1 Attachment to TXX-98261 Page l of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT

. . DOCKET NO. 50-445 UNIT: CPSES 1 OATE: 12/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 OPERATING STATUS

1. REPORTING PERIOD: NOVEM8ER 1998 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
  • DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE 4 REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5 NUMBER OF HOURS REACTOR WAS CRITICAL 720 7.130 61.891 6 REACTOR RESERVE SHUTDOWN HOURS 0 0 2.632 7 HOURS GENERATOR ON LINE 720 7.105 61,215 8 UNIT RESERVE SHUTDOWN HOURS 0 0 0 9 GROSS THERMAL ENERGY GENERATED (MWH) 2.454.118 23.928.180 200.707.964

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 828.315 8.023.780 67.095.740
11. NET ELECTRICAL ENERGY GENERATED (MWH) 796.125 7.684.154 64.086.466
12. REACTOR SERVICE FACTOR 100.0 88.9 85.1 j
13. REACTOR AVAILABILITY FACTOR 100.0 88.9 88.7
14. UNIT SERVICE FACTOR 100.0 88.6 84.1
15. UNIT AVAILABILITY FACTOR 100.0 88.6 84.1
16. UNIT CAPACITY FACTOR (USING MDC) 96.2 83.4 76.6
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.2 83.4 76.6
18. UNIT FORCED OUTAGE RATE 0.0 0.0 3.7
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED 9812160126 981211 7 PDR ADOCK 05000445 R PDR .1

. ., - .. _ , _ _ _ ~ _ .. . ._ ._. __ ._. . - _ _ _ _ . _ . _ _ . _ _ _ . _ . . _ _ _

-- Attachment to TXX- 98261

' Page 2' , 'of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-445 UNIT: CPSES 1 DATE: 12/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 MCilTH: NOVEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) ,

1 1102 17 1109 2' 1103 18 1107 3 1103 19 1106 4 1104 20 1106 5 1105 21 1106 6 1105 22 1106 7 1104 23 1107 8 1106 24 1107' 9 1106 25 1106 l l

10 1107 26 1105 11 1106 27 1105 12 1106 28 1105 13 1106 29 1105

]

14 1107 30 1105

15. 1107 31  !

'16 1110 i

I e

a

  1. "Np ~

l Attachment to TXX- 98261

'Page .3* of.

8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-445 1 UNIT: CPSES 1 DATE: 12/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449

-MONTH: NOVEMBER 1998 DAY TIME REMARK / MODE 11/01 '0000 Unit began the month at 100% power.

11/30 2400 Unit ended the month at 100% power.

l i

r I

F 4 l

Attachment to TXX .'98261

  • Page 4 of 8.

UNIT SHUTDOWNS AND POWER REDUCTIONS ,

DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 12/ 9/98 COMPLETED BY: Bob Reible -

TELEPHONE: '254-897-0449 ..

NOVEMBER 1998 REPORT MONTH:

METHOD OF TYPE SHb1 TING DOWN .

F: FORCED DURATION THE REACTOR OR '

NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS I

N0'!E None i

1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM ,

C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM ,

D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) t P

e ,

.. . - - .- . ~ . .

= Attachment to TXX-98261 ,

Page S of 8 :

COMANCHE PEAK STEAM ELECTRIC STATION. UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO. 50-446 UNIT: CPSES 2 DATE: 12/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 OPERATING STATUS

~1, REPORTING PERIOD: NOVEMBER 1998 GROSS HOURS IN REPORTING PERIOD: 720 i

-2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150

  • DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTP.ICTED (IF ANY) (MWe-Net): NONE 4 REASON FOR PESTRICTION (IF ANY)

THIS MONTH YR TO DATE CUMULA.IVE 5 NUMBER OF HOURS REACTOR WAS CRITICAL 720 8,001 40.105 6 REACTOR RESERVE SHUTDOWN HOURS 0 15 2,326 7 HOURS GENERATOR ON LINE 720 7,997 39,786  :

8 UNIT RESERVE SHUTDOWN HOURS 0 0- 0 I 9 GROSS THERMAL ENERGY GENERATED (MWH) 2,450.885 26.225,604 129,331,490 I 10,- GROSS ELECTRICAL ENERGY GENERATED (MWH) 836,407 8,868.305 43,669,617 1 1

'11. NET ELECTRICAL ENERGY GEF RATED (MWH) 803,418 8,514.068 41.804,849 l 12. REACTOR SERVICE FACTOR 100.0 99.8 85.9 i I

13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.9 j f 1
14. UNIT SERVICE FACTOR 100.0 99.8 85.2 l l
15. UNIT AVAILABILITY FACTOR 100.0 99.8 85.2
16. UNIT CAPACITY FACTOR (USING HDC) 97.0 92.4 77.8
'17.1' UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.0 92.4 77.8

-18. . UNIT FORCED OUTAGE RATE 0.0 0.2 4.7

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF cA;g);

_ 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED t

COMMERCIAL OPERA 110N 930803 ESTIMATED

' Attachment'to TXX- 98261

_. ~ . . .. .. . ~. . . .- - . . _ - . . - . - -

Page. 6 ;-of 8 5

  • AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50-446 UNIT: CPSES 2 DATE: 12/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 MONTH: NOVEMBER 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1113 17 1114 2 1114 18 1118

'3 1116 19 1118 4 1118 20 1118 5 1119 21 1111 6 1118 22 1069 7 1118 23 1118 8 1118 24 1119 9- 1118 25 1118

.10 1120 26 1119 11- 1119 27 1118 12 1119 28 1118 13 1120 29 1118 i 14- 1119 30 1118 15 1119 31 16 1115 l

I A

4

Attachment to TXX- 98261 Page ' 7"- . of 8

~. .

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.- 50-446

. . UNIT: CPSES 2 DALE: 12/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 MONTH: NOVEMBER 1998 -

DAY TIME REMARK / MODE -

\

11/01 0000 Unit began the month at 100% power.

11/30 2400 Unit ended the month at 100% power.

l i

i l

4

--Attachment to'lxx IW261 Page 8 - of 8

.}

' UNIT SHUTDOWNS'AND POWER REDUCTIONS DOCKET NO.- '50-446 UNII: CPSES ^2 DATE: 12/ 9/98 COMPLETED BY: Bob Reible ,

TELEPHONE: 254-897-0449 REPORT MONTH: NOVEMBER 1998 .

METHOD Gi

. TYPE SHUTTING DOWN

-F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS None None i

i

1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: HANUAL B: MAINT OR TEST F: ADMINISTPATIVE 2: MANUAL SCRAM i C: REFUELING G: OPERATICdAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

I tm_ _ - . _ .__ __ _ _ _ _ _ _ _ _ _ - - _ . _ . _ _ _ _ _ _ ____._m__ __._ __ -+ _. -- .-