E' Log # TXX 97029 2M File # 10010.2 f

Ref. # 10CFR50.36

_=

r 7UELECTR/C' February 14, 1997 C. Lance Terry Group Mce President U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50-446 MONTHLY OPERATING REPORT FOR JANUARY 1997 Gentlemen:

Attached is the Monthly Operating Report for January 1997, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2.

Operating License Nos. NPF 87 and NPF 89. respectively.

Should you have any questions, please contact Jacob H. Kulangara at (817) 897 0124.

Sincerely, C. L. Terry By:

5. S. Marshall Generic Licensing Manager Attachment cc:

Mr. L. J. Callan, Region IV Hr. J. E. Dyer, Region IV Hr. J. I. Tapia, Region IV Hr. T. J. Polich, NRR Resident Inspectors t

q,DD0 f DF 1 9702260341 970131 i

PDR ADOCK 05000445 i

R PDR i

P. O. Box 1002 Glen Rose Texas 76043

= _ _ _ _ _. _.. _ _ _. _ _ _

Attachment to TXX 97029 Page'1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION. UNIT 1 NRC MONTHLY OPERATING REPORT i

DOCKET NO.:

50 445 UNIT:

CPSES 1 DATE:

2/10/97 COMPLETED BY:

Bob Reible TELEPHONE:

897 0449

) - OPERATING STATUS

_ 1.

REPORTING PERIOD:

JANUARY 1997 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

3411 MAX. DEPEND. CAPACITY (We Net):

1150 DESIGN ELECTRICAL RATING (We Net):

1150 3.

POWER LEVEL TO WlICH RESTRICTED (IF ANY) (We Net):

NONE 1

4.

REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUNULATIVE

- 5.'

NUEER OF HOURS REACTOR WAS CRITICAL 744 744 46,838-1 6.

-REACTOR RESERVE SHUTDOWN HOURS 0

0 2,604 g

-7.

HOURS GENERATOR ON LINE 744 744 46,198 8.

UNIT RESERVE SHUTDOWN HOURS 0

0-0 9.

GROSS THERMAL ENERGY GENERATED (WH) 2,530.063 2,530,063 149,979,515

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 858,760 858.760 50,047,290 4
11. NET ELECTRICAL ENERGY GENERATED (WH) 825,342 825,342 47,748.771 l

12.

REACTOR SERVICE FACTOR 100.0 100.0-82.6 1

13. REACTOR AVAILABILITY FACTOR 100.0 100.0 87.2 4
14. UNIT SERVICE FACTOR 100.0 100.0 81.4
15. UNIT AVAILABILITY FACTOR 100.0 100.0 81.4
, 16. UNIT CAPACITY FACTOR (USING MDC)

%.5

%.5 73.2

{

17. ' UNIT CAPACITY FACTOR (USING DESIGN We)

%.5

%.5 73.2

18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.7
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

None

20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO CONMERCIAL OPERATION):

ACHIEVED C0 K RCIAL OPERATION:

900813 ESTIMATED

)

i Attachment to TXX 97029 Pags 2 of 8 -

l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

50 445 UNIT:

CPSES 1

DATE:

2/10/97 COMPLETED BY:

Bob Reible i

TELEPHONE:

897 0449 l

MONTH:

JANUARY 1997 i

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (We Net)

DAY (HWe Net) i 1

1111 17 1112 2

1111 18 1114 l

3 1110 19 1114 4

1052 20 1114

}

5 1113 21 1114 1

6 1112 22 1114 7

1112 23 1113 8

1112 24 1112 9

1113 25 1113 10 1113 26 1113 11 1083 27 1113 12 1111 28 1101 13 1112 29 1113 14 1112 30 1114 15 1113 31 1113 16 1113 i

AtticWnttoTXX97029 Page 3 of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:

50-445 UNIT:

CPSES 1

DATE:

2/10/97 COMPLETED BY:

Bob Reible TELEPHONE:

897 0449 HONTH:

JANUARY 1997 J

DAY TIME REMARK / MODE 01/01 0000 Unit began the month at 1001 power.

01/31 2400 Unit ended the month at 100* power.

i l

Attechnent to TXX-97029

~

Page 4 of 8 UNIT SHUTDOWNS.AND POWER REDUCTIONS 1

DOCKET NO.:

50-445 UNIT:

CPSES 1

DATE:

.2/10/97 COMFLETED BY:

Bob Reible TELEPHONE:

897-0449 f

REPORT MONTH:

JANUARY 1997 METHOD OF TYPE SHUTTING DOWN t

F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS /COMENTS I

i NONE 6

1)

REASON 2)

ETHOD i

A:

EQUIPMENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCRAM C:

REFUELING G:

OPERATIONAL ERROP. (EXPLAIN) 3: AUTOW. TIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

F i

i L

s b

f L

a

.a

Attachment to TXX 97029 Page 5 of 8 j

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:

50 446 UNIT:

CPSES 2 DATE:

2/10/97 COMPLETED BY:

Bob Reible l

TELEPHONE:

897 0449 OPERATING STA11JS 2.

REPORTING PERIOD:

JANUARY 1997 GROSS HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AU1110RIZED POWER LEVEL (MWt):

3411 MAX. DEPEND. CAPACITY (HWe Net):

1150 DESIGN ELECTRICAL RATING (MWe Net):

1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):

NONE 4.

REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 662 662 25,143 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 2,229 7.

HOURS GENERATOR ON LINE 641 641 24,875 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2.118,763 2,118,763 80,402,390

10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 722.129 722.129 27.114,229
11. NET ELECTRICAL ENERGY GENERATED (MWH) 690.736 690,736 25,919,467
12. REACTOR SERVICE FACTOR 88.9 88.9 82.0
13. REACTOR AVAILABILITY FACTOR 88.9 88.9 89.3
14. UNIT SERVICE FACTOR 86.2 86.2 81.1
15. UNIT AVAILABILITY FACTOR 86.2 86.2 81.1
16. UNIT CAPACITY FACTOR (USING MDC) 80.7 80.7 73.5
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 80.7 80.7 73.5
18. UNIT FORCED OUTAGE RATE 0.0 0.0 7.3
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION:

930803 ESTIMATED

. _. _. ~........ _ _ _ _ _._ __ _ _. _._.. -

Attechnent to TXX 97029 3

Pagh Q of 8 i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

50 446 UNIT:

CPSES 2

1 DATE:

2/10/97 COMPLETED BY:

Bob Reible i

TELEPHONE:

897 0449

^

MONE:

JANUARY 1997 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL i

I DAY (We Net)

DAY (MWe-Net) 1 1124 17 1122 i

i 2

1124 18 1123 3

1123 19 1123 4

516 20' 1123

)

i 5

0 21 1124 6

0 22 1124 7

0 23 1124 8

0 24 1124 9

384 25 1125 l

j 10 1078 26 1125 11 1121 27 1124 i

12 1122-28 1123 l

13 1122 29 1123 14 1123 30 1124 15 '

1123 31 1124 16 :

1123 l

l

i Attachment to TXX 97029 Page 7 of 8 -

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH

)

DOCKET NO.:

50 446 UNIT:

CPSES 2

DATE:

2/10/97 COMPLETED BY:

Bob Reible TELEPHONE:

897 0449 MONTH:

JANUARY 1997 4

DAY TIME REMARK / MODE 01/01 0000 Unit began the month at 100* power.

j i

01/04 1620 Unit entered a planned maintenance outage per dispatcher request to repair an oil leak on capacitance coupled voltage transformer e

(CCVT) in the switchyard. Additionally, completed repair work on main feedwater isolation valves and main transformer 2MT2 as well as i

heater drain pump 2 02 shaft replacement and main feedwater pump bearing inspections. Unit entered Mode 3.

~

01/08 0249 Unit entered Mode 2.

2240 Unit entered Mode 1.

2251 Unit synchronized to the grid and began power ramp up.

1 01/10 1457 Unit achieved 1001 power.

4

(

I i

e 4

~

~

Attachment to TXX-97029 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-446 UNIT:

CPSES 2

DATE:

2/10/97 COMPLETED BY:

Bob Reible TELEPHONE:

897-0449 REPORT MONTH.

JANUARY 1997 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS /COMENTS 1

970104 S

102.5 B

1 Unit entered planned maintenance outage to repair oil leak to the capacitance coupled voltage transformer (CCVT). (See previous page for additional details).

1)

REASON 2)

ETHOD A:

EQUIPMENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCRAM C:

REFUELING

. G:

OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

-