Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2
ML20101D046
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/29/1996
From: Reible B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20101D045 List:
References
NUDOCS 9603190350
Download: ML20101D046 (8)


Text

Attachment to TXX-96073 Pqge 1 of 11 COMANCHE PEAK STEAM ELECTRlC STATION, UNIT 1 NRC HONTHLY OPERATING REPORT DOCKET NO.:

50 445 UNIT:

CPSES 1 DATE:

3/ 8/96 COMPLETED BY:

Bob Reible TELEPHONE:

817 897 0449 OPERATING STATUS 1.

REPORTING PERIOD:

FEBRUARY 1996 GROSS HOURS IN REPORTING PERIOD:

696 2.

CURRENTLY AIRHORIZED POWER LEVEL (HWt):

3411 MAX. DEPEND. CAPACITY (HWe Net):

1150 DESIGN ELECTRICAL RATING (HWe Net):

1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):

NONE 4.

REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 614 1.057 39,809 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 2,604 7.

HOURS GENERATOR ON LINE 602 1,040 39,229 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERHAL ENERGY GENERATED (HWH) 1,825,920 3.252,650 126,677.903

10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 670.850 1,152,036 42,218.239
11. NET ELECTRICAL ENERGY GENERATED (HWH) 639.745 1,090,303 40,257.496
12. REACTOR SERVICE FACTOR 88.3 73.4 81.8
13. REACTOR AVAILA8ILITY FACTOR 88.3 73.4 87.2
14. UNIT SERVICE FACTOR 86.5 72.2 80.6
15. UNIT AVAILABILITY FACTOR 86.5 72.2 80.6
16. UNIT CAPACITY FACTOR (USING HDC) 79.9 65.8 72.0
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 79.9 65.8 72.0
18. UNIT FORCED OUTAGE RATE 13.5 27.8 5.3
19. SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIHATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATFD 9603190350 960315 PDR ADOCK 05000445 R

PDR

Attachment to TXX %073 Page 2 of 11 AVERAGE DAILY UNIT POWER LEVEL DOCKET N0,:

50 445 UNIT:

CPSES 1

DATE:

3/ 8/96 COMPLETED BY:

Bob Reible.

TELEPHONE:

817 897 0449 MONTH:

FEBRUARY 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net)

DAY (HWe Net) 1 0

17 1109 2

0 18 1109 3

0 19 1109 4

0 20 1109 5

307 21 1109 6

961 22 1109 7

1112 23 1109 8

1113 24 1110 9

1113 25 1110 t

10 1113 26 1111 11 1112 27 1111 12 1111 28 1111 13 1111 29 1110 14 1110 15 1110 16 1109

I Attachment to TXX %073 Page 3 of 11

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:

50 445 UNIT:

CPSES 1

DATE:

3/ 8/%

COMPLETED BY:

Bob Reible TELEPHONE:

817 897 0449 HONTH:

FEBRUARY 19%

DAY-TIME REMARK / MODE 02/01 0000 Unit continued in MODE 5 from the January outage to repair / increase i

the reliability of the inverters.

1845 Unit entered MODE 4.

j 02/02 2339 Unit entered MODE 3.

4 02/04 0946 Reactor critical. Unit entered MODE 2.

1411 Unit entered MODE 1.

1 1428 Unit synchronized to the grid.

1630 Hanually tripped the turbine as a result of tripping of both main i

feedwater pumps on low suction pressure, due to improper venting of I

feedwater heaters. Unit in MODE 2.

2316 Unit entered MODE 1.

02/05 0013 Unit synchronized to the grid.

1246 Unit held at 451 power to troubleshoot & align Heater Drain valve 1 LV 2592.

l 1715 Continued power ramp up of unit.

02/06 1345 Unit at 100* power.

~

02/29 2400 Unit ended the month at 100* Pce r.

Attachment to TXX-%073

' Page 4 of 11 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-445 UNIT:

CPSES 1

DATE:

3/ 8/%

4 COMPLETED BY:

Bob Reible TELEPHONE:

817-897-0449 REPORT MONTH:

FEBRUARY 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 2

% 0201 F

86.4 A

2 Inverter outage continued from previous month. See previous page. LER 445/%-002-00.

3

% 0204 F

7.7 G

1 Manually tripped the turbine due to tripping of both main feedwater pumps on low suction pressure as auxiliary feedwater pumps activated. See previous page. LER 445/%-003-00.

4

% 0205 F

A 4

Unit held at 45% power due to valve 1-LV-2592 problems. See previous page.

1)

REASON 2)

METHOD A:

EQUIPENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCRAM C:

REFUELING G:

OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN) r I

I r

-_,a

Attachment to TXX 96073 Page 5 of 11 -

)

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:

50 446 UNIT:

CPSES 2 DATE:

3/ 8/96 COMPLETED BY:

Bob Reible TELEPHONE:

817 897 0449 OPERATING STATUS j

1.

REPORTING PERIOD:

FEBRUARY 1996 GROSS HOURS IN REPORTING PERI 00:

696 l

2.

CURRENTLY AUTHORIZED POWER LEVEL (HWt):

3411 MAX. DEPEND CAPACITY (MWe Net):

1150 l

DESIGN ELECTRICAL RATING (HWe-Net):

1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):

NONE 4.

REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 1

l 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 035 1.279 18.824 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 2.229 7.

HOURS GENERATOR ON LINE 535 1.279 18.602 l

8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

l 9.

GROSS THERHAL ENERGY GENERATED (HWH) 1.732.152 4.261.224 59,824.135 l

10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 590.277 1.454,985 20.159.606
11. NET ELECTRICAL ENERGY GENERATED (MWH) 565.044 1.398.017 19.256.375
12. REACTOR SERVICE FACTOR 76.9 88.9 83.4
13. REACTOR AVAILABILITY FACTOR 76.9 88.9 93.3 14.-UNIT SERVICE FACTOR 76.9 88.9 82.4
15. UNIT AVAILABILITY FACTOR 76.9 88.9 82.4 l
16. UNIT CAPACITY FACTOR (USING HDC) 70.6 84.4 74.2
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 70.6 84.4 74.2
18. UNIT FORCED OUTAGE RATE 1.7 0.7 6.9
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):

l Refueling outage 2RF02 began February 23,19% with an estimated duration of 42 days.

20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:

4/ 4/96

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED d

Attachment to TXX %073 Page 6 of 11 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

50 446 UNIT:

CPSES 2

DATE:

3/ 8/96 COMPLETED BY:

Bob Reible TELEPHONE:

817 897 0449 MONTH:

FEBRUARY 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY

.(MWe Net)

DAY (MWe Net) l 1

1099 17 1004 2

1120 18 998 3

1125 19 987 I

4 1118 20

'973 5

1122 21 965 6

1124 22 950 7

1124 23 237 8

1126 24 0

9 1124 25 0

10' 1113 26 0

11 1101 27 0

12 1081 28 0

j 13 1074 29 0

14 1024 15 1012 l

16 1013 4

8 l

,m.

-+_

.-..y

.. _ _. _. _... _ _ _. - - _ _ _ _. = - - _ -.. _ _ _.... - _.

' Attachment to TXX 96073-Page 7 of 11

SUMMARY

OF OPERATI G EXPERIENCE FOR THE MONTH DOCKET NO.:

50 446 l

UNIT:

CPSES 2

DATE:

3/ 8/96 COMPLETED BY:

Bob Reible TELEPHONE:

817 897 0449 l

HONTH:

FEBRUARY 1996 l

DAY TlHE REMARK /H00E l

02/01 0000 Unit began the month at 100% Power.

1207 Condensate Polishing Vessel 'E' partially isolated, causing a reduction in condensate /feedwater flow. Unit stabilized at 86% power.

t I

PIl0 0627 Unit began coast down for refueling outage 2RF02.

l 02/14 0832 Loss of feedwater heaters followed by automatic turbine runback due to the unexpected opening of feedwater heater bypass valve 2 PV 2286 resulting from the closing of Gland Steam Condenser (GSD) condensate bypass flow control valve 2-FV-2243 upon the removal of an associated l

controller card for calibration. Following the turbine runback, unit l

stabilized at 871 electric power. As part of corrective measure, l

issued Instrumentation & Control procedure changes'to address precautions for shared card scenario, l

l 02/23-0152 Unit began end of cycle ramp down to start 2RF02.

i 0729 Turbine unexpectedly shed load. The reactor was manually tripped and the Unit entered refueling outage 2RF02.

02/29 2400 Unit in refueling outage. H0ti L l

l r

a

.I f

i

Atttchment to TXX-%073 Page 8 of 11 UNIT SHUTDOWNS AND POWEP. REDUCTIONS DOCKET NO.:

50-446 UNIT:

CPSES 2

DATE:

3/ 8/%

COMPLETED BY:

Bob Rei!.e TELEPHONE:

817-897-0449 REPORT MONTH.

FEBRUARY 19%

METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS /COPMENTS 1

% 0201 F

A 4

Manual turbine runback due to low feedwater suction pressure.

1 2

% 0214 F

H 4

Automatic turbine runback due to unexpected opening of feedwater heater bypass valve 2-PV-2286. See previous page.

3

% 0223 F

9.5 A

2 Manual reactor trip after turbine unexpectedly shed load during ramp down for refueling outage 2RF02. See previous page. LER 446/ % -002-00.

4

% 0223 S

151.0 C

1 Unit entered refueling outage 2RF02.

1)

REASON 2)

METHOD A:

EQUIPMENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCRAM C:

REFUELING G:

OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN)