Attachment to TXX-96073 Pqge 1 of 11 COMANCHE PEAK STEAM ELECTRlC STATION, UNIT 1 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 445 UNIT:
CPSES 1 DATE:
3/ 8/96 COMPLETED BY:
Bob Reible TELEPHONE:
817 897 0449 OPERATING STATUS 1.
REPORTING PERIOD:
FEBRUARY 1996 GROSS HOURS IN REPORTING PERIOD:
696 2.
CURRENTLY AIRHORIZED POWER LEVEL (HWt):
3411 MAX. DEPEND. CAPACITY (HWe Net):
1150 DESIGN ELECTRICAL RATING (HWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS HONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 614 1.057 39,809 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2,604 7.
HOURS GENERATOR ON LINE 602 1,040 39,229 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERHAL ENERGY GENERATED (HWH) 1,825,920 3.252,650 126,677.903
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 670.850 1,152,036 42,218.239
- 11. NET ELECTRICAL ENERGY GENERATED (HWH) 639.745 1,090,303 40,257.496
- 12. REACTOR SERVICE FACTOR 88.3 73.4 81.8
- 13. REACTOR AVAILA8ILITY FACTOR 88.3 73.4 87.2
- 14. UNIT SERVICE FACTOR 86.5 72.2 80.6
- 15. UNIT AVAILABILITY FACTOR 86.5 72.2 80.6
- 16. UNIT CAPACITY FACTOR (USING HDC) 79.9 65.8 72.0
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 79.9 65.8 72.0
- 18. UNIT FORCED OUTAGE RATE 13.5 27.8 5.3
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIHATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATFD 9603190350 960315 PDR ADOCK 05000445 R
Attachment to TXX %073 Page 2 of 11 AVERAGE DAILY UNIT POWER LEVEL DOCKET N0,:
50 445 UNIT:
CPSES 1
DATE:
3/ 8/96 COMPLETED BY:
Bob Reible.
TELEPHONE:
817 897 0449 MONTH:
FEBRUARY 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net)
DAY (HWe Net) 1 0
17 1109 2
0 18 1109 3
0 19 1109 4
0 20 1109 5
307 21 1109 6
961 22 1109 7
1112 23 1109 8
1113 24 1110 9
1113 25 1110 t
10 1113 26 1111 11 1112 27 1111 12 1111 28 1111 13 1111 29 1110 14 1110 15 1110 16 1109
I Attachment to TXX %073 Page 3 of 11
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
3/ 8/%
COMPLETED BY:
Bob Reible TELEPHONE:
817 897 0449 HONTH:
FEBRUARY 19%
DAY-TIME REMARK / MODE 02/01 0000 Unit continued in MODE 5 from the January outage to repair / increase i
the reliability of the inverters.
1845 Unit entered MODE 4.
j 02/02 2339 Unit entered MODE 3.
4 02/04 0946 Reactor critical. Unit entered MODE 2.
1411 Unit entered MODE 1.
1 1428 Unit synchronized to the grid.
1630 Hanually tripped the turbine as a result of tripping of both main i
feedwater pumps on low suction pressure, due to improper venting of I
feedwater heaters. Unit in MODE 2.
2316 Unit entered MODE 1.
02/05 0013 Unit synchronized to the grid.
1246 Unit held at 451 power to troubleshoot & align Heater Drain valve 1 LV 2592.
l 1715 Continued power ramp up of unit.
02/06 1345 Unit at 100* power.
~
02/29 2400 Unit ended the month at 100* Pce r.
Attachment to TXX-%073
' Page 4 of 11 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-445 UNIT:
CPSES 1
DATE:
3/ 8/%
4 COMPLETED BY:
Bob Reible TELEPHONE:
817-897-0449 REPORT MONTH:
FEBRUARY 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 2
% 0201 F
86.4 A
2 Inverter outage continued from previous month. See previous page. LER 445/%-002-00.
3
% 0204 F
7.7 G
1 Manually tripped the turbine due to tripping of both main feedwater pumps on low suction pressure as auxiliary feedwater pumps activated. See previous page. LER 445/%-003-00.
4
% 0205 F
A 4
Unit held at 45% power due to valve 1-LV-2592 problems. See previous page.
1)
REASON 2)
METHOD A:
EQUIPENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) r I
I r
-_,a
Attachment to TXX 96073 Page 5 of 11 -
)
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 446 UNIT:
CPSES 2 DATE:
3/ 8/96 COMPLETED BY:
Bob Reible TELEPHONE:
817 897 0449 OPERATING STATUS j
1.
REPORTING PERIOD:
FEBRUARY 1996 GROSS HOURS IN REPORTING PERI 00:
696 l
2.
CURRENTLY AUTHORIZED POWER LEVEL (HWt):
3411 MAX. DEPEND CAPACITY (MWe Net):
1150 l
DESIGN ELECTRICAL RATING (HWe-Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 1
l 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 035 1.279 18.824 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2.229 7.
HOURS GENERATOR ON LINE 535 1.279 18.602 l
8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
l 9.
GROSS THERHAL ENERGY GENERATED (HWH) 1.732.152 4.261.224 59,824.135 l
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 590.277 1.454,985 20.159.606
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 565.044 1.398.017 19.256.375
- 12. REACTOR SERVICE FACTOR 76.9 88.9 83.4
- 13. REACTOR AVAILABILITY FACTOR 76.9 88.9 93.3 14.-UNIT SERVICE FACTOR 76.9 88.9 82.4
- 15. UNIT AVAILABILITY FACTOR 76.9 88.9 82.4 l
- 16. UNIT CAPACITY FACTOR (USING HDC) 70.6 84.4 74.2
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 70.6 84.4 74.2
- 18. UNIT FORCED OUTAGE RATE 1.7 0.7 6.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):
l Refueling outage 2RF02 began February 23,19% with an estimated duration of 42 days.
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
4/ 4/96
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED d
Attachment to TXX %073 Page 6 of 11 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
3/ 8/96 COMPLETED BY:
Bob Reible TELEPHONE:
817 897 0449 MONTH:
FEBRUARY 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
.(MWe Net)
DAY (MWe Net) l 1
1099 17 1004 2
1120 18 998 3
1125 19 987 I
4 1118 20
'973 5
1122 21 965 6
1124 22 950 7
1124 23 237 8
1126 24 0
9 1124 25 0
10' 1113 26 0
11 1101 27 0
12 1081 28 0
j 13 1074 29 0
14 1024 15 1012 l
16 1013 4
8 l
,m.
-+_
.-..y
.. _ _. _. _... _ _ _. - - _ _ _ _. = - - _ -.. _ _ _.... - _.
' Attachment to TXX 96073-Page 7 of 11
SUMMARY
OF OPERATI G EXPERIENCE FOR THE MONTH DOCKET NO.:
50 446 l
UNIT:
CPSES 2
DATE:
3/ 8/96 COMPLETED BY:
Bob Reible TELEPHONE:
817 897 0449 l
HONTH:
FEBRUARY 1996 l
DAY TlHE REMARK /H00E l
02/01 0000 Unit began the month at 100% Power.
1207 Condensate Polishing Vessel 'E' partially isolated, causing a reduction in condensate /feedwater flow. Unit stabilized at 86% power.
t I
PIl0 0627 Unit began coast down for refueling outage 2RF02.
l 02/14 0832 Loss of feedwater heaters followed by automatic turbine runback due to the unexpected opening of feedwater heater bypass valve 2 PV 2286 resulting from the closing of Gland Steam Condenser (GSD) condensate bypass flow control valve 2-FV-2243 upon the removal of an associated l
controller card for calibration. Following the turbine runback, unit l
stabilized at 871 electric power. As part of corrective measure, l
issued Instrumentation & Control procedure changes'to address precautions for shared card scenario, l
l 02/23-0152 Unit began end of cycle ramp down to start 2RF02.
i 0729 Turbine unexpectedly shed load. The reactor was manually tripped and the Unit entered refueling outage 2RF02.
02/29 2400 Unit in refueling outage. H0ti L l
l r
a
.I f
i
Atttchment to TXX-%073 Page 8 of 11 UNIT SHUTDOWNS AND POWEP. REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
3/ 8/%
COMPLETED BY:
Bob Rei!.e TELEPHONE:
817-897-0449 REPORT MONTH.
FEBRUARY 19%
METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /COPMENTS 1
% 0201 F
A 4
Manual turbine runback due to low feedwater suction pressure.
1 2
% 0214 F
H 4
Automatic turbine runback due to unexpected opening of feedwater heater bypass valve 2-PV-2286. See previous page.
3
% 0223 F
9.5 A
2 Manual reactor trip after turbine unexpectedly shed load during ramp down for refueling outage 2RF02. See previous page. LER 446/ % -002-00.
4
% 0223 S
151.0 C
1 Unit entered refueling outage 2RF02.
1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN)