COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.1

' DOCKET NO:

504 5 UNIT:

CPSES.1 l DATE:

July 14,1993.

COMPLETEDBY:

Janet Hughes ~

TELEPHONE:

817497-5331 q

OPERATING STATUS

' 144.

1.

Reporting Period: MAY 1993 Gross hours in reporting period:

2.

Currently authorized power' level (MWt):

Mil Max, depend. capacity (MWe Net): 1150 4 Design Electrical Rating (MWe Net):

1150 3.

Power level to which restricted (if any) (MWe Net):

U-QNE

}

4.

Reasons for restriction (if any):

L, THIS MONTH YRTO DATE CUMULATIVE 744 3,583.4 19,102

. 5.

Number of hours reactor was critical 0

39.6 2,298 2 -

6.

Reactor reserve shutdown hours 3,567.8 '

18,72&3 7.

Hours generator on line 0

0 8.

Unit reserve shutdown hours 9.

Gross thermal energy generated (MWH) 838,023 l 3,854,184 19,489,349

10. ' Gross electrical energy generated (MWH) 802,475 -

3,687,917 18,530,293 11.

Net electrical energy generated (MWH)

^

12.

Reactor Service factor 100.0 98.9

-77.8

13.. Reactor availability factor 100.0 100.0 872 11 14.

Unit service factor 100.0 98.5 76.3-15.

Unit availability factor 100.0 98.5 76.3 93.8 88.5 65.7 l

' 16. - Unit capacity factor (Using MDC) 932 8&5 6E7 17.

Unit capacity factor (Using Design MWe) 0 1.5 E7 18.

Unit forced outage rate 19.

Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):

Refueling Outage Number i.

3 is scheduled to begin October 8,1993, with a duration of 52 days.

20.

If shutdown at end of report period, estimated date of startup:

21.

Units in test status (prior to commercial operation): '

ACHIEVED

.i Commercial Operation 900813 MAY 1993 r

REVISION 1

?

Estimated.

9307200397 930715 DR ADOCKL05000445' PDR.

'Attachfrient to TXX-93261 P' ge 14 of 14 a

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT-REV.1 DOCKET NO:

50 486 UNIT:

CPSES 2 DATE:

" July 14,1993

. COMPLETED BY:

Janet Hughes.

i TELEPHONE:

817497-5331-

OPERATING STATUS 1.

Reporting Period:. MAY 1993 Gross hours in reporting period:

241 2.

Currently authorized power level (MWt):

3111 Max. depend. capacity (MWe-Net): 1E

  • Design Electrical Rating (MWe-Net):

1E t

3.

Power level to which restricted (if any) (MWe-Net):

2M 4.

Reasons for restriction (if any):

Initial Startuo THIS MONTH -

YRTODATE CUMUt.ATIVE -

326 834 834 S.

Number of hours reactor was critical

.418 418 418 6.

Reactor reserve shutdown hours

]

328.1 m

W 7.

Hours generator on line 8.'

Unit reserve shutdown hours 665,234.4.

1,330,468.8 1,330,468.8 9.

Gross thermal energy generated (MWH) g 152,610 320,680'-

320,680

10. Gross electrical energy generated (MW")

129,268.-

268,787 268,787 11.

Net electrical energy generated (MWH) 12.

Reactor Service factor NA.

NA NA-N A.-

'NA NA 13.

Reactor availability factor

14. ' Unit service factor NA

.NA NA NA NA NA 15.

Unit availability factor NA NA NA 16.

Unit capacity factor (Using MDC).

NA NA NA

17. Unit capacity factor (Using Design MWe)

NA NA NA

18. Unit forced outage rate

- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):

l

20. If shutdown at end of report period, estimated date of startup:

21.

Units in test status (prior to commercial operation):

FORECAST ACHIEVED

Initial Criticality 930320 930324 initial Electricity.

930330

,930409 Commercial Operation 930801 Estimated