Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2
ML20202H043
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/31/1998
From: Reible B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20202H032 List:
References
NUDOCS 9802200281
Download: ML20202H043 (8)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -- ------ -

Attachment to TXX 98031 Page 1 of 8 C')MANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC HONTHLY OPERATING REPORT DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 2/11/98 COMPLETED BY: Bob Reible TELEPHONE: 254 897 0449 OPERATING STATUS

1. REP ^0 TING PERIOD: JANUARY 1998 GROSS HOURS IN REPORTING PER00: 744
2. CC iu'TLY AUTHORIZE 0 POWER LEVEL (HWt): 3411 MAX. DEPEND. CAPACITY (HWe Net):
  • 1150 DESIGN ELECTRICAL RATING (HWe Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUMULATIVE l

5. NUMBER OF HOURS REAC',JR WAS CRITICAL 744 744 55,505
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,632
7. HOURS GENEDATOR ON LINE 744 744 54,854
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERHAL ENERGY GENERATED (HWH) 2 531,683 2,531,683 179,311,467
10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 857,893 857,893 59,929,853
11. NET ELECTRICAL ENERGY GENERATED (HWH) 824,812 824.E12 57,227,124
12. REACTOR SERVICE FACTOR 100.0 100.0 84.8
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 88.8
14. UNIT SERVICE FACTOR 100.0 100.0 83.8
15. UNIT AVAILABILITY FACTOR 100.0 100.0 83.8
16. UNIT CAPACITY FACTOR (USING HDC) 96.4 96.4 .0
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 96.4 96.4 76.0
18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.1
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Unit sixth refueling outage scheduled to start March 21, 1998 with an approximate duration of 5 weeks.

20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL CPERATION 900813 ESTDtATED 9002200281 980216 PDR ADOCK 05000445 R PDR

Attachment to TXX 98031 I Page 2 of 8 i

AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO : 50 445 UNIT: CPSES 1 DATE: 2/11/98 COMPLETED BY: Bob Reible TELEPHONE: 254 897 0449 HONTH: JANUARY 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net) DAY (MWe Net) 1 1113 17 1053 2 1114 18 1110 3 1113 19 1110 4 1112 20 1109 4

5 1111 21 1109 6 1112 22 1109 7 1112 23 1109 1

8 1111 24 1110 9 1112 25 1110 10 1111 26 1110 11 1111 27 1110 12 1110 28 1111 13 1110 29 1110 14 1110 30 1112 15 1110 31 1111 16 1104

Attachment to TXX 98031 Page 3 of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 2/11/98 COMPLETED BY; Bob Reible TELEPHONE: 254 897 0449 HONTH: JANUARY 1998 DAY TIME REMARK / MODE 01/01 0000 Unit began the month at 100% power.

01/31 2400 Unit ended the montn 2t 100% power.

I J

4

_m._. -, - . _ . ~ _ _ _ - - . - - . _ _ . _ . . _ _ _ ._. . . . _ - . . _ . - .. .. . . _ . _ . . . -

3 i

Attactment to -TXX-98031 .,

Page 4 of 8 UNIT SHUTDOWNS AN) POWER REDUCTIONS ,

i DOCKET NO.: 50-445 .

UNIT: CPSES 1 DATE: 2/11/98 ,

COMPLETED BY: Bob Reible t TELEPHONE: 254-897-0449 REPORT MONTH. JANUARY 1998 METHOD OF TYPE SHUTTING DOWN ,

F: FORCED DURATION .HE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS /COPMENTS 4

None None

1) REASON 2) METHOD

,' A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM  !

C
REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM >

D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) ,

1 l

f i

i

Attachment to VXX 98031 Page 5 of 8 C0HANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 2/11/98 COMPLETED BY: Bob Reible TELEPHONE: 254 897 0449 OPERATING STATUS

1. REPORTING PERIOD: JANUARY 1998 GROSS HOURS IN REPORTING PER00: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (HWt): 3411 MAX. DEPEND, CAPACITY (HWe Net): 1150
  • DESIGN ELECTRICAL RATING (HWe Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net): NONE 4 REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUHULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 32,848:
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2.311
7. HOURS GENERATOR ON LINE 744 744 32,532
8. . UNIT RESERVE SHUTDOWN HOURS 0 0 0 I
9. GROSS THERHAL ENERGY GENERATED (HWH) 2,532,970 2,532,970 105,638,855
10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 865,991 865.991 35,667,303
11. NET ELECTRICAL ENERGY GENERATED (HWH) 834,724 834.724 34.125.505
12. REACTOR SERVICE FACTOR 100.0 100.0 83.3
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 89.2.
14. UNIT SERVICE FACTOR' 100.0 100,0 82.5
15. UNIT AVAILABILITY FACTOR 100.0 100.0 82.5
16. UNIT CAPACITY FACTOR (USING HDC) 97.6 97.6 75.3
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 97.6 97.6 75.3
18. UNIT FORCED OUTAGE RATE 0.0 0.0 5.7
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL-OPERATION 930803 ESTIMATED

- . .- . _ _ .- _ - -- . - _ _ . - . _ = _ - - - - - - _ ,

Attachment to TXX 98031 Page 5 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.: 50 446 UNIT: CPSFS 2 DATE: 2/11/98 COMPLETED BY: Bob Reible TELEPHONE: 254 897 0449 P

MONTH: JANUARY 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (HWe Net) DAY (HWe Net) 1 1123 17 1124 2 1123 18 1124 3 1124 19 1124 4 1124 20 1124 5 1125 21 1124 6 1124 22 1124 7 1123 23 1117 8 1123 24 1087 9 1123 25 1114 10 1124 26 1124 11 1124 27 1124 12 1124 28 1124 13 1123 29 1124 14 1123 30 1124 15 1123 31 1125 16 1122 4

t l

l r

l

.=- ._. -_ ~ .

o l

Attachnent to TXX 98031 l Page 7 of 8 '

SUMMARY

OF OPERATING EXPERIENCE FOR THE HONTH DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 2/11/98

' COMPLETED BY: Bob Reible TELEPHONE: 254 897 0449 HONTH: JANUARY 1998 DAY TIME REMARK /,@ E 01/01 0000 Unit hgan the month at 100% power.

01/31 2400 Unit ended the month at 100% power,

'. . i Attachment to TXX-98031 7. - 5 Page 8 of 8 i UNIT SHUTDOWNS AND POWER REDUCTIONS 1

DOCKET NO.:. 50-446 .- j' UNIT: CPSES ,2 DATE: 2/11/98- i COMPLETED BY: Bob Reible  !

TELEPHONE: 254-897-0449 1

REPORT MONTH. JANUARY 1998  ;

METHOD OF

! TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED .(HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COP 9 TENTS t

!!one None ,

't

1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL  !

B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM s C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM '[

D: REGULATORY RESTPICTION H: OTHER (EXPLAIN) 4: OTHEP. (EXPLAIN) i I