111 Max. depend. capacity (MWe-Net): 1E
- Design Electrical Rating (MWe-Net):
1E t
3.
Power level to which restricted (if any) (MWe-Net):
2M 4.
Reasons for restriction (if any):
Initial Startuo THIS MONTH -
YRTODATE CUMUt.ATIVE -
326 834 834 S.
Number of hours reactor was critical
.418 418 418 6.
Reactor reserve shutdown hours
]
328.1 m
W 7.
Hours generator on line 8.'
Unit reserve shutdown hours 665,234.4.
1,330,468.8 1,330,468.8 9.
Gross thermal energy generated (MWH) g 152,610 320,680'-
320,680
- 10. Gross electrical energy generated (MW")
129,268.-
268,787 268,787 11.
Net electrical energy generated (MWH) 12.
Reactor Service factor NA.
NA NA-N A.-
'NA NA 13.
Reactor availability factor
- 14. ' Unit service factor NA
.NA NA NA NA NA 15.
Unit availability factor NA NA NA 16.
Unit capacity factor (Using MDC).
NA NA NA
- 17. Unit capacity factor (Using Design MWe)
NA NA NA
- 18. Unit forced outage rate
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
l
- 20. If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
FORECAST ACHIEVED
Initial Criticality 930320 930324 initial Electricity.
930330
,930409 Commercial Operation 930801 Estimated
. MAYO 1993 REVISION'1
~
'